ML17145A485

From kanterella
Revision as of 19:07, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
James A. FitzPatrick - Inservice Inspection Summary Report 2017 Refuel Outage 22
ML17145A485
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/25/2017
From: William Drews
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-17-0057
Download: ML17145A485 (6)


Text

Exelon Generation

. JAFP-17-0057 May 25, 2017 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Exelon Generation

Company, LLC James A FitzPatrick NPP PO Box 110 Lycoming, NY 13093 Tel 315-342-3840 William C. Drews Regulatory Assurance Manager -JAF

Subject:

lnservice Inspection Summary Report 2017 Refuel Outage 22 James A. FitzPatrick Nuclear Power Plant Reference

Dear Sir or Madam:

Docket No. 50-333 License No. DPR-59 Entergy letter, Fourth Interval lnservice Inspection Program Plan, JAFP-07-0030, dated February 27, 2007 This letter submits the James A. FitzPatrick Nuclear Power Plant (JAF) Owner's Activity Report, Third Period, Fourth Interval JAF-RPT-17-00027 (Enclosure) which contains a summary of the lnservice Inspection (ISi) examinations conducted during the plant's 2017 Refuel Outage 22. Table 1 of the enclosed report summarizes the items with flaws or relevant indications that required evaluation for continued service and Table 2 provides an abstract of repair/replacement activities required for continued service. This Report is being submitted in accordance with JAF's approved Fourth Interval lnservice Inspection Program Plan [Reference 1 ]. There are no new regulatory commitments contained in this letter. If you have any questions in this regard, please contact Mr. Keith Schoales, Design Engineering Manager, at (315) 349-6452. Very truly yours, William C. Drews Regulatory Assurance Manager WCD/mh

Enclosure:

JAF Owner's Activity Report (OAR) Third Period, Fourth Interval cc: NRC Region 1 Administrator NRC Project Directorate NRC Resident Inspector NYSE RDA JAFP-17-0057 ENCLOSURE JAF Owner's Activity Report (OAR) Third Period, Fourth Interval (4 Pages)

AnAcHMENT9.1 SHEET 1OF1 ENGINEERING REPORT COVER SHEET & INSTRUCTIONS Engineering Report No. JAF-RPT-17-00027 Page Exelon Engineering Report Cover Sheet Engineering Report Title: Rev 0 of 4 ----1 JAF Owner's Activity Report (OAR) Third Period, Fourth Interval New 181 EC No. 619683 Prepared by: Design Verified:

Reviewed by: Engineering Report Type: Revision D Cancelled D Superseded D Superseded by: JAF 181 Report Origin: 181 Exelon D Vendor Vendor DocumentNo.:

____ Quality-Related:

181 Yes D No Jacqueline Mansfield

&61.J Date: '5 -d-.. -'d-Ol Responsible Engineer (Print Name/Sign)

NI A Date: NI A ----Design Verifier (ifrequired (Print Name/Sign)

Chelsea Gill I Date: [; / Z-4-j / 7 Date: Cl r;/e '1/1 ;z.

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number __ _,J.,_A,,._F_,-R_,,P_T,_-_,_17,_-""00""0""'2"""7 Plant

... r __ P __

__

... q.._ .

Plant Unit_......___

(if applicable)

Commercial Service Date -----'"'Ju=..1,,_y

.=.2 ... 8 . ._1._.9 .... 7_,,4 ____ _ Current Inspection lnterval: ____________

___,,,....,...,4t_h

,..,,...,-.,.,.....,,..,-,---

<1st, 2nd, 3rd, 4th, Other) Refueling Outage Number R22 Current Inspection Period: __ ....... 3r..,.d.__

________

.,.,....,.-::-o....,,....,,.-------------------------

<1st, 2nd, 3rd) Edition and Addenda of Section XI applicable to the Inspection Plan:

___ _ Date and Revision of Inspection Plan: SEP-ISl-007.

Rev. 8 03-08-2017 Edition and Addenda of ASME Section XI applicable to Repairs and Replacements, if different than the Inspection Plan: Same Code Cases used: N-504-4.

N-532-5, N-552, N-578-1, N-613-1, N-638-4.

N-639. N-648-1, N-663. N-666. N-686-1.

N-695, N-696, N-700, N-702, N-753, N-795 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) statements made in this report are correct; (b) the examination and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of R22 conform to the requirements of Section XI. (retueling outage number) Signed-s;-1, YY\o_n_s('('z_

{c\

Owner of Owner's Oesignee, Title: Sr. Engineer Date 5-d 3 -d,O) =f-CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New Jersey and employed by The Hartford Steam Boiler Inspection and Insurance Company of Hartford.

CT have inspected the items described in this Owner's Activity Report and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluations described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this _ =:-;-:::

Commissions 13855ANIC NJ948 National Board, State, Province, and Endorsements Date S-/.z'l)7 Table 1: Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Category Item Description Evaluation Description and Item Number None Table2: Abstract of Repair/Rei lacement Activities Reau ired for Continued Service REPAIR/ DESCRIPTION REPLACEMENT CODE ITEM OF DATE PLAN CLASS DESCRIPTION WORK COMPLETED NUMBER 3 66UC-22D Cooling Coil Replacement 2/26/2016 15-023 3 70PCV-100A1 A2 Repair Inlet Valve 2/4/2016 15-025 3 46ESW-12A Replace Elbow 4/29/2016 16-003 3 46SWS-120J Replace Elbow 4/29/2016 16-004 1 Snubber 12-1-HS-19 Replace Snubber 1/20/2017 16-028 1 ISi Weld 24-29-626A Repair Support 1/19/2017 16-086 1 02-2MOV-43A bonnet Code Case N-666 2/2/2017 16-091 line Overlay 1 24-10-130 Weld Overlay Repair 2/21/2017 17-004 3 Line 15-3"-WES-151-136 Replace Elbow 2/4/2017 17-007