ML17223B057

From kanterella
Revision as of 16:27, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Special Rept:On 901130,loose Parts Monitor Declared Out of Svc for More than 30 Days.Caused by Presence of Large Hz Signal.Troubleshooting Efforts Will Resume on Inaccessible Areas of Sys During Next Available Opportinity
ML17223B057
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/07/1991
From: SAGER D A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-91-13, NUDOCS 9101140102
Download: ML17223B057 (5)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEMRECIPIENT IDCODE/NAME PD2-2LANORRXS,JXNTERNAL:

ACNWAEOD/DOAAEOD/ROAB/DSP NRR/DET/EMEB 7ENRR/DLPQ/LPEB10 NRR/DREP/PRPBll NRR/DST/SICB 7ENRR/DST/SRXB 8ERES/DSIR/EIB COPIESLTTRENCL1111221122111122111111RECIPIENT IDCODE/NAME PD2-2PDACRSAEOD/DSP/TPABNRR/DET/ECMB 9HNRR/DLPQ/LHFB1 1NRR/DOEA/OEAB NRR/DST/SELB 8DCOPIESLTTRENCL11.22111111111111111-1REGULATORY INFORMATION DISTRIBUTION SYSTEM(RXDS)ACCESSION NBR:9101140102 DOC.DATE:

91/01/07NOTARIZED:

NOFACIL:50-389 St.LuciePlant,Unit'2,FloridaPower&LightCo.AUTH.NAMEAUTHORAFFILIATION SAGER,D.A.

FloridaPower.&LightCo.RECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)

SUBJECT:

Specialrept:on901130,loose partsmonitor.declaredoutofsvcforgreaterthan30days.Causedbypresence.

oflargeHZsignal.Sys undergone completechannelcalibr,per Tehspec4.3.3.8.c duringcompleted refueling outage.DISTRIBUTION CODE:IE22DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:50.73/50.9 LicenseeEventReport(LER),IncidentRpt,etc.NOTES:DOCKET05000389RD/ADsEXTERNAL:

EG&GBRYCE,J.H NRCPDRNSICMURPHY,G.A 331111LSTLOBBYWARDNSICMAYS,GNUDOCSFULLTXT111111DsNOTETOALL"RIDS"RECIPIENTS:

PLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOihlP1-37(EXT.20079)TOELIMINATE YOURNAMEFROiVIDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEED!TOTALNUMBEROFCOPIESREQUIRED:

LTTR33ENCL33DD J

P.O.ux128,Ft.Pierce,FL34954.0'IZE JAN7199!L-91-1310CFR50.36 U.SNuclearRegulatory Commission Attn:DocumentControlDeskWashington, DC20555Gentlemen:

Re:St.LucieUnit2DocketNo.50-389SpecialReportDateofEvent:November30,1990LoosePartsDetection SystemChannelOutofServiceTheattachedSpecialReportisbeingtransmitted pursuanttotherequirements ofSt.LucieUnit2Technical Specification 3.3.3.8andpursuanttoTechnical Specification 6.9.2Thereportprovidesnotification thataLoosePartsDetection Systemchannelwasoutofserviceforgreaterthanthirty(30)daysandtheplansforrestoring thechanneltoservice.Shouldtherebeanyquestions onthisinformation, pleasecontactus.Verytrulyyours,D.AagerViceresidentSt.LuciePlantDAS:GRM:kw DAS/PSLN323Attachment cc:.StewartD.Ebneter,RegionalAdministrator, RegionII,USNRCSeniorResidentInspector, USNRC,St.LuciePlant9'101140102 910107F'DRADOCK05000389PDRi(]

NRCSPECIALREPORTONECHANNELOFLOOSEPARTSMONITOROUTOFSERVICEFORAPERIODGREATERTHANALLOWEDBYTECHNICAL SPECIFICATIONS OnNovember30,1990Channel8oftheSt.LucieUnit2LoosePartsMonitor(LPM)wasdeclaredoutofserviceduetothepresenceofalarge60HZsignal.AsrequiredbyTechnical Specification 3.3.3.8thisSpecialReportisbeingsubmitted tonotifytheNRCthatthechannelhasbeenoutofservicegreaterthan30days.Thecauseofthisfailurehasnotyetbeendetermined.

becausenotallareasofthesystemareaccessible duringpoweroperations.

Allaccessible areasofthesystemhavebeeninvestigated.

Effortsarecontinuing toidentifythesourceoftheelectrical noise,andthemechanism forinduction intotheLoosePartsMonitoring System.Troubleshootingeffortsandinputfromthevendorpointtoafailedsensor/cable.

TheLPMsystemhadundergone acompletechannelcalibration perTECHSPEC4.3.3.8.c duringthejustcompleted refueling outage.Atthenextavailable opportunity troubleshooting effortswillresumeontheareasofthesystemnotaccessible whileatpower.Channel7and8oftheLoosePartsMonitorarelocatedonthe2BSteamGenerator, therefore Channel7isstillavailable foralarmfunctions onthe2Bsteamgenerator.

I,II~f,~