Rev 3 to JNS-PSL-203, Second 10-Yr Inservice Insp Interval Inservice Testing Program for Pumps & Valves,St Lucie Nuclear Power Plant,Unit 1.
ML17223B293
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/10/1991
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17223B294 List:
References
JNS-PSL-203, NUDOCS 9111010083
Download: ML17223B293 (218)


Text

FLORIDAPOWERandLIGHTCOMPANYNUCLEARENERGYSERVICES700UniverseBoulevard JunoBeach,Florida33408SECONDTEN-YEARINSERVICE INSPECTION INTERVALINSERVICE TESTINGPROGRAMFORPUMPSANDVALVESST.LUCIENUCLEARPOWERPLANTUNITNO.1NRCDOCKETNUMBER:50-335DOCUMENTNUMBER:JNS-PSL-203 REVISION3ADMINISTRATIVE APPROVALS:

APPROVEDBY:L..kJHa7t.eNSUPERVISOR

-CodeProgramsDATE:/C'ST.LUCIEPLANTREVEWSANDPROVLS:PREPAREDBY:PSLLANTSENGINEERDATE:APPROVEDBY:APPROVEDBY:PSLTEST&COEADNGINEERPTECNICLDEPT.SUPERVISOR DATE:DATE:PDp"O~~9'ii023p~ADQCQOSOQQ3+gPQR 0

REVISION39/1/91TableofContentsPacaeTableofContentsRecordofRevisions

1.0 Introduction

2.0Applicable Documents

3.0 Inservice

TestingProgramForPumps3.1CodeCompliance 3.2Allowable RangesofTestQuantities 3.3TestingIntervals 3.4PumpProgramTable3.5ReliefRequestsforPumpTesting4.04.'14.2'4.34~44.54.6Inservice TestingProgramForValvesCodeCompliance TestingIntervals StrokeTimeAcceptance CriteriaCheckValveTestingValveProgramTableReliefRequestsForValveTestingAendice'sABCDEPumpProgramTablesPumpProgramRequestsForReliefValveProgramTablesValveProgramRequestsForReliefColdShutdownJustifications Ult REVISION39/1/91REVISIONNUMBERRECORDOPREVISIONS DESCRIPTION OFREVISIONREASONFOTHECHANGEInitialIssueSecond10-yearProgramRevisedProgramperNRCGenericLetter89-04RevisedPrograminresponsetoNRCLetterdtdOctober17,1990DATEEEVISEDAPPROVALS 3/21/858/11/8712/12/89 REVISION39/1/91INSERVICE TESTING(IST)PROGRAMPLANST.LUCIEUNIT

11.0INTRODUCTION

Revision3oftheSt.LucieUnit1ASMEInservice Inspection (IST)Programwillbeineffectthroughtheendofthesecond120-month (10-year) intervalunlessrevisedandreissuedforreasonsotherthantheroutineupdaterequiredatthestartofthethirdintervalper10CFR50.55a(g).

Thesecondinspection intervalisdefinedasfollows:~B~sFebruary11,1988gndsFebruary10,1998ThisdocumentoutlinestheISTProgramforSt.LuciePlant,Unit1,basedontherequirements ofSectionXIoftheASMEBoilerandPressureVesselCode,1983Edition,including alladdendatheretothroughSummer,1983(theCode).References inthisdocumentto"IWP"or"IWV"correspond toSubsections IWPandIWV,respectively, oftheASMESectionXI,1983Edition,unlessotherwise noted.ETheinservice testingidentified inthisPlanaretobeperformed specifically toverifytheoperational readiness ofpumpsandvalveswhichhaveaspecificfunctioninmitigating theconsequences ofanaccidentorinbringingthereactortoasafeshutdown.-

REVISION39/1/912.0APPLICABLE DOCUMENTS ThisProgramPlanwasdeveloped pertherequirements andguidanceprovidedbythefollowing documents:

2.12.22.32.42.52.62.7Title10,CodeofFederalRegulations, Part50NRCRegulatory Guides-Division1StandardReviewPlan3.9.6,"Inservice TestingofPumpsandValvesFinalSafetyAnalysisReport,St.LucieUnit1St.LuciePlantUnit1Technical Specifications ASMEBoilerandPressureVesselCode,SectionXI,1983EditionandAddendathrough'Summer,1983NRCGeneric,Letter89-04,"Guidance onDeveloping Acceptable Inservice TestingPrograms" REVISION39/1/913.0INSERVICE TESTINGPROGRAMFORPUMPSF13.2'3~3CodeCompliance ThisZSTProgramforpumpsmeetstherequirements ofSubsection ZWPoftheCodeandanyinterpretations oradditional requirements imposedbyReference 2.7.Wheretheserequirements havebeendetermined tobeimpractical, conformance wouldcauseunreasonable hardshipwithoutanycompensating increaseinsafety,oranalternative testprovidesanacceptable levelofqualityandsafety,relieffromCoderequirements isrequested pursuanttotherequirements of10CFR50.55a(g)(iii) andReference 2.7.Allowable RangesofTestQuantities Theallowable rangesfortestparameters asspecified inTableIWP-3100-2 willbeusedforallmeasurements ofpressure, flow,andvibration exceptasprovidedforinspecificreliefrequests.

Insomecasestheperformance ofapumpmaybeadequatetofulfillitssafetyfunctioneventhoughtheremaybeavalueofanoperating parameter thatfallsoutsidetheallowable rangesassetforthinTableZWP-3100-2.

Shouldsuchasituation arise,anexpandedallowable maybedetermined, onacase-by-case basis,inaccordance withZWP-3210andASMECodeInterpretation XZ-1-79-19.

TestingIntervals 3.43'Thetestfrequency forpumpsincludedintheProgramwillbeassetforthinIWP-3400andrelatedreliefrequests.

Abandof+25percentofthetestintervalmaybeappliedtoatestscheduleasallowedbytheSt.LucieUnit1Technical Specifications toprovideforoperational flexibility.

PumpProgramTable.AppendixAliststhosepumpsincludedintheISTProgramwithreferences "toparameters tobemeasuredandapplicable requestsforrelief.ReliefRequestsforPumpTestingAppendixBincludesallreliefrequestsrelatedtopumptesting.

0 REVISION39/1/914.0INSERVICE TESTINGPROGRAMFORVALVES4.1CodeCompliance ThisISTProgramforvalvesmeetstherequirements ofSubsection IWVoftheCodeandanyinterpretations oradditional requirements imposedbyReference 2.7.Wheretheserequirements havebeendetermined tobeimpractical, conformance wouldcauseunreasonable hardshipwithoutanycompensating increaseinsafety,oranalternative testprovidesanacceptable levelofqualityandsafety,relieffromCoderequirements isrequested pursuanttotherequirements of10CFR50.55a(g)(iii) andReference 2.7.4.24'TestingIntervals Thetestfrequency forvalvesincludedintheProgramwillbeassetforthinIWP-3400andrelatedreliefrequests.

Abandof+25percentofthetestintervalmaybeappliedtoatestscheduleasallowedbytheSt.LucieUnit1Technical Specifications toprovideforoperational flexibility.

Wherequarterly testingofvalvesisimpractical orotherwise undesirable, testingmaybeperformed duringcoldshutdownperiodsaspermitted byIWV-3412(a).

Justifications forthisdeferredtestingareprovidedinAppendixE.StrokeTimeAcceptance CriteriaWhenrequired, theacceptance criteriaforthestroketimesofpower-operated valveswillbeassetforthinReference 2.7.4'CheckValveTestingFull-stroke exercising ofcheckvalvestotheopenpositionusingsystemflowrequiresthatatestbeperformed whereby'he predicted fullaccidentcondition flowratethroughthevalvebeverifiedandmeasured.

Anydeviation tothisrequirement mustsatisfytherequirements ofReference 2.7,Position1.4.5ValveProgramTableAppendix'C liststhosevalvesincludedintheISTProgramwithreferences torequiredtesting,respective testintervals, andapplicable requestsforrelief.

REVISION39/1/914.6ReliefRequestsforValveTestingAppendixDincludesallreliefrequestsrelatedtovalvetesting.~~

AppendixAPumpProgramTables

FLORIDAPOMERAHDLIGHTCOHPAHYPUMPTABLESSaintLuciaNuclearPlant-Unit1REVISION:

DATE:10/09/91PAGE:1PUHPHUHBERDESCRIPTIOH INLETDIFF.FLOMBEARIHGCLCOORDSPEEDPRES.PRES.RATEVIBRA.TENTREHARKS,AFM1AAFM18AFM1CBAH1ABAH18CCM1ACCM18CCM1CCHG1ACHG18CHG1CCS1ACS18DOT1ADOT18HPSI1AHPSI18ICM1AICM18ICM1CLPSI1ALPSI18AUXILIARY FEEDMATER PUHP3H-5NAYYY:PR-4YN:PR.1AUXILIARY FEEDMATER PUHP3K-5NAYYYPR4YNPR1AUXILIARY FEEDMATER PUHPBORICACIDHAKEUPPUHPBORICACIDNAKEUPPUHP3H-528-528.5YYYY:PR4YN:PR-1HAN:PR8YY:PR5YH:PR.1NAN:PR-8YY:PR-5,YN:PR-1YH:PR~1H:PRICOHPONENT COOL!HGMATERPUHP3F-16NAYYYYN:PR-1Y:PR12N:PR-120.220~2NAYYYNAYYYHAYYYCHARGINGPUHPCHARGINGPUHPCHARGINGPUHPCONTAINHENT SPRAYPUHPCOHTAIHHENT SPRAYPUHPDIESELOILTRANSFERPUHPDIESELOILTRANSFERPUHPY:PR-12N:PR.IY:PR.12H:PR-12E.2YYY:PR-6YH:PR.I20.42E-2NAYYY:PR6YH:PR-13J-12NAN:PR-8Y"Y:PR-7YN:PR-1YN:PR-1YN:PR.1NAN:PR-8YY:PR-7,3L.12HIGHPRESSURESAFETYINJECTION 2C.6HIGHPRESSURESAFETYINJECTION 28-6NAYYY:PR.9YN:PR.1NAYYY:PR-9INTAKECOOLINGMATERPWP3H-4NAN:PR-11YYY:PR-13H:PR-1INTAKECOOL!NGMATERPIHIPINTAKECOOLINGMATERPUHP3H.73H-5NAN:PR-11YYY:PR.13N:PR-1HAH:PR.11YYY:PR-13N:PR-1LOMPRESSURESAFE7YINJECTION 2F-6NALOMPRESSURESAFETYINJECTION 2E-6HAYYYPR10YN:PR-1YYY:PR10YN:PR-1COHPOHEHT COOLINGMATERPUHP3F.16HAYYYCOHPOHEHT COOLINGMATERPUHP3F17HAYYY FLORIDAPOMERANDLIGHTCOHPAHYPOMPTABLESSaintLucieNuclearPlant-Unit1REVISIOH:

3DATE:09/01/91PAGE:I5C0001NX51$$0155'mlC0s5SS$$$$CQRSSSIiaSRICPUHPHUHBERDESCRIPTION INLETDIFF.FLOMBEARINGCLCOORDSPEEDPRES.PRES.RATEVIBRA.TEHP.REMARKSAFM1AAFM18AFM1CBAH1ABAH18CC'lI1ACCM18CCMICCHG1ACHG18CHG1CCS1ACS18AUXILIARY FEEDLIATER PUILPAUXILIARY FEEDLIATER PLNPAUXILIARY FEEDMATER PUHPBORICACIDHAKEUPPUHPBORICACIDHAKEUPPUILP3H.53K.S3HE528'28'NAYYY:PR-4YN:PR-1NAYYY:PR-4YH:PR-IYYY:PR-4YN:PR-1HAN:PR-8YY:PR-5YH:PR1NAH:PR-8'YY:PR5H:PR-1COLPOHEHT COOLINGLIATERPUHP3F.17NAYCOLPONEHT COOLINGMATERPQIP3F16NAYYYYYYN:PR1YN:PR-1YN:PR.1CHARGINGPQLPCHARGIHGPUHPCHARGINGPLNPCONTAIHHENT SPRAYPUHPCOHTAINHEHT SPRAYPLNP2G-22G22E-22G.42E-2NAYYYY:PR-12H:PR~1NAYY'YY:PR.12H:PR-1NAYYYY:PR12N:PR-1HAYYY:PR-6YH:PR1NAYYY:PR-6N:PR1COMPONENT COOLING'LIATERPUHP3F.16NAYYYDOT1ADOT18HPSI1AHPSI18ICM1AIO'M18ICM1CLPSI1ALPSI18DIESELOILTRANSFERPUHPDIESELOILTRANSFERPUHP3J.12HAH:PR8YY:PR-73L-12NAN:PR.8Y'Y:PR-7H:PR-IN:PR1HIGHPRESSURESAFETYIHJECTIOH 2C.6NAYY:PR-9N:PR.1N:PR1INTAKECOOLINGMATERPUHPIHTAKECOOLINGLIATERPQLPINTAKECOOLINGMATERPLNP3H-43H.73H5NAN:PR.11YYY:PR-13N:PR-1NAN:PR.11YYY:PR~13N:PR.1NAN:PR-11Y'YY:PR.13N:PR1LOLIPRESSURESILFgTYINJECTIOI 2F.6NAYYYPR10YN:PR.1LOMPRESSURESAFETYINJECTIOI 2E6NAYYYPR10YN:PR1HIGHPRESSURESAFETYINJECTION 28.6NAYYY:PR-9Y FloridaPower&LightCompanyZNSERVZCE TESTING-PUMPTABLESSt.LucieNuclearPlant-Unit1REVISION:

3DATE9/1/91PAGE:2LEGENDPUMPNUMBERDESCRIPTION CLCOORDTestParameters Numerical designator indicated ontherespective flowdiagram.Genericname/function ofthepump.ZSIClassification pertheassociated ISIboundarydrawing(s)

Corresponds totheflowdiagramcoordinates ofthepump.Thetableindicates bya"Y"(yes)or"N"(no)thatthespecificparameter ismeasured, evaluated, andrecordedpertheapplicable Coderequirement.

Ifa"N"isindicated, theassociated reliefrequestnumberisalsonotedinthesamecolumn.PR-XXWhereindicated thisreferstothespecificreliefrecgxest(SeeAppendixB)relatedtoanydeviation regarding themeasurement oranalysisofaparameter.

AppendixBPumpProgramReliefRequests REVISION39/1/91RELIEFREQUESTNO.PR-1COPONENTS:AllpumpsintheProgramSCTIONXIREUIREMENT:

Thetemperature ofallcentrifugal pumpbearingsoutsidethe.mainflowpathandofthemainshaftbearingsofreciprocating pumpsshallbemeasuredatpointsselectedtoberesponsive tochangesinthetemperature ofthebearings.

(IWP-3300, 4310)BASSFORRIEF:Thedataassociated withbearingtemperatures takenatone-yearintervals provideslittlestatistical basisfordetermining theincremental degradation ofabearingoranymeaningful trendinginformation orcorrelation.

Inmanycasesthepumpbearingsarewater-cooled andthus,bearingtemperature isafunctionofthetemperature ofthecoolingmedium,whichcanvaryconsiderably.

Vibration measurements areasignificantly morereliableindication ofpumpbearingdegradation thanaretemperature measurements.

Allpumpsintheprogramaresubjected tovibration measurements inaccordance withIWP-4500.

Althoughexcessive bearingtemperature isanindication ofanimminentorexistingbearingfailure,itishighlyunlikelythatsuchacondition wouldgounnoticed duringroutinesurveillance testingsinceitwouldmanifestitselfinotherobviousindications suchasaudiblenoise,unusualvibration, increased motorcurrent,etc.Anypotential gainfromtakingbearingmeasurements, whichinmostcaseswouldbedonelocallyusingportableinstrumentation, cannotoffsetthecostintermsofdilutionofoperator'effort,distraction ofoperators fromotherprimaryduties,excessive operating periodsforstandbypumpsespecially underminimumflowconditions, andunnecessary personnel radiation exposure.

Basedonthe'easons similartothosesetforthabove,theASMEdeletedtherequirement forbearingtemperature measurements inASMEOMCode,Subsection ISTB,therevisedversionoftheCodeforpumptesting.B-1 I

RELIEFREQUESTNO.PR-1(cont.)ALTERNATE TESTING:NoneREVISION39/1/91B-2 RELIEFREQUESTNO.PR-2REVISION39/1/91COMPONENTS:

VariousSECTIONXIREUIREMENT:

Thefull-scale rangeofeachinstrument shallbethreetimesthereference valueorless.(IWP-4120)

BASISFORRELIEF:TableIWP-4110-1 requirestheaccuracyofinstruments usedtomeasuretemperature andspeedtobeequaltoorbetterthan+5percentfortemperature and+2percentforspeed,bothbasedonthefullscalereadingoftheinstrument.

Thismeansthattheaccuracyofthemeasurement canvaryasmuchas+15percentand+6percent,respectively, assumingtherangeoftheinstruments extendedtotheallowedmaximum.TheseISTpumpparameters areoftenmeasuredwithportabletestinstruments wherecommercially available instruments donotnecessarily.

conformtotheCoderequirements forrange.Inthesecases,highqualitycalibrated instruments willbeusedwherethe"reading" accuracyisatleastequaltotheCode-requirement forfull-scale accuracy.

Thiswillensurethatthemeasurements arealwaysmoreaccuratethantheaccuracyasdetermined bycombining therequirements ofTableIWP-4110-1 andParagraph IWP-4120.

SG:Wheneverportableinstruments, areusedformeasuring pumpspeedorbearingtemperatures, theinstruments willbesuchthatthe"reading" accuracyisasfollowsCTemperature

'5percentSpeed+2percentB-3

RELIEFREQUESTNO.PR-3REVISION39/1/91COMPONENTS:

Applicable toallpumpsintheProgramSECTIONEUIREMENT:

Each,inservice testshallincludethemeasurement andobservation ofallquantities inTableIWP-3100-1.

(IWP-3300)

Pumpinletpressureshallbemeasuredbeforestartingapumpandduringthetest.(TableIWP-3100-1)

BASISFORRELIEF:Ifthepumpsbeingtestedareinoperation asaresultofplantorsystemneeds,itisunreasonable toreconfigure systemlineupssimplytoprovideformeasurement ofstaticinletpressure.

Inletpressurepriortopumpstartupisnotasignificant parameter neededforevaluating pumpperformance oritsmaterialcondition.

TESTING'hen performing atestonapumpthatisalreadyinoperation duetosystemorplantrequirements, inletpressurewillonlybemeasuredduringpumpoperation.

B-4 1

RELIEFREQUESTNO.PR-4REVISION39/1/91COMPONENTS:

Auxiliary Feedwater,(AFW)

Pumps1Athru1C(8770-G-080, Sh3)SECTIONXIEUIREMENT:

Eachinservice testshallincludethemeasurement andobservation ofallquantities inTableIWP-3100-1.

(IWP-3300)

Pumpflowrateshallbemeasuredduringthetest.(TableIWP-3100-1)SSORIF:Thereareonlytwopractical flowpaths available forperforming inservice testingof,.theAFWPumps.Theseincludetheprimaryflowpathintothemainfeedsupplylinesandthencetothesteamgenerator andtheminimum-flow recirculation (mini-recirc andbypasstestloop)whichreturnstothecondensate tank.Theformerisprovidedwithflowratemeasuring instrumentation howeverthemini-recirc lineisafixedresistance circuitwithnoflowinstrumentation.

Pumpingfromtheauxiliary feedwater systemintothesteamgenerators duringplanthotoperation isimpractical andundesirable forthefollowing reasons:Duringauxiliary feedwater injection viathemainfeedwater lineswhiletheplantisoperating atpower,alargetemperature differential (approximately 375deg-F)couldexist.'hat wouldresult,insignificant thermalshockandfatiguecyclingofthefeedwater pipingandsteamgenerator nozzles.Based,ontheexpecteddurationofthetestingandtheflowratef ofthepumps-(275 gpm),itisexpectedthatthecooldownofthesteamgenerator wouldinducecooldownandcontraction ofthereactorcoolantsystemresulting inundesirable reactivity variations andpowerfluctuations.

B-5 RELIEFREQUESTNO.PR-4(cont.)REVISION39/1/91ALTERNAESTING:Duringquarterly testingoftheAFWpumpswhilethepumpsareoperating throughthefixed-resistance mini-recirc line,pumpdifferential pressureandvibration willbemeasuredandevaluated perIWP-3200andIWP-6000.

Duringtestingperformed atcoldshutdown, pumpdifferential

pressure, flowrate, "andvibration willberecordedperIWP-3200andIWP-6000.

Testingduringcoldshutdowns willbeonafrequency determined byintervals betweenshutdowns asfollows:,

Forintervals of3monthsorlonger-eachshutdown.

Forintervals oflessthan3months-testingisnotrequiredunless3monthshavepassedsincethelastshutdowntest.Thisalternate testingagreeswiththerequirements ofNRCGenericLetter89-04,Position9and,assuch,isconsidered tobeapproveduponsubmittal.

B-6 RELIEFREQUESTNO.PR-5REVISION39/1/91COMPONENTS:

BoricAcidMakeup(BAM)Pumps1Aand1B(8770-G-078, Sh121)SECTIONXIREUIREMENT:

Eachinservice testshallincludethemeasurement andobservation ofallquantities in'TableIWP-3100-1.

(IWP-3300)

Pumpflowrateshallbemeasuredduringthetest.(TableIWP-3100-1)BSISIFTherearethreepractical flowpaths available forperforming inservice testingoftheBAMPumps.Theseincludetheprimaryflowpathintothechargingpumpsuctionheader,arecirculation lineleadingbacktotherefueling watertank,andtheminimum-flow recirculation (mini-recirc andbypasstestloop)whichreturnstotheBAMTanks.Noneoftheseistotallysatisfactory forthefollowing reasons:*Operating theBAMPumpsdischarging intothechargingpumpsuctionheaderrequirestheintroduction ofhighlyconcentrated boricacidsolutionfromtheboricacidmakeuptankstothesuctionofthechargingpumps.This,inturn,wouldresultintheadditionofexcessborontotheRCSwhich,wouldadversely affectplantpowerlevelandoperational parameters withthepotential foranundesirable planttransient andaplanttriporshutdown.

Duringcoldshutdown, theintroduction ofexcessquantities ofboricacidintotheRCSisundesirable fromtheaspectofmaintaining properplantchemistry andtheinherent'ifficulties thatmaybeencountered duringthesubsequent startupduetoover-boration oftheRCS.B-7

REVISION39/1/91RELIEFREQUESTNO.PR-5,(cont.)

  • Thesecondcircuitthatrecirculates watertotheRefueling WaterTank(RWT)orthe'olumeControlTank(VCT).Duringplantoperation atpoweritisundesirable topumptotheRWTanddepletetoBAMTankinventory.

Thereare,however,situations wheremakeupisprovidedtotheVCTfromtheBAMTanks;butit"isunlikelythatthescheduling anddurationof,.thisevolution presentsapractical opportunity forperforming pumptesting.*Theminimum-flow recirculation flowpathisafixedresistance circuitcontaining aflowlimitingorificehowevernoflowratemeasuring instrumentation isinstalled.

ALTERNTESTING:Duringquarterly testingoftheBAMpumpswhilethepumpsareoperating throughthefixed-resistance mini-recirc line,pumpdifferential pressureandvibration willbemeasuredandevaluated perIWP-3200andIWP-6000.

Duringtestingperformed ateachreactor'efueling outage,pumpdifferential

pressure, flowrate, andvibration willberecordedperIWP-3200andIWP-6000.

Thisalternate testingagreeswiththerequirements ofNRCGenericLetter89-04,Position9and,assuch,isconsidered tobeapproveduponsubmittal.

B-8

REVISION39/1/91RELIEFREQUESTNO.PR-6COMPONENTS:

Containment Spray(CS)PumpslAand1B(8770-G-088)

SECTIONXIREUIREMENT:

Eachinservice testshallincludethemeasurement andobservation ofallquantities inTableIWP-3100-1.

(IWP-3300)

Pumpflowrateshallbemeasuredduringthetest.(TableIWP-3100-1)BSISFORRELIEF:Therearetwopractical flowpaths available forperforming inservice testingoftheCSPumps.TheseincludeonethatpumpsboratedwaterfromtheRWTtotheRCSviathelow-pressurein)ection headerandtheother,minimum-flow recirculation (mini-recirc andbypasstestloop)whichreturnstotheRWTThefirstwouldrequiremodifying theshutdowncoolinglineupwhileincoldshutdown; however,theshutdowncoolingsystemcannotprovidesufficient letdownflowtotheRWTtoaccommodate fulldesignflowfromtheRWTwhilemaintaining thenecessary corecoolingfunction.

Thus,theonlypractical timefortestingthesepumpsviathisflowpathisduringrefueling outageswhenwaterfromtheRWTisusedtofilltherefueling cavity.Theminimum-flow recirculation flowpathisafixedresistance circuitcontaining aflowlimitingorificehowevernoflowratemeasuring instrumentation isinstalled.

Duringquarterly testingoftheCSpumpswhilethepumpsareoperating throughthefixed-resistance mini-recirc line,pumpdifferential pressureandvibration willbemeasuredandevaluated perIWP-3200andIWP-6000.

B-9 RELIEFREQUESTNO.PR-6(cont.)ALTERNATE TESTING:REVISION39/1/91Duringtestingperformed duringeachreactorrefueling, pumpdifferential

pressure, flowrate, andvibration willberecordedperIWP-3200andIWP-6000.

Thisalternate testingagreeswiththerequirements ofNRCGenericLetter89-04,Position9and,.assuch,isconsidered tobeapproveduponsubmittal.

B-10 REVISION39/1/91'ELIEF REQUESTNO.PR-7.COMPONENTS:

DieselFuelOilTransferPumps1Aand1BSECTIONXIREUIREMENTS:

Flowrateshallbemeasuredusingarateorquantitymeterinstalled inthepumptestcircuit.(IWP-4600)

BASISFORRELIEF:Therearethreeflowpathsavailable forperforming inservice testingonthesepumps:theminimumflowrecirculation line,thenormaldaytankfillline,andthetransferlinesusedtotransferfueloilbetweendieseloilstoragetanks.Noneoftheseflowpathshaveinstalled flowinstrumentation.

Theminimumflowrecirculation lineisaoneinchlinewithanorificewhichleadsfromthepumpdischarge backtoitsdieseloilstoragetank.Therearenoflowinstruments inthe,flowpathnorcanachangeintanklevelbeusedsincethefueloilisreturnedtothesametank.Finally,theamountoffueloilthatcanbepumpedthroughthelineislimitedbyitssizeandtheorifice.Duringanormaldieselgenerator run,thetransferpumpisnotrequiredtorun.Thedaytankisgravityfedwiththesolenoidfillvalvecontrolling level.Thetankwouldrequiredrainingtouseitastheflowpathforapumpflow'test.

Todrainthedaytankwouldrequireadditional dieselgenerator runtimesordrainingover200gallonsofdieselinto55gallondrums.Neitherdrainingmethodisacceptable.

Evenifthetankcouldbedrained,thelengthofthepumptestwouldbelimitedbythesmallvolumeofthedaytank.Themostpractical methodofdetermining pumpflowrateisbycalculating

.thetransferrateoffueloilbetweenstoragetanks.Storagetanklevelsaremeasuredatthebeginning andendofthetestandareequatedtotankvolumes.Theflowrateisthencalculated bydividingthedifference intankvolumesbythetimeintervalofthetest.'l

REVISION39/1/91ALTERNATIVE TESTING:Duringquarterly testingoftheDieselGenerator FuelOilTransferPumps,pumpdifferential

pressure, flowrate, andvibration willberecordedperIWP-3200andIWP-6000.

Flowratewillbebasedonthestoragetanklevelchangesoverameasuredperiodofpumpoperation.

Thereference valuesforthesepumpswillbebasedonanaverageofaseriesofpumptests.Thecalculated reference valvewillbeusedlikeasinglereference valuetocalculate theallowable rangesperIWP-3110.

B-12

REVISION39/1/91RELIEFREQUESTNO.PR-8COMPONENTS:

BoricAcidMakeupPumps1Aand1B(8770-G-078, Sh121DieselFuelOilTransferPumpslAand1B(8770-G-086, Sh1)SECTIONXIREUIREMENTS:

Eachinservice testshallincludethemeasurement andobservation ofallquantities inTableIWP-3100-1 exceptbearingtemperatures, whichshallbemeasuredduringatleastoneinservice testeachyear.(IWP-3300)

SIS0RIEF:Thesysteminstallations donotprovideanymechanism formeasuring pumpsuctionpressures, andthus,therequirement formeasuring suctionpressureandpumpdifferential pressures cannotbesatisfied.

Ameasureofpumpsuctionpressurecan,however,bedetermined bycalculation usingtheheightofliquidintheboricacidanddieseloilstoragetanks.Sincethereisessentially fixedresistances betweenthetanksandthepumpsthiswillprovideaconsistent valueforsuctionpressures.

Sincethetanklevelsarenotexpectedtovarysignificantly duringthetests,tanklevelsandassociated calculations willonlybetakenonceduringeachtestinsteadofpriortopumpoperation andduringoperation asrequiredbyTableIWP-3100-1

~LTESTING:3TheBoricAcidMakeupandDieselFuelOilTransferPumpsuctionpressures willbecalculated basedontheheightofliquidintheassociated tanksonceduringeachinservice test.Subsequently, thesecalculated valueswillbeusedtodetermine p~pdifferential pressures forevaluation ofpumpparameters.

B-13 RELIEFREQUESTNO.PR-9REVISION39/1/91COMPONENTS:

HighPressureSafetyInjection (HPSI)PumpslAand1B(8770-G-078, Sh130)SECTIONXIREUIREMENT:

Eachinservice testshallincludethemeasurement andobservation ofallquantities inTableIWP-3100-1.

(IWP-3300)

BASISFORRELIEF:Duringquarterly testingoftheHPSIPumps,thepumpscannotdevelopsufficient discharge pressuretoovercomeRCSpressureanallowdirecting flowthroughthesafetyinjection lineflowmeasuring instrument, thusflowisroutedthroughaminimumflowtestlineleading'o thesuctionofthepumpbeingtested.Thislinehasnoinstalled flowratemeasuring instrumentation andmeasuring flowrateduringquarterly testingisnotpractical.

Duringcoldshutdownconditions, fullflowoperation oftheHPSIpumpstotheRCSisrestricted toprecludeRCSsystempressuretransients thatcouldresultinexceeding thepressure-temperature limitsspecified intheTechnical Specifications, Section3.4.9.NRCGenericLetter89-.04,Position9,allowselimination ofminimumflowtestlineflowratemeasurements providing inservice testsareperformed duringcoldshutdowns orrefueling underfullorsubstantial flowconditions wherepumpflowrateisrecordedandevaluated.

ALTERNAETESTING:Duringquarterly testingoftheHPSIPumps,pumpdifferential pressureand'vibration willberecordedperIWP-3200andIWP-6000.Duringtestingperformed ateachreactorrefueling, pumpdifferential

pressure, flowrate, andvibration willberecordedperIWP-3200andIWP-6000.

Thisalternate testingagreeswiththeguidelines ofNRCGenericLetter89-04,Position9and,assuch,isconsidered tobeapproveduponsubmittal.

REVISION39/1/91RELIEFREQUESTNO.PR-10COMPONETS:LowPressureSafetyInjection (LPSI)Pumps1Aand1B(8770-G-078, Sh130)SECTIONXRUREMENT:Eachinservice test'hall includethemeasurement andobservation ofallquantities inTableIWP-3100-1.

(IWP-3300)

BIS0RELIF:Duringquarterly testingoftheLPSIPumps,thepumpscannotdevelopsufficient discharge pressuretoovercomeRCSpressureanallowdirecting flowthroughthesafetyinjection lineflowmeasuring instrument, thusflowisroutedthroughaminimumflowtestlineleadingtothesuctionofthepumpbeingtested.This-linehasno'nstalled flowratemeasuring instrumentation andmeasuring flowrateduringquarterly testingisnotpractical.

NRCGenericLetter89-04,Position9,allowselimination ofminimumflowtestlineflowratemeasurements providing inservice testsareperformed duringcoldshutdowns orrefueling underfullorsubstantial flowconditions wherepumpflowrateisrecordedandevaluated.

ARNG:Duringquarterly testingoftheLPSIPumps,pumpdifferential pressureandvibration willberecordedperIWP-3200andIWP-6000.

~~B-15 REVISION39/1/91RELIEFREQUESTNO.PR-10(cont.)ALTERNATE TSTNG:Duringtestingperformed atcoldshutdown, pumpdifferential

pressure, flowrate, andvibration willberecordedperIWP-3200andIWP-6000.

Testingduringcoldshutdowns willbeonafrequency determined byintervals betweenshutdowns asfollows:Forintervals of3monthsorlonger-each.,shutdown.

Forintervals oflessthan3months-testingisnotrequiredunless3monthshavepassedsincethelastshutdowntest.Thisalternate testingagreeswiththerequirements ofNRCGenericLetter89-04,Position9and,assuch,isconsidered tobeapproveduponsubmittal.

B-16 REVISION39/1/91RELIEFREQUESTNO.PR-11COMPONENTS:

IntakeCoolingWaterPumps1A,1Band1CSECTIONREUIREMENT:

Eachinservice testshallincludethemeasurement andobservation ofallquantities inTableIWP-3100-1.

(IWP-3300)

Pumpinletpressureshallbemeasuredbeforestartingapumpandduringthetest.(TableIWP-3100-1)

BSSFOELIThepumpslistedaboveareverticallineshaftpumpssubmerged intheintakestructure withnopractical meansofmeasuring pumpinletpressure.

Theinletpressure, however,canbedetermined bycalculation using,asinput,themeasuredheightofwaterabovethepumpinletasmeasuredattheintake.Duringeachinservice test,thewaterlevelintheintakepitremainsrelatively

constant, thusonlyonemeasurement oflevelandtheassociated suctionpressurecalculation needbeperformed.

ATATTESTNG:Duringtestingofthesepumps,onevalueofinletpressurewillbecalculated basedonwaterlevelattheinletstructure.

B-17 RELIEFREQUESTNO.PR-12REVISION39/1/91COMPONENTS:

ReactorCoolantChargingPumps1A,1B,and1CSECTIONXIREUIREMENT:

Thefrequency responserangeofthereadoutsystem(forinstrument usedtomeasurevibration amplitude) shallbefromone-halfminimumspeedtoatleastmaximumpumpshaftrotational speed.(IWP-4520(b))

BASISFORRELIEF:Thereactorcoolantchargingpumpsoperateatapproximately 210-215rpmwhichequatestoarotational frequency of1.75Hz.Following anextensive investigation ofavailable andpotentially suitableinstrumentation, ithasbeendetermined thatinstruments satisfying" thisrequirement forthechargingpumpsarecommercially unavailavle.

ALTERNATE TESTING:1Duringtestingofthesepumps,vibration willbemeasuredasrequiredbyIWP-4510, exceptthatthelowerfrequency responsefortheinstruments willbe10Hz.~~B-18 IPI RELIEFREQUESTNO.PR-13REVISION39/1/91COMPONENTS:

IntakeCoolingWaterPumps1A,1B,and1CSECTIONXIREUIREMENT:

Thefrequency responserangeofthereadoutsystem(forinstrument usedtomeasurevibration amplitude) shallbefromone-halfminimumspeedtoatleastmaximumpumpshaftrotational speed.(IWP-4520(b))

BASISFORRELIEF:TheSt.LuciePlanthasrecentlycompleted amajorupgradetoitsASMEpumpvibration programtobettercomplywiththeCode.Aspartoftheupgrade,newvibration instruments werepurchased.

Theinstruments werechosenfortheireaseofuseandreliability; however,theinstrument's lowerfrequency responsedoesnotcomplywiththeCodewhenusedontheIntakeCoolingWaterpumps.Theintakecoolingwaterpumpsoperateatashaftspeedofapproximately 885rpm.BasedonthisspeedandtheCoderequirement, theinstrumentation usedtomeasurevibration (displacement) wouldrequirearesponserangedownto7.38hz.Thenewinstruments arecapableofalowerfrequency responseto10hz,2.62HzhigherthantheCode.Theimpactofprocuring instruments alongwiththeaccompanying re-training thatwouldberequiredisclearlyunwarranted atthistimesimplytogainaslightlybetterfrequency response.

ALTERNATE TESTIG:Duringtestingofthesepumps,vibration willbemeasuredasrequiredbyIWP-4510, exceptthatthelowerfrequency responsefortheinstruments willbe10Hz.B-19 AppendixCValveProgramTables

FloridaPower&LightCompanyINSERVICE TESTING-VALVETABLESSt.LucieNuclearPlant-Unit1REVISION:3DATE9/1/91PAGE:1LEGENDVALVENUMBERCOORDCLCATSIZETYPEA/PACT.TYPENORMPOS.REMINDFAILMODErTheplantalpha-numerical designator forthesubjectvalveThecoordinate locationofthevalveonthedesignated drawingTheISIClassification ofthevalveaspertherespective ISIboundarydrawingsThevalvecategoryperParagraph IWV-2200Thevalve'snominalsizeininchesThevalvetypeTheactive(A)orpassive(P)determination forthevalveperIWV-2100.

Thevalveactuatortypeasfollows:AOAir-operated MOElectricmotor-operated MANManualvalvePOPiston-operated S/ASelf-actuated SOSolenoid-operated Designates thenormalpositionofthevalveduringplantoperation atpowerNotesifavalvehasremotepositionindication Identifies thefailuremode(openorclosed)foravalve.FAIindicates thevalvefails"asis".

ForidaPower&LightCompanyZNSERVZCE TESTING-,VALVETABLESSt~LucieNuclearPlant-Unit1REVISION:3DATE9/1/91PAGE:2LEGENDCont.Identifies thetestrequirements foravalveasfollows:CV/CCV/0CV/POECEEEOFSINSPPECPZSLT-1SLT-2SRVCheckvalveexercisetoclosedposition.

Checkvalvefull-stroke exercisetoopenposition.

Checkvalvepartial-stroke exercisetoopenposition.

Exercisetoclosedposition.

ForallcategoryAorBpower-operated valvesstroketimeswillbemeasuredunlessexcludedbyanassociated reliefrequest.Exercisevalvetoverifyproperoperation andstrokingwithnostroketimemeasurements.

Requiresobservation ofsystemparameters orlocalobservation ofvalveoperation.

Exercisetoopenposition.

.ForallcategoryAorBpower-operated valvesstroketimeswillbemeasuredunlessexcludedbyanassociated reliefrequest.FailsafetestDisassembly andinspection ofcheckvalvesPartialclosureexerciseforpower-operatedvalvesPositionindication verification Seatleakratetestper10CFR50,AppJSeatleakratetestforpressureisolation valves.Setpointcheckforsafety/relief valves FloridaPower&LightCompanyINSERVICE TESTING-VALVETABLESSt.LucieNuclearPlant-Unit1REVISION:3DATE9/1/91PAGE!3TESTFREQLEGENDCont.Therequiredtestintervalasfollows:QRCS2YRFSPQuarterly (duringplantoperation)

ColdshutdownasdefinedbyTechnical Specification Every2yearsEachreactorrefueling outage(cycle).Inthecasewherethisisdesignated forsafety/relief valvesrefer,toTableZWV-3510-1

~Other(Seeapplicable RequestforRelief)RELIEFREQReferstothespecificreliefrequestassociated withtheadjacenttestrequirement.

(SeeAppendixD) 01 FLORIDAPOUERANOLIGHTCOHPANYVALVETABLESSaintLucieNuclearPlant-Unit1REVISION:

3DATE:09/01/91PAGE$$$'$$$$$$$$$$$$$$$$$$$$$$$$$$$'$$$$$$$$$$$$$P8IO:35090.115SN'ISYSTEH:STEAHGENERATOR BLOOOMN$~$$'$$$$'$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ACT.NORHREHFAILTESTRELIEFVALVENUHBERCOORD.CLCAT.SIZETYPEA/PTYPEPOS.INDHOOEEXAHFREQREQ.REHARKSFCV-23.3E.22B2.000GATEAAO0YESFCECFSPIQRQR2YFCV-23.5E-3282.000GATEAAO0YESFCECFSPIQRQR2YFCV.23.7E-5280.500GATEAAOC'YESFCECQRFSQRPl2YFCV-23-9E-62B0.500GATEAAOCYESFCECQRFSQRPl2Y'~

FLORIDAPOMERANDLIGHTCCHPAHYVALVETABLESSaintLuciaNuclearPlant~Unit1REVISION:

3DATE:09/01/91PAGE:5P8ID:8770.G.078 SH110SYSTEH:REACI'ORCOOLANTSYSTEH!!!!!!S!!$!!!!!!!!!!!!!!!!!!!!!!!!!

'ACT.NORHREHFAILTESTRELIEFVALVENUMBERCOORD.CLCAT.SIZETYPEA/PTYPEPOS.INDNODEEXAHFREDRED.REHARKSV.1200G61C6.000SAFETYAS/ACNOSRVRFV-1201G-61C6.000SAFETYAS/ACNOSRVRFV-1202G61C,6.000SAFETYAS/ACHOSRVRFV.1402G.B182.500GLOBEASOCYESFCEOPlCS2YV.1403G8182.500GATEAHO0YESFAIECQRPl2YV.1404H8182.500GLOBEASOCYESFCEOCSPl2YV.1405H8182.500GATEAHO0YESFAIECQRPl2YV-1441DE4281.000GLOBEASOLCYESFCEOCSPI2YV-144204281.000GLOBEASOLCYESFCEOCSPI2YV-1443H-6281.000GLOBEASOLCYESFCEOCSPl2YV-1444H.6281.000GLOBEASOLCYESFCEOCSPl2YV-1445F.B281.000GLOBEASOLCYESFCEOCSPl2YV-1446F.B281.000GLOBEASOLCYESFCEOCSPl2YV-1449F.8281.000GLOBEASOLCYESFCEOCSPl2Y

't FLORIDAPOMERANDLIGHTCOHPANYVALVETABLESSaintLucieNuclearPlant-Unit1'&ID:87700.078SH120SYSTEH:CHEHICALANDVOLUHECONTROLREVISIOH:

3DATE:09/01/91PAGE:61m'iaaa1'sees5$55515$$5$5$$$0001$055I05CCSCCS5XSC55mACT.HORNREHFAILTESTRELIEFVALVENUHBERCOORD.CLCAT.SIZETYPEA/P'TYPEPOS.INDNODEEXAHFREQREQ.REHARKSHV.02-02CD7282.000GLOBEAHO0YESFAIEOCSPl2YSE-02-0188182.000GLOBEASO0YESFOECEOFSPIQRQRQR2YSE-02-028.8182.000GLOBEASO0YESFOECQREOQRFSQRPl2YSE-02-03C.B182.000GLOBEASOLCYESFCECCSEOCSFSCS'l2YSE-02-04C.B182.000GLOBEASOLCYESFCECEOFSPlCSCSCS2YV-24308-51C2.000CHECKAS/A0NOCV/0QRV-2431C.B1C2.000CHECKAS/ACNOCV/0CSV-24328-81C2.000CHECKAS/A0/CNOCV/0QRV-2433A-81C2.000CHECKAS/A0/CNOCV/0QR,V-25150.81A2.000GLOBE,A000YESFCEC)FSPlSLT1CSCS2Y2YV-25160-71A2.000GLOBEA000YESFCECCSFSCSPl2YSLT;12Y FLORIDAPNIERAHDLIGHTCOMPANYVALVETABLESSaintLuciaNuclearPlant-Unit1P&ID:8770.G078SH121SYSTEH:CHEHICALANDVOLUHECOH'TROLSYSTEHREVISIOH:

3DATE:09/01/91PAGE:755555555'5 55555555555ACT.HORNREHFAILTESTRELIEFVALVENUHBERCOORD.CLCAT.SIZETYPEA/PTYPEPOS.INDNODEEXANFREQREQ.RENARKSFCV-2161B.42B1.000GLOBEA000/CYESFCECFSPlQRQR2YSE-0101H-62A0.750GLOBEASO0YESFCECFSPlSLT.1CSCS2Y2YV.02132G.22C2.000CHECKAS/A0/CHOCV/CQRCV/0QRV-021330-22CF000CHECKAS/A0/CNOCV/CQRCV/0QRV-02134E-22C2.000CHECKAS/A0/CNOCV/CQRCV/0QRV-2177C-42C3.000CHECKAS/AC'OCV/0RFVR-6V-21900-62C3.000CHECKAtS/ACNOCV/CRFVR6CV/0RFVR6V-2191E-62C3.000CHECKAS/ACNOCV/CRFVR.6CV/0RFVR-6V.2324F-22C1.500RELIEFAS/A"CNOSRVRFV-2325G-22C1.500RELIEFAS/ACHOSRVRFV-2326H-22C1.500RELIEFAS/ACNOSRVRFV.24438-42C3.000CHECKAS/A0/CNOCV/CQRCV/0RFVR.28CV/POQRVR.28V-24448.42C3.000CHECKAS/A0/CNOCV/CCV/0CV/POQRRFVR-28,QRVR-28V-2501E-7284.000GATEANO0YESFAIECCSPl2Y I

FLORIDAPOUERANDLIGHTCOMPANYVALVETABLESSaintLuciaNuclearplant-Unit1REVISION:

3DATE:09/01/91PAGE:8P&ID:8770-G-078 SN121(cont)SYSTEH:CHEHICALANOVOLUHECONTROLSYSTEMRXCCR51CS 4CS1XS0SR5R5II51$CRXISSSSSZ 5~CRRSC0555 0S1ACT.NORHREHFAILTESTRELIEFVALVENUMBERCOORD.CLCAT.SIZETYPEA/PTYPEPOS.INDMODEEXAMFREQREQ.REMARKSV.2504E.S383.000GATEAHOCYESFAIECEOPlCSCS2YV-2505N-62A0'50GLOBEADO0YESFCECFSPlSLT~1CSCS2Y2YV.250886283.000GATEAHOC'ESFAIEOQRPl2YV.25098.7283.000GATEAHOCYESFAIEOQRPl2YV.25108-6281.000GLOBEA000YESFCECQRFSQRPI2YV-251105281.000GLOBEA000YESFCECFSPlORQR2YV-2512E4283.000GLOBEADOCYESFCECQR~FSQRPIZYV-2514C.4283.000GATEAHOCYESFAIEOORPl2YV-2525E7284.000GATEAHO0/CYESFAIECQRPI2Y

$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$FLORIDAPCAIERANDLIGHTCOMPANYREVISIOM:

3VALVETABLESDATE:09/01/91SaintLuciaNuclearPlant-Unit1PAGE:9$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$PSID:8770G078SH130SYSTEM:SAFETYINJECTION SYSTEM$$$$$$$$$$$'$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ACT.NORMREMFAILTESTRELIEFVALVENUMBERCOORD.CLCAT.SIZETYPEA/PTYPEPOS.INDHCOEEXAMFREQREQ.REMARKSFCV.3306E.42B10.000GLOBEAPOLOYESFOECQRPI2YHCV3657F-42812.000GLOBEA00LCYESFAIEOPIQR2YMV.03.2ED42810.000GLOBEAHOLOYESFAIECQRPl2YSR~07.1ASR~07.1BF.B2C0'50RELIEFAS/ACNOSRVRFED82C0.750RELIEFAS/ACNOSRVRFV.07000F-72C14~000CHECKAS/ACNOCV/0RFVR-7CV/POQRVR7V.07001E-72C14.000CHECKAS/ACMOCV/0RFVR7CV/POQRVR7V.07009V.3101H22A2.000GLOBEPNAMLCNO-SLT12YVR-5052C2.000CHECKAS/ACNOCV/CCSVR-29CV/POQRVR~29INSPRFVR-29V.3103D-52C2.000CHECKAS/ACNOCV/CCSVR.29CV/POQRVR-29INSPRFVR29V-3104E.S2C2.000CHECKAS/ACNOCV/CCSVR.30CV/POQRVR-30INSPRFVR.30V.3105E.52C2.000CHECKAS/AC'OCV/CCSVR.30CV/POQRVR-30INSPRFVR.30V.3106F-52C10.000CHECKAS/ACNOCV/CCSCV/0CSV.3107E-52C10.000CHECKAS/ACNOCV/CCSCV/0CS

$$'$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$FI.ORIDAPOMERANDLIGHTCCHPANYVALVETABLESSaintLucialiuclearPlant~Unit1REVISION3DATE:09/01/91PAGE:10$$$$$$$$$$$$$$$$$$$$'$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$P4ID:8770-0-078 SN130(cont),SYSTEH:SAFETYINJECTION SYSTEH$$$$$$$$$$$$$$$$$$'$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ACT.NORHREHFAILTESTRELIEFVALVENUHBERCOORD.CLCAT.SIZETYPE,A/PTYPEPOS.INDHCOEEXAHFREQREQ.REHARKSV.3206F42810.000GATE,PHOLOYESFAIPl2YV.3207E-42B10.000GATEPHOLOYESFAIPl2'YV-3401D-72C6.000CHECKAS/ACNOCV/0RFVR.BCV/POQRVR8V.34108-7'C8.000CHECKAS/ACNOCV/0RFVR~8CV/POQRVR~8V.34128.32C0'00RELIEFAS/ACNOSRVRFV-34148'2C3.000STP.CKAS/A0NOCV/CQRCV/0RFVR-9V.3417V-3427C-32C1.000RELIEFAS/ACNOSRVRF~~C.S2C3.000STPCKAS/A0NOCV/CQRCV/0RFVR.9V.34300-72C0.500RELIEFAS/ACNO.,SRVRFV.3431D-62C0.500RELIEFAS/ACNOSRVRFV.3432E-82814.000GATEAHOLOYESFAIECQRPl2YV-3439V-34440.32C0.500RELIEFA8/ACNOSRVRF~~~F.B2814.000GATEAHOLOYESFAIECQRPl2YV.3452G-82812.000GATEAHOLCYESFAIEOQRPI2YV-3453G.82812.000GATEAHOLCYESFAIEOPl00QR2YV.3456G-32810.000GATEAHOLCYESFAIEOQRPl2YV-3457G.32810.000GATEAHOLCYESFAI,EOPlQR2Y FLORIDAPOMERANDLIGHTCCHPANYVALVETABLESSaintLuciaNuclearPlant-Unit1REVISION:

3DATE:09/01/91PAGE:11'5X5SSRICESRSCCRSSCSCCSiRX 0$$$'RSSSR5SXZCXXSSRXPSID:8770-0-078 SN130(cont)SYSTEH:SAFETYINJECTION SYSTEHsssazxx24msl$$ZRRSCR5RIRZN5545$SSSSSSRSX 24CzACT.NORHREHFAlLTESTRELIEFVALVENUHBERCOORD.CLCAT~SIZE'IYPEA/PTYPEPOS.INDHMEEXAHFREDREQ.REHARKSV.3463N.22A2.000GLOBEPHANLCNOSLT.12YVR-5V.36538-4284.000GATEAHOLOYESFAIECQREOQRPI2YV.3654B.4286.000GATEPHOLOYESFAIPl2YV.3655C.42B4.000GATEAHOLCYESFAIECEOPIQRQR2YV.3656C-42B6.000GATEPHOLOYESFAIPl2YV.3659N-5283.000GATEAHOLOYESFAIECCSPl2YV-3660G.S283.000GATEAHOLOYESFAIECCSPI2YV-3662072B4.000GATEAHOCYESFAIECEOPlQRQR2YV.36630.7284.000GATEAHOCYESFAIECEOPlQRQR2Y FLORiOAPOUERANDLIGHTCOHPANYVALVETABLESSaintLuciaNuclearPlant-Unit1REVISION:

3DATE:09/01/91PAGE:I2z--mmmmamammma


mammammmammm-mmmmammm aammaaamm


m-aagmmaammmmmaamammmmm P4IO:8770'078SH131SYSTEH:SAFETYINJECTION SYSTENmagaaammmmmmmmmmmmmammmmmmmmmmACT.HORNRENFAILTESTRELIEFVALVEHUHBERCOORO.CLCAT~SiZETYPEA/PTYPEPOS.IHONODEEXANFREQREQ.RENARKSFCV-03-1E 8.62A,0.375NEEDLEASOCYESFCECQRFSQRPl2YSLT.12YFCV.03-1F 8-72A0.375NEEDLEASOCYESFCECFSPlSLT-1QRQR2Y2YHCV-3615H-7286.000GLOBEAHOCYESFAIEOQRPl2YHCV.3616G-7282F000GLOBEAHOCYESFAIEOQRPl2YHCV.3617G7282.000GLOBEAHOCYESFAIEOPIQR2YHCV-3618F-6181.000GLOBEA00CYESFCECFSPICSCS2YHCV-3625F7,286.000GLOBEANO'YESFAIEOPlQR2YHCV-3626E-7282.000GLOBEANOCYESFAIEOQRPl2YHCV.3627E-7282.000GLOBEAHOCYESFAIEOPIQR2YHCV.3628F.318F000GLOBEA00CYESFCECCSFSCSPl2YHCV-36350-7286.000GLOBEANOCYESFAIEOPIQR2YIHCV-3636C-7282.000GLOBEANOCYESFAIEOPlQR2YHCV-3637C-7282.000GLOBEANOCYESFAIEOQRPl2Y

FLORIDAPOWERAHDLICH'ICOHPANYVALVETABLESSaintLuciaNuclearPlant-Unit1REVISION:

3DATE:09/01/91PAGE:13P&ID:8770-G-078 SH131(cont)SYSTEH:SAFETYINJECTION SYSTENXRSSSXCRid@SZSSSSCXI55505SOS'5ACT.HORNRENFAILTESTRELIEFVALVEHUHBERCOORD.CLCAT.SIZE'TYPEA/PTYPEPOS.INDNODEEXANFREQREQ.REHARKSHCV-36388.5181.000GLOBEADOCYESFCECFSPlCSCS2YHCV-364587286.000GLOBEAHOCYESFAIEOPIQR2YHCV.3646A-7282.000GLOBEANOCYESFAIEOQRPI2YHCV-3647A.7282.000GLOBEAHOCYESFAIEOQRPl2YHCV.36488-3181.000GLOBEADOCYESFCECCSFSCSPl2YNV-03-1AE.7282.000GLOBEANOLCYESFAIECQREOQRPl2YNV.03-180-7282.000GLOBEANOLCYESFAIECQREOQRPl2YV.31130-71AC2.000CHECKAS/ACNOCV/C2YVR10CV/0RFVR10SLT-22YVR-2V.3114H-71AC6+000CHECKAS/ACNO'V/C2YCV/0CSSLT-22YVR11VR-11VR-2V-3123E-71AC2.000CHECKAS/ACNOCV/C2YVR-10CV/0RFVR10SLT-22YVR-2V-3124F-71AC6.000CHECKAS/ACNOCV/CCV/0SLT.22YVR.11CSVR~11,2YVR~2V-3133C-71AC2.000CHECKAS/ACNOCV/C2YVR-10'V/0 RFVR.10SL1'.22YVR.2

FLORIDAPOMERANDLIGHTCCHPANYVALVETABLESSaintLucieNuclearPlant~UnitI5CC1SRSSCCSSSC 5SCCZSSC$$21CIamaP810:8770.G.078 SH131(cont)SYSTEN:SAFETYINJECTION SYSTEN$$SXSCSRSSXZZ1ISSSCS5I'RSXIZREVISION:

3DATE:09/01/91PAGE:14ACT.NORNRENFAILTESTRELIEFVALVEHUHBERCOORD.CLCAT.SIZETYPEA/PTYPEPOS~IHDNODEEXANFREQREQ.RENARKSV.3134D.71AC6.000CHECKAS/ACNOCV/CCV/0SLT-22YVR-11CSVR.112YVR2V-31438.71AC2.000CHECKAS/ACNOCV/CCV/0SLT-22YVR-10RFVR102YVR-2V.31448.71AC6.000CHECKAS/ACNOCV/C2YVR-11CV/0CSVR11SLT-22YVR2V.3215F-52AC12.000CHECKAS/ACNOCV/C2YVR12INSPRFVR-12SLT-22YVR.2V-3217F-41AC12.000CHECKAS/ACNOCV/CCV/POINSPSLT-22YVR.13CSVR.13RFVR-132YVR.2V-3225F-22AC12.000CHECKAS/ACNOCV/CINSPSLT-22YVR-12RFVR~122YVR.2V.3227F-21AC12.000CHECKAS/ACNOCV/CCV/POINSPSLT.22YVR.13CSVR.13RFVR132YVR-2V.3235B.52AC12.000CHECKAS/ACNOCV/C2YVR.12INSPRFVR.12SLT-22YVR-2V-32378-41AC12.000CHECKAS/ACHOCV/CCV/POIHSPSLT.22YVR-13CSVR13RFVR132YVR.2V-3245C-22AC12.000CHECKAS/ACNOCV/C2YVR.12INSPRFVR~12SLT.22YVR2

  • FIk RSSSSZFLORIDAPOMERANDLIGHTCCHPANYVALVETABLESSaintLuciaNuclearPlant~Unit1REVISION:

3DATE:09/01/91PAGE:15P8ID:8770.0.078 SN131(cont)SYSTEH:SAFETYINJECTION SYSTEHa1ataISIR50QCS$$SICs551I05$$Ii1ACT.NORHREHFAILTESTRELIEFVALVENUHBERCOORD.CLCAT.SIZETYPEA/PTYPEPOS.INDHCOEEXAHFREDRED.REHARKSV-32478.11AC12.000CHECKAS/ACNOCV/CCV/POINSPSLT22YVR13CSVR-13RFVR132YVR-2V-34680-72CF000RELIEFAS/ACNOSRVRFV.3469E42C1.000RELIEFAS/ACNOSRVRFV-3480E-5"1A10.000GATEAHOLCYESFAIEOCSPl2YSLT-22YVR.2V-3481E-51A-10.000GATEAHOLCYESFAIEOCSPl2YSLT.22YVR-2V-3482E-52C1.000RELIEFAS/ACNOSRVRFV-3483E-62C2.000RELIEFAS/ACNOSRVRFV-3614F-52812.000GATEAHOLOYESFAIECCSPI2YV-3624F-22812.000GATEAHOLO'YESFAIECCSPl2YV-3634V.3644B52B12.000GATEAHOLOYESFAIECCSPl2Ye,8.22B12.000GATEAHOLOYESFAIECCSPI2YV-3651D41A10.000GATEAHOLCYESFAIEOPlSLT.2CS2Y2YVR-2V-3652D41A10.000GATEAHOLCYESFAIEOPlSLT-2CS2Y2YVR.2

FLORIOAPOMERANDLIGHTCOHPANYVALVETABLESSaintLucieNuclearPlant-Unit1ZXiIRSOS555SREVISION:

3DATE:09/01/91PAGE:16P4IO:8770-0.078 SN150SYSTEH:SAHPLINGSYSTEHAC1'.NORHREHFAIL'ESTRELIEFVALVENUHBERCOORSCLCAT.SIZETYPEA/PTYPEPOS.INOHOOEEXAHFREQREQ.REHARKSV.5200G.72A0.375GLOBEA00CYESFCECQRFSQRPl2YSLT-12YV-5201F-72A0.375GLOBEA00CYESFCECFSPlQRQR2YSLT-1-2YV.5202E-72A0.375GLOBEA00CYESFCECQRFSQRPl2YSLT-12YV.52036-72A0.375GLOBEA00CYESFCECFSPlSLT-1QRQR2Y2YV.5204F72A0~375GLOBEA00CYESFCECFSPlSLT-1QR2Y2YV.5205E-72A0.375GLOBEA00CYESFCECFSPlSLT.1QRQR2Y2Y FLORIDAPOMERANDLIGHTCOHPAHYVALVETABLESSaintLuciaNuclearPlant-Unit1REVISION:

3DATE:09/01/91PAGE:17P4ID:87700.078SH160SYSTEH:MASTEHAHAGEHEHT SYSTEH$$$$$$$$$$$$$$$$$$$$5$$$$$$$$$$$$$$$$$$$$$$$$$$5$$$$$$$$$$$$$$$$$$$$$$$ACT.HORNREHFAILVALVEHUHBERCOORD.CLCAToSIZETYPEA/PTYPEPOS.IHDHCOEEXAHTESTRELIEFFREDRED.REHARKSV.6301F-6'A3.000DIAPHA000YESFCECQRFSQRPI2YSLT~12YV.6302F.62A3.0000IAPHA000'YESFCECFSPISLT-1QROR2Y2Y FLORIDAPOMERANDLIGHTCOHPAHYVALVETABLESSaintL'ucieNuclearPlant-Unit1REVISION:

3DATE:09/01/91PAGE:18P&ID:8770.G-078 SH163SYSTEH:MASTEHANAGEHENT SYSTEHXCOORRRS5iSRIC10550RRZSSSOSC 005$$ACT.HORNREHFAILTESTRELIEFVALVEHUHBERCOORD.CLCAT.SIZETYPEA/PTYPEPOS.INDHCOEEXAHFREQREQ.REHARKSV.6554F.72A1F000DIAPHADO0QR,QR2Y2YV.6555F.72A1.000DIAPHADO0'YESFCECFSPlSLT-1QR2Y2YV-67410-72A1.000GLOBEADO0/CYESFCECFSPlSLT.1QRQR2Y2YV-67790-72AC1.000CHECKAS/A0/CNOCV/CQRSLT-12Y I'I FLORIDAPONERANDLIGHTCCHPANYVALVETABLESSaintLuciaNuclearPlant~Unit1CSSIa01CZ I50$$05$55$c10sagasREVISION:

3DATE:09/01/91PAGE:,19P8ID:87700.079SN1SYSTEH:HAINS'IEAHSYSTEHggaRRRSRSOR5C5 ZXCR1R55CZRZACT.NORHREHFAILTESTRELIEFVALVENUHBERCOORD.CLCAT.SIZETYPEA/PTYPEPOS.INDNODEEXAHFREQREQ.REHARKSNCV.08.1A K.122BC34.000STPCKAAO0YESECCSPECQRPI2YNCV.08.18 "C.122BC34.000STPCKAAO0YESECPECPICSQR2YNCV.08.2A

.J-10288.000GLOBEAAOCYESFCECEOFSPIQRQRQR2YNCV08-28C10288.000GLOBEAAOCQRQRQR2YHV-08-03H-10284.000GATEAHOCYESFAIEOQRPl2YHV.08-13N9283.000GATEA'OCYESFAIEOQRPI2YHV0814E-9283.000GATEAHOCYESFAIEOQRPl2YHV-08.1AK-1228F000GATEAHOCYESFAIEC'RPI2'YHV0818D.11283.000GATEAHOCYESFAIECQRPl2YV.08117K-122C34.000CHECKAS/A0NOINSPRFVR14V-08130G-92C4.000CHECKAS/A0XOCV/0CSCV/POQRV.08131G-9~.284.000GATEAHAN0NOECQRV.08148C-122C34.000CHECKAS/A0NOINSPRFVR-14V.08163E.92C4.000CHECKAS/ACNOCV/0CSCV/POQR

SR504RISCFLORIDAPOUERANDLIGHTCOMPANYVALVETABLESSaintLuciaNuclearPlant-Unit15S0RZ055@$1SQCSCS55SSSRCP8,ID:8770~G-079SH1(cont)SYSTEK:HAINS'IEAHSYS'IEH2'llSS11'51RZRZCC X5i15215CSCACT.NORMREHFAILVALVENUMBERCOORD.CLCAT~SIZETYPEA/PTYPEPOS.INDNCOEEXAMREVISION:

3DATE:09/01/91PAGE:20TESTRELIEFFREQREQ.REMARKSV-08164F-9284.000GATEAHAH0NOECQRV-08448E.92-C4.000CHECKAS/A"CHOCV/0CSCV/POQRINSPRFVR36V.08492J-92C4.000CHECKAS/A4CMOCV/0CV/POIHSPCSQRRFVR-36V.8201K.112C6.000RELIEFAS/ACNOSRVRFV-8202K112C6.000RELIEFAS/ACMOSRVRFV.8203K.112C6.000RELIEFAS/ACNOSRVRFV-8204K112C6.000RELIEFAS/ACMOSRVRFV-8205C112C6.000RELIEFAS/ACMOSRVRFV.8206C112C6.000RELIEFAS/ACNOSRVRFV-8207C112C6.000RELIEFAS/ACNOSRVRFV-8208C.112C6.000RELIEFAS/ACNOSRVRFV-8209K-112C6.000RELIEFAS/ACNOSRVRFV.8210K.112C6.000RELIEFAS/ACNOSRVRFV-8211K112C6.000RELIEFAS/ACNOSRVRFV-8212K-112C6.000RELIEFAS/ACNOSRVRFV.8213C112C6.000"RELIEF AS/ACNOSRVRFV-8214C112C6.000RELIEFAS/ACHOSRVRFV-8215C11'.7C6.000RELIEFAS/ACMOSRVRFV-8216C112C6.000RELIEFA8/ACMOSRVRF h,t' FLORIDAPOMERANDLIGHTCOMPANYVALVETABLESSaintLucieNuclearPlant-Unit1REVISION:

3DATE:09/01/91PAGE:21PI,ID:8770.G.080 SH3SYSTEH:FEEDIIATER SYSTEHRRRCSSRZCXI2$52ICSSSSSSC5SXCSXXI510XZ'RXCZACT.NORHREHFAlLTESTRELIEFVALVENUHBERCOORD.CLCAT.SIZETYPEA/PTYPEPOS.INDHODEEKAHFREQREQ.REMARKSHV.09.07E-62820.000GATEAHO0YESFAIECPICS2YHV09.08E-112B20.000GATEAHO0YESFAIECCSPl2YHV-09-09AlE-13B4.000GLOBEAHOCYESFAIECEOPl'QRQR2YHV.09.10E-16384.000GLOBEAHOCYESFAIECQREOQRPl2YHV.09-11E.4384.000GLOBEAHOCYESFAIECQREOQRPl2YHV.09.12E-13384.000GLOBEAHOCYESFAIECQREOQRPl2YHV.09-13K-2382.500GLOBEAHOCYESFAIEOQRPl2YHV-09-14H2382.500GLOBEAHOCYESFAIEOQRPl2YV-09248E-62C20.000CHECKAS/A0NOINSPRFVR-38V.09280E-112C20.000CHECKAS/A0NOINSPRFVR-38V.12174K-113C8.000CHECKAS/ACNOCV/0CSCV/POQRV.12176K-113C8.000CHECKAS/ACNOCV/0CSCV/POQRV.12507H-9..7.C0.750CHECKAS/ACNOCV/POQRVR.31INSPRFVR-31V.9107H-43C4.000CHECKAS/ACNOCV/CCSCV/0CSV9119012C4.000CHECKAS/ACNOCV/0CS

FLORIDAPOWERANDLIGHTCONPANYVALVETABLESSaintLuciaNuclearPlant-Unit1CCI5~R5255'5XREVISION:

3DATE:09/01/91PAGE:22PSID:8770-0-080 SH3<cont)SYSTEN:FEEDMATER SYSTENACT.HORHREH"FAILTESTRELIEFVALVEHUHBERCOORD.CLCAT.SI2ETYPEA/PTYPEPOS.INDHOOEEXAHFREQREQ.REMARKSV-9123K.C3C4.000CHECKAS/ACHOCV/CCSCV/0:CSV-91350-162C4.000CHECKAS/ACNOCV/0CSV-9139H43C6.000CHECKAS/ACNOCV/0CSV-9151E-42CF000CHECKAS/ACNOCV/0CSV-9157E-132C4.000CHECKAS/ACHOCV/0CSV.9252V-9294A-62C18.000CHECKAS/A0NOA-112C18.000CHECKAS/A0HOCV/0ORCV/0ORV-9303l-43C2.000CHECKAS/ACHOCV/POORVR-31IHSPRFVR-31V-9304L-C3CF000CHECKAS/ACNOCV/POQRVR-31IHSPRFVR-31V-9305N-43C2.000CHECKAS/ACNOCV/POQRVR-31INSPRFVR.31 FLORIDAPOUERAHDLIGHTCOHPANYVALVETABLESSaintLucieNuclearPlant-Unit1REVISION:

3DATE:09/01/91PAGE:23P8ID:8770G082SH1SYSTEH:INTAKECOOLINGllATERSYSTEHSSSSSXI1CRCZZ5CSCS5SCCSRiSS0SVRSRSACT.NORNRENFAlLVALVENUHBERCOORD.CLCAT.SIZETYPEA/PT'YPEPOS.INDNODEEXAHTESTRELIEFFREQREQ.RENARKSNV.21-2E-53824.000BUTFLYAHO0YESFAIECPlCS2YNV.21-3F-43824.000BUTFLYAHO0YESFAIECPICS2YTCV-14-4A 833830.000BUTFLYAPO0HOFOEE.CSVR.35FSCSTCV-14.48 833830.000BUTFLYAPO0NOFOEECSVR35FSCSV-21162H-43C30.000CHECKAS/A0/CHOCV/CQRCV/0QRV-21205H53C-30.000CHECKAS/A0/CNOCV/CQRCV/0QRV-21208H-73C30.000CHECKAS/A0/CNOCV/C'RCV/0QR FLORIDAPOMERAHDLIGHTCOHPAHYVALVETABLESSaintLucieNuclearPlant-.Unit1SCCRO'RMRSN55$55>555ISNREVISION:

3DATE:09/01/91PAGE:24PBID:8770-0.082 SH2SYSTEH:INTAKECCOLINGMATERSYSTEHSS0ZRC5iCSXXCRXRRCRX10ROC0$5RSCSCCSXXXSC0I$505RSSCESSACT.HORNREHFAILTESTRELIEFVALVEHUHBERCOORD.CLCAT.SIZETYPEA/PTYPE,POS.INONODEEXAHFREDREQ.REMARKSFCV.21.3A 1.4382.000GLOBEAPo0YESFcEcQRFSQRPI2YFCV.21-38

.I.4382.000GLOBEAPo0YESFcEcQRFSQRPI2YV.21005H33C2.000CHECKAS/ACHoCV/0QRV.21010H-43C2.000CHECKAS/ACHoCV/0QRV.21015J43C2.000CHECKAS/ACNoCV/CQRV.21017V.210443C2.000CHECKAS/ACNoCV/CQR8-153C1.000CHECKAS/A0HoCV/CQRCV/0QRV.210468-163C1.ODOCHECKA8/AONOCV/CQRCV/0QRV.210588-163C1.000CHECKAS/AONOCV/CQRCV/0QRV.210608-163C1.000CHECKAS/A0NoCV/CQRCV/0QR F

FLORIDAPOMERAHDLIGHTCOHPANYVALVE'TABLESSaintLucieNuclearPlant-Unit1REVISION:

3DATE:09/01/91PAGE:25P8ID:8770.0.083 SYSTEN:CCHPONENT COOLINGSYSI'EN1?5$$5CZ500555CCR05SXRRCRSACT.HORNREMFAILTESTRELIEFVALVEHUNBERCOORD.CLCAT.SIZETYPEA/PTYPEPOS.INDNODEEXANFREDREO.RENARKSHCV.14.10.62A8.000SU'IFLYAPO0YESFCECFSPlSLT.1CSCS2Y2YVR-5HCV-IC.10H153816.000BUTFLYAPO0YESFCECQRFSORPl2YHCV-1C2D.22A8.000BUTFLYAPO0YESFCECFSPlSLT-1CSCS2Y2YVR-5HCV-14-3A N33814.000BUTFLYAPO0YESFOEOCSFSCSPl2YHCV.14.38 N-33814.000BUTFLYA'PO0YESFOEOCSFSCSPl2YHCV-14-6'12A8.000BUTFLYAPO0YESFCECFSPlSLT.1CSCS2Y2YVR.5HCV-14-70-52A8.000SUTFLYAPO0,YESFCECFSPISLT-1CSCS2Y2YVR.5HCV-14-BA F143816.000SUTFLYAPO0YESFCECQRFSQRPl2YHCV-14-88 F153816.000BUTFLYAPO0YESFCECQRFSQRPI2YHCV-14.90'53816.000SUTFLYAPO0YESFCECQRFSQRPl2Y XR'RISE'55<<50RSiSRSSS<XCXSSZSCSX5XZXZCFLORIDAPOMERANDLIGHTCOMPANYVALVETABLESSaintLucieNuclearPlant.Unit1ggCS1RXRRI50115005R5>>15RSREVISION:

3DATE:09/01/91PAGE26P8ID:8770-0.083 (cont)SYSTEH:COHPONENT COOLINGSYSTEHACT.NORHREHFAILVALVENUHBERCOORSCLCAT~SIZET'YPEA/PTYPEPOS.IHDHCOETESTRELIEFEXAMFREQREO.REHARKSHV14.10.163824.000BUTFLYAHO0/CYESFAIEcEOPlQRQR2YHV.14.20-173824.000BUTFLYAHO0/CYESFAIEcEOPlQRQR2YHV-14-3G.163824.000BUTFLYAHO0/CYESFAIEcQREOQRPl2YMV-14~40-173824.000BUTFLYAHO0/CYESFAIEcQREOORPl2YHV.14-5G-73810.000BUTFLYAHO0YESFAIEOCSPl2YHV.14-6G-73810.000BUTFLYAHO0YESFAIEOCSPl2YHV1470-73810.000BUTFLYAHO0YESFAIEOCSPI2YHV-14-8G-73810.000BUTFLYAHO0YESFAIEOCSPI2YV.14143E-16,3C20.000CHECKAS/A0/CXOCV/CQRCV/0QRV.14147E-163C20.000CHECKAS/A0/CNOCV/CCV/0ORQRV-14151E-173C20.000CHECKAS/A0/CNOCV/CQRCV/0QR

XR0X5CSR5CC1RIIIXXSSR1S$FLORIDAPOWERANDLIGHTCCHPANYVALVETABLESSaintLucieNuclearPlant~Unit1$5$5REVISION:

3DATE:'09/01/91 PAGE:27P4ID:8770.0.084 SN1SYSTEH:HAKE.UPMATERS'YSTEHIRXSCXXSRSS$

1RSR54$$$SRSRACT.NORHREHFAILVALVENUHBERCCORD.CLCAT.SIZETYPEA/PTYPEPOS.INDHOOEEXAHTESTRELIEFFREQRED.REHARKSHV-15-1N-162A2.000GATEAHOCYESFAIECPlSLT.1QR2Y7.YV-15328I.162AC2.000CHECKAS/ACNOCV/C2YVR-15SLT.12Y

SC'RXRSCXRFLORIDAPONERANDLIGHTCOHPAHYVALVETABLESSaintLuciaNuclearPlant-Unit1REVISION:

3DATE:09/01/91PAGE:28P&ID:8770.0-085 SH1SYSTEH:SERVICEAIRSYSTEM055$SIRESXCSSRZSSSCSS$$4SSAcj'.HORNREHFAILVALVENUHBERCOORD.CLCAT.SIZETYPEA/PTYPEPOS.IHDNODEEXANTESTRELIEFFREQREQ.RENARKSV-18794G62A2.000GLOBEPHANLCHOSLT12YVR5V-18796062A2.000GLOBEPHANLCNO'LT.12YVR.5'.18797G62A1.000BALLPHAHLCNOSLT1ZYV.18798G.62A1.000BALLPHAHLCHOSLT-I2Y~~

FLORIDAPOMERANDLIGHTCOHPANY;VALVETABLESSaintLuciaHucIearPlant-Unit1$REVISION:

3DATE:09/01/91PAGE:29$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$P4ID:8770.G-085 SH2,sYBTEN:INBTRUNENT AIRsYBTEN$$$$$$$$$$$$$$'$$~'$$$$$$$$$$$$$$$$$$$$$$$$$'$$$$$$$$$$$$$$$$$$$$$$$$$$$$$ACT.HORNRENFAILTESTRELIEFVALVENUHBERCOORD.CLCA'T.SIZETYPEA/PTYPEPOS.INDNCOEEXANFREDREQ.RENARKSNV-18-1F.62A2.000GLOBEANO0YESFAIECPl'LT-1QR2Y2YV-18195E.52AC2.000CHECKAS/A0HOCV/CSLT-12YVR-162YV-18279H-12C0.500CHECKAS/A0HOCV/CRFVR-37V.18283G22C0.500CHECKAS/A0HOCV/CRFVR37 lg FLORIDAPOMERANDLIGHTCCHPANYVALVETABLESSaintLuciaNuclearPlant-Unit1REVISION:

3DATE:09/01/91PAGE:30P4IO:8770.6.086 SYSTEH:HISCELLANEOUS SYSTEHSggg$5$55'malI55~Qsx0C55CCRCACT.NORHREHFAILTESTRELIEFVALVENUHBERCOORD.CLCAT.S!ZETYPEA/PTYPEPOS.INDHCOEEXAHFREQREQ.,REHARKSV.17204J~123C1.500CHECKAS/ACNOCV/0QRV-1721CL-123C1.500CHECKAS/ACNOCV/0QR FLORIDAPOUERANDLIGHTCOHPANYVALVETABLESSaintLucieNuclearPlant-Unit1REVISION:

3DATE:09/01/91PAGE:31amma50<<ISO'zz05$SRSSSZ@SR55Z5SXSSP&IO:8770.G.088 SYSTEH:CONTAINHENT SPRAYSYSTEH115RR1501JCS21$SSStX100ACTVALVENUHBERCOORO.CLCAT.SIZETYPEA/PTYPENORHREHFAILPOS.INDHOOEEXAHTESTRELIEFFREQREQ.REHARKSFCV-07.'lA G122812.000GLOBEA00CYESFOEOFSPlQRQR2YFCV.07.18 H-122812.000GLOBEA00CYESFOEOQRFSQRPI2YLCV-07.11A J-112A2.000GLOBEA000/CYESFCECFSPISLT-1QRQR2Y2YVR-5LCV.07.118 J.122A2.000GLOBEA000/CYESFCECFSPISLT-1QRQR2Y2YVR-5HV-07-1AE-32824.000BUTFLYAHO0YESFAIECQRPl2YHV-07-18E-22824.000BUTFLYAHO0YESFAIECQRPI2YHV-07.2AK-122824.000BUTFLYAHOCYESFAIEOPlQR2YHV-07-28K122824.000BUTFLYAHOCYESFAIEOPlQR2YHV-07-3AG132812.000GATEAHOLOYESFAIECQRPl2YHV-07-38H-132812.000GATEAHOLOYESFAIECPlQR2YSE.07-1AN4282.000GLOBEASOCYFSFCECQREOQRFSQRPl2YSE0718N5282.000GLOBEASOCYESFCECQREOQRFSQRPl2Y

FLORIDAPOUERANOLIGHTCONPANYVALVETABLESSaintLucieHuciearPlant-Unit1REVISION:

3DATE:09/01/91PAGE:32*SSSZ5$$$$1CSRSSR1XZXS5$$$5RZ$1RCXCRXP8IO:8770-0-088 (cont)SYSTEN:CONTAINHEHT SPRAYSYSTEN$5ICS5XS0C$$515SICI0SRC15IZCACT.HORNRENFAIL'IESTRELIEFVALVENUHBERCOORD.CLCAT.SIZETYPEA/PTYPEPOS.IN0HCOEEXANFREQREQ.REHARKSSE.07.2AN.4282.000GLOBEASOCYESFCECEO,FSPlQRQRQR2YSE-07-28N-5282.000GLOBEASOCYESFCECEOFSPlQRQRQR2YV.07119J72C24.000CHECKAS/ACNOCV/POQRVR-17.INSPRFVR-17V-07120J.72C24.000CHECKAS/ACNOCV/POQRVR-17INSPRFVR-17V.07129H-52C12.000CHECKAS/ACHOCV/0RFVR-18CV/POQRVR-18V-07143G52C12.000CHECKAS/ACNOCV/0RFVR.18CV/POQRVR-18V.07170J-122A3.000GATEPNANLCNOSLT-12YVR-5V-07172K122C24.000CHECKAS/ACNOIHSPRFVR19V-07174K.122C24.000CHECKAS/ACNOINSPRFVR19V.07188I142AF000GATEPNANLCNO'LT-12YVR-5V.07189I-142A3.000GATEP'AHLCNOSLT-12YVR.SV.07192V.07193G~142C10.000CHECKAS/ACNOF-142C10.000CHECKAS/ACNOIHSPRFVR-20IHSPRFVR-20V.07206I-122A3.000GATEPNANLCNOSLT-12YVR5V.07231K-5..2C2.000CHECKAS/ACHOCV/0QRV.07232K-42C2.000CHECKAS/ACHOCV/0QRV.07256J-12C2."000CHECKAS/ACHOCV/CRFVR-21CV/0RFVR-21

FLORIDAPOWERANDLIGHTCOMPANY,VALVETABLESSaintLuciaNuclearPlant-Unit1REVISION:

3DATE:09/01/91PAGE:33$$$$$$'$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$PT,ID:8770-G-DSS (cont)SYSTEH:CONTAINHENT SPRAYSYSTEH$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$'$'$'$$$$$$$$$$$$$$$$$$$$$$$ACT.NORHREHFAlLTESTRELIEFVALVENUHBERCOORD.CLCAT.SIZETYPEA/PTYPEPOS.INDHOOEEXAMFREDRED.REHARKSV.07258J22C2.000CHECKAS/ACMOCV/CRFVR.21CV/0RFVR-21V.07269V.07270J-22C3.000CHECKAS/ACMOIMSPRFVR.22RFVR22K22C3.000CHECKAS/ACNOINSP I,If, FLORIDAPOUERANDLIGHTCOMPANYVALVETABLESSaintLucieNuclearPlant-UnitIREVISION:

3DATE:09/DI/91PAGE:34EJECTSSCROXCCS5CC5$2QS54ORS0CS5QRSSSSSSP8ID:87700.092SYSTEH:HISCELLANEOUS SAHPLINGSYSTEHSxagals$$0%0$5$$$SCRSR0ISCSSs5Ossa4sSss0SSXACT.NORHREHFAlLTESTRELIEFVALVENUHBERCOORD.CLCAT.SIZETYPEA/PTYPEPOS.INOHOOEEXAMFREDREQ.REMARKSFCV-26.10-22A1.000GLOBEADO0YESFCECFSPISLT-IQRQR2Y2YFCV-26.2G.42A1.000GLOBEAOO0YESFCECQRFSQRPl2YSLT-12YFCV.26-3N-22A1.000GLOBEA00CYESFCECFSPlSLT.1QRQR2Y2YFCV-26-4N-42A1.000GLOBEADO0'YESFCECQRFSQRPl2YSLT-12YFCV-26.5I-22A1.000GLOBEA000QRQR2Y2YFCV-26.6I-42A1.000GLOBEAOO0YESFCECQRFSQRPl2YSLT-12YFSE.27-1A-122A0.375GLOBEASOCYESFCECEOFSPlSLT.IQRQRQR2Y2YFSE-27.10 C-132A0.375GLOBEASOCQRQRQR2Y2Y

FLORIDAPOMERANDLIGHTCOMPANYVALVETABLESSaintLucieNuclearPlant-Unit1REVISION:

3DATE:09/01/91PAGE:35P8IO:8770.G.092 (cont)SYSTEH:HISCELLANEOUS SAHPLINGSYSI'EHS$$5SSS55CCX11$XR%Z5RRISRSSi'8SCREEXC'5RC5$550140552ACT.NORHREHFAILTESTRELIEFVALVENUHBERCOORD.CLCAT.SIZETYPEA/PTYPEPOS.IKDHCOEEXAHFREDREQ.REHARKSFSE.27.11 C.132A0.375GLOBEASOCYESFCECEOFSPlSLT-1QRQRQR2Y2YFSE.27.28-122A'.375GLOBEASOCYESFCECEOFSPlSLT.1QRQRQR2Y2YFSE.27.38-122A0.375GLOBEAYESFCECEOFSPlSLT-1SOCQRQRQR2Y2YFSE-2748-122A0;375GLOBEASOCYESFCECQREOQRFSQR;PI2YSLT-12YFSE-27.5C-142A0.375GLOBEASOCYESFCECEOFSPISLT-1QRQRQR2Y2YFSE-27-68-142A0.375GLOBEASOCYESFCECEOtJFSPlSLT1QRQRQR2Y2YFSE-27.78-142A0.375GLOBEASOCYESFCECEOFSPlSLT.1QRQRQR2Y2Y XX1I5CSSZ5CZXRRS1SSZ5SCSRSXFLORIDAPOUERANDLIGHTCOMPANYVALVETABLESSaintLucieNuclearPlant-Unit1S050$555CRISEZSCRXRRRgC PTID:8770.G.092 (cont)SYSTEM:MISCELLANEOUS SAMPLINGSYSTEMSREVISION:

3DATE:09/01/91PAGE:36gaRCX4SRSR155SRRZSSZRSCSS S0SOSACT.NORMREMFAILTESTRELIEFVALVENUMBERCOORD.CLCAT.SIZETYPEA/PTYPEPOS.INDMODEEXAMFREDREQ.REMARKSFSE27.8C.112A0.375GLOBEASOCQRQRQR2Y2YFSE-27.9C142A0.375GLOBEASOCYESFCECEOFSPISLT-1QRQRQR2Y2YV-27101B-132AC0.375CHECKAS/ACNOCV/CCV/0SLT.1RFVR-32QR2YV.271028-132AC0.375CHECKAS/ACNOCV/CCV/0SLT-1RFVR.32QR2YV.27105E-132C0.375CHECKAS/ACNOCV/0QRV.27110E-132C0.375CHECKAS/ACNOCV/0QRV-293050.82C0.375CHECKAS/ANOCV/CQRVR24CV/0QRV-293060.82C0.375CHECKAS/ANOCV/CQRVR~24CV/0QR FLORIDAPOMERANOLIGHTCOHPANYVALVETABLESSaintLuciaNuclearplant-Unit1REVISION:

3OATE:09/01/91PAGE:37P810:8770.6.093 SYSTEH:HISCELLANEOUS SYSTEHSR5X$RHI50SSCXSR5O'SS'mSSCS 0XS5CSSACT.NORHREHFAILVALVENUHBERCOORO.CLCAl'.SIZETYPEA/PTYPEPOS.INOHOOEEXAHTESTRELIEFFREQREQ.REHARKSSB.37-1J.113B54.000BUTFLYAAOCYESFOEOFSPlSPVR.25SPVR.252YSB-37-2J.123854.000BUTFL'YAAOCYESFOEOSPVR-25FSSPVR-25Pl2YV-00101F-112A8.000GATEPHANLCNOSLT-12YV.00139,I.12A0.375GLOBEPHAMLCNOSLT12YVR-5V-00140I12A1.000GLOBEPHANLCNOSLT.12YVR-5V-00143I.22A1.000GLOBEPHANLCNOSLT.I2YVR.SV.00144I-22A0.375GLOBEPRANLCNOSLT.12YVR-5

FLORIDAPOHERAHDLIGHTCOMPANYVALVETABLESSaintLucieNuclearPlant-Unit1REVISION:

3DATE:09/01/91PAGE:38PBID:8770.G.096 SH1SYSTEM:EMERGENCY DIESELGENERATOR 1AXZSCS$$55SSSSCSRSSCSCSS 5!RR$$5$4555'%55@55CXRSRIOSRSSR 05ZVALVENUMBERACT.MORNREMFAILCOORD.CLCAT.SIZETYPEA/PTYPEPOS.INDMCOEEXAMTESTRELIEFFREDREQ.REMARKSFCV.59.1A1 K.53B1.500GATEAAOCHOEOQRVR.27FCV.59-2A1 K.2381.500GATEAAOCMOEOQRVR-27FCV.59-3A1 G93B1.500GATEAAOCMOEOQRVR..27FCV-59-4A1 B-103B1.500GATEAAOCHOEOQRVR-27SE.59-1AL.13B2.000GLOBEASOCNOFCEEQRVR-26FSQRSE-59.3AI.6381.500GATEASOCNOEOQRVR-27SE-594AA.8381.500GATEASOCNOEOQRVR.27SE-59-5AI-3381.500GATEASOCMOEOQRVR-27SE.59-6AH-8381.500GATEAAOCHOEOQRVR-27SR-59-3AJ-123C0.000RELIEFAS/ACNOSRVRFSR-59.4AJ.113C0.000RELIEFAS/ACNOSRVRFSR-59SAJ-93C0.000RELIEFAS/ACMOSRVRFSR-59.6AJ-83C0.000RELIEFAS/ACHO'RVRFV.59079J143C1.000CHECKAS/ACMOCV/CQRV-59156K143C1.000CHECKAS/ACMOCV/CeeQR FLORIDAPOJERANDLIGHTCOHPAHYVALVETABLESSaintLucieNuclearPlant-Unit1PIID:8770-G.096 SH2SYSTEH:EHERGEHCY DIESELGEHERATOR 18REVISION:

3DATE:09/01/91PAGE:39ACT.NORHREHFAILTESTRELIEFVALVENUHBERCOORD.CLCAT.SIZETYPEA/PTYPEPOS.INDNODEEXAHFREQREQ.REHARKSFCV-59-181 H9381.500GATEAAOCHOEOQRVR-27FCV-59-281 8.9381.500GATEAAOCHOEOQRVR-27FCV-59.381 J-538,1.500GATE'AOCHOEOQRVR27FCV-59.481 J2381.500GATEAAOCHOEOQRVR.27SE-59.18L-1382.000GLOBEASOCNOFCEEQRVR26FSQRSE-59-381-3381.500GATEASOCNOEOQRVR.27SE-59-48A-8381.500GATEASOCNOEOQRVR.27SE-59.581-6381.500GATEASOCHOEOQRVR.27SE-59-68H-8381.500GATEASOCNOEOQRVR.27SR.59.38J-123C0.000RELIEFAS/ACNOSRVRFSR-59-48J-113C0.000RELIEFA8/ACNOSRVRFSR-59-58J-93C0.000RELIEFAS/ACHOSRVRFSR-59-68J-83C0.000RELIEFAS/ACHOSRVRFV-59125J143C1.000CHECKAS/ACXOCV/CQRV-59158K-143C1.000CHECKAS/ACNOCV/CQR

$$$$$$$'$$$$$$$$$$FLORIDAP(AIERANDLIGHTCOHPANYVALVETABLESSaintLucieNuclearplant-Unit1REVISION:

3DATE:09/01/91PAGE:40P8ID:8770.0-878 SYSTEH:HEATING,VENT.,4AIRCONDITIONING

$$$$$$$$$$$$$$$$$$$ACT.NORHREHFAILTESTRELIEFVALVENUHBERCOORD.CLCAT.SIZETYPEA/PTYPEPOS.INDHCOEEXAHFREQREQ.REMARKSFCV.25.1J.152B48.000BUTFLYAPOCYESFCECFSPlCSCS2YFCV;25-2J.152A48.000BUTFLYAPOCYESFCECFSPlSLT-1CSCS2Y2YVR.SFCV-25.3J.152A48.000BUTFLYAPOFC.YESFCECFSPlSLT-1CSCS2Y2YVR-5FCV-25-4K.122A48.000BUTFLYAPOCYESFCECFSPlSLT-1CSCS2Y2YVR-5FCV-25-5K112A48.000BUTFLYAPOCYESFCECFSPlSLT-1CSCS2Y2YVR-5FCV-25-6K.112848.000BUTFLYAPOCYESFCECCSFSCSPI2YFCV-25-7L-122A24.000BUI'FLYA00CYESFCECFSPlSLT.1ORQR2Y2YFCV.25-8L-122A24.000BUTFLYA00C'YESFCECFSPlSLT.1QRQR2Y2YV.25.11V.25.12K-152A3.000GATEPHANLCNOSLT-12YVR-51~~K.152A3.000GATEPHANLCNOSLT-12YVR-5V-25-13I-12'A3.000GATEPHANLCNOSLT-12YVR-5V.25-14I122A3.000GATEPHANLCNOSLT12YVR5 FLORIDAP(SERAHDLIGHTCOMPANYVALVETABLESSaintLucieNuclearPlant-Unit1CCXCCSCREVISION:

3DATE:09/01/91PAGE:41PSID:8770.0.878 (cont)SYSTEH:NEATIHG,VEHT'.,TAIRCOHDITIOHIHG CROCCOOSVALVENUHBERACT.HORNREHFAILTESTRELIEFCOORD.CLCAT.SIZETYPEA/PTYPEPOS.IHDNCOEEXAHFREQRED.REMARKSV.25.15.J112A3.000GATEPHAHLCHOSLT-1V.25.16J-112A3.000GATEPHAHLCHOSLT-12YV.25'0C.142AC24.000CHECKAS/ACHOCV/CCSSL1'-12YV-25-21C.142AC24.000CHECKAS/ACNOCV/C"CSSLY12Y FLORIDAPOMERANDLIGHtCOHPANYVALVETABLESSaintLuciaNuclearPlant-UnitIREVISION:

3DATE:09/01/91PAGE:42RC1$$1$15115115151$$5$1$1151115111111111155P8ID:8770.G.879 SYSTEH:HEATING,VENT~,ANDAIRCONDITIONING 151$$$111$11$1151$$1SR$$$'115111C1$$1111111111$111111$11111S1$$51$CR1'1'1'$$1$11$1ACT.NORHREHFAILTESTRELIEFVALVENUHBERCOORD.CLCAT.SIZETYPEA/PTYPEPOS.INDHOOEEXAHFREQREQ.REHARKSFCV.25-11 N-142824.000BUTFLYAHOCYESFAIECEOPlQRQR2YFCV-25.12 J-142824.000BUTFLYAHOCYESFAIECQREOQRPl2YFCV-25.13 1-162812.000BUTFLYAHO0YESFAIEOPIQR2YFCV-25.14 E-11380.000BUTFLYAHOCYESFAIECQREOQRPl2YFCV-25.17 E-11380.000BUTFLYAHOCYESFAIECQREOQRPl2YFCV.25.18 A.10380.000BUTFLYAHO0'ESFAIECQRPl'YFCV-25-19 A-11380.000BUTFLYAHO0YESFAI'CQRPl2YFCV-25-24 810380.000BUTFLYAHO0YESFAIECPIQR2YFCV.25.25 8-11380.000BUTFLYAHO0YESFAIECPlQR2YV-25-23a-142C8.000SRCKAS/ANOCV/0QRV25-24N-142C8.000SRCKAS/A"NOCV/0QR

AppendixDValveProgramRequestsforRelief I7 RELIEFREQUESTNO.VR-1REVISION39/1/91SYSTEM:VariousCOMPOETS:Anyvalvestestedduringcoldshutdownconditions.

CATEGORY:

VariousFCON:VariousSCONREURENT:Valvesshallbeexercised

...unlesssuchoperation isnotpractical duringplantoperation.

Ifonlylimitedoperation ispractical duringplantoperation, thevalveshallbepart-strokeexercised duringplantoperation andfullstrokeexercised duringcoldshutdowns.

Fullstrokeexercising duringcoldshutdowns forallvalvesnotfull-stroke exercised duringplantoperation shallbeonafrequency determined bytheintervals betweenshutdowns asfollows:Forintervals of3monthsorlonger-exerciseduringeachshutdown.

(IWV-3412, IWV-4315andIWV-3522) 0Inmanyinstances testingofallvalvesdesignated fortestingduringcoldshutdowncannotbe-completed duetothebrevityofanoutageorthelackofplantconditions neededfortestingspecificvalves.IthasbeenthepolicyoftheNRCthatiftestingcommences inareasonable timeandreasonable effortsaremadetatestallvalves,thenoutageextension orsignificant changesinplantconditions arenot'equired whentheonlyreasonistoprovidetheopportunity forcomplet'ion ofvalvetesting.ASME/ANSI OMa-1987, Operation andMaintenance OfNuclearPowerPlants,Part10(Paragraphs 4.2.1.2and4.3.2.2)recognizes, thisissueandallowsdeferredtestingassetforthbelow.

REVISION39/1/91RELIEFREQUESTNO.VR-1(cont.)ALTERNATE TESTING:Forthosevalvesdesignated tobeexercised ortestedduringcoldshutdown, exercising shallcommenceassoonaspractical aftertheplantreachesastablecoldshutdowncondition asdefinedbytheapplicable Technical Specification butnolaterthan48hoursafterreachingcoldshutdown.'f anoutageissufficiently longenoughtoprovidefortestingofallvalvesrequiredtobetestedduringthecoldshutdownperiod,thenthe48-hourrequirement neednotapplyifallvalvesaretestedduringtheoutage.Valvetestingneednotbeperformed moreoftenthanonceeverythree(3)monthsexceptasprovidedforinIWV-3417(a).

Completion ofallvalvetestingduringacoldshutdownoutageisnotrequiredifplantconditions precludetestingofspecificvalvesorifthelengthoftheshutdownperiodisinsufficient tocompletealltesting.Testingnotcompleted priortostartupmayberescheduled forthenextshutdowninasequencesuchthatthetestscheduledoesnotomitnorfavorcertainvalvesorgroupsofvalves.Itshouldbenotedthattherearetwoconditions ofcoldshutdownidentified intheprogramtables(Appendices DandE),namelypressurized

'andvented.Forthepurposeofthisrequirement, theterm'coldshutdown'efers totherespective condition asnotedinthetables.Theprogramtablesidentifythosevalvestowhichcoldshutdowntestingapplies.RefertoAppendixGfordiscussion ofthereasonsandjustification forallowingcoldshutdownvs.quarterly testing.D-2 SYSTEM:RELIEF,REQUESTNO.VR-2REVISION39/1/91SafetyInjection/Residual HeatRemoval(8770-G-078, Sh131)COMPONENTS:

V-3113V-3114V-3123V-3124V-3133V-3134V-3143V-3144V-3215V-3217V-3225V-3227V-3235V-3237V-3245V-3247V-3280V-3281V-3251V-3252CGOYoA/C(CheckValves)A(Motor-operated valves)FCION:Thesecheckvalvesopentoprovideforhigh-pressure andlow-pressuresafetyinjection totheRCS.Themotor-operated valvesopenforresidualheatremovalrecirculation duringshutdown.

Eachofthesevalvesisdesignated asapressureisolation valve(PIV)andprovidesisolation ofsafeguard systemsfromtheRCS.ll'CTIONEUIREMETheleakagerateforvalves6-inchesorgreatershallbeevaluated perSubsection INV-3427(b).

(IWV-3521)

BASSORREF:Leaktesting ofthesevalvesisprimarily forthepurposeofconfirming theircapability ofpreventing over-pressurization andcatastrophic failureofthesafetyinjection pipingandcomponents.

.Inthisregard,specialleakageacceptance criteriaisestablished andincludedintheSt.LucieITechnical Specifications (Table3.4.6-1)'thataddresses thequestionofvalveintegrity inamoreappropriate mannerforthesevalves.Satisfying boththeTechnical Specification andtheCodeacceptance criteriaisnotwarranted andimplementation wouldbedifficult andconfusing.

D-3

RELIEFREQUESTNO.VR-2(cont.)REVISION39/1/91LTETESING0Theleakagerateacceptance criteriaforthesevalveswillbeestablished pertheSt.LucieUnit1Technical Specifications, Table3.4.6-1.2~3~4~Leakagerateslessthanorequalto1.0gpmareconsidered acceptable.

Leakageratesgreaterthan1.0gpmbutlessthanorequalto5.0gpmareconsidered acceptable ifthelatestmeasuredratehasnotexceed,theratedetermined bytheprevioustestbyanamountthatreducesthemarginbetweenmeasuredleakagerateandthemaximumpermissible rateof5.0gpmby50%orgreater.Leakageratesgreaterthan'.0gpm,butlessthanorequalto5.0gpm,areunacceptable ifthelatestmeasuredrateexceededtheratedetermined bytheprevioustestbyanamountthat.reducesthemarginbetweenmeasuredleakagerateandthe,maximumpermissible rateof5.0gpmby504orgreater.Leakageratesgreaterthan5.0gpmareunacceptable.

D-4 REVISION39/1/91RELIEFREQUESTNO.VR-3SYSTEM:VariousCOONENTS:VariousVariousC0ThisisagenericRequestforReliefSC0UIf,forpower-operated valves,anincreaseinstroketime'f504ormoreforvalveswithfull-stroke timeslessthanorequalto10secondsisobserved, thetestfrequency shallbeincreased toonceeachmonthuntilcorrective actionistaken,at.whichtimetheoriginaltestfrequency shallberesumed(IWV-3417(a))

Thestroketimemeasurements takenduringtestingoffast-'cting valves(thoselessthan2seconds)aresubjecttoconsiderable variation duetoconditions unrelated tothematerialcondition ofthevalve(eg.testconditions, operatorreactiontime).Inaccordance withReference 2.7,Position6,analternate methodofevaluating stroketimesisconsidered acceptable.

G'hestroketimeevaluation forthosevalvesdesignated inthevalvetables(Appendices D&E)as"fast-acting" willn'otaccountforsuccessive increases ofmeasuredstroketimeperIWV-3417(a) withthechangeintestfrequency as'required.

Inlieuofthis,theassignedmaximumlimitingvalueofstroketimewillbeestablished at2seconds.Uponexceeding the2-secondlimit,avalvewillbedeclaredinoperable andcorrective actiontakeninaccordance withIWV-3417(b).

ThisagreeswithReference 2.7,Position6,and,assuch,isconsidered tobeapproveduponsubmittal.

D-5

RELIEFREQUESTNO.VR-4'EVISION39/1/91WITHDRAWN D-6

REVISION39/1/91RELIEFREQUESTNO.VR-5SYSTEM:PrimaryContainment COMPONETS:Containment Isolation ValvesperTableVR-5-1CTEGORAorA/CUNC0Thesevalvesareclosedtoprovidecontainment isolation.

ECIOREUREMENCategoryAvalvesshallbeseatleaktestedandamaximumpermissible leakagerateshallbespecified Individual valveleakageratesshallbeevaluated perIWV-3426andIWV-3427.

(IWV-3426, IWV-3427, NRCGenericLetter89-04)BSISORREIEF:Duetothe"configuration ofthesystempipingandcomponents, inmanycasesindividual leakageratetestsareimpractical.

Inthesecasesitiscustomary toperformtestswiththetestvolumebetweenvalvesinseriesorbehindvalvesinparallelpaths.AtSt.Lucie,thevalveleakrateacceptance criteriaforcontainment isolation valvesisdetermined byapplyingafractionoftheaggregate allowable leakratetoeachvalvebasedontheratioofitsnominaldiametertothesumofthediameters ofallcontainment isolation valvestestedintheProgram.Thisconceptisbasedonthelimitingpractical aspectsofma'intaining largevalvesvs.smallervalvesandisconsistent withIWV-3426.

Thus,thereisnosafetysignificance oftherelatively smallallowable leakageofsmallvalvesinachieving thegoalsof10CFR50,AppendixJ.Inthoseinstances whereseveralvalves,possiblyofdifferent sizes,aretestedasagroup,thevalveindividual diameters aresummedtoarriveatan"effective" sizeforthepenetration andthatnumberisusedintheratiototheD-7 RELIEFREQUESTNO.VR-5(cont.)BASISFORRELIEFcot.REVISION39/1/91totalforallvalvestoarriveatanacceptance criteriaforthe"test."Sinceunderthesecircumstances itisseldompossibletoquantifytheleakagefromtheindividual valves,establishing theacceptance criteriabasedonthesmallestvalveinthegroupwouldresultinexcessive andunnecessary maintenance ofthelargervalves.Althoughthisallowable leakratemaybesignificantly greaterthanthatassociated withthesmallestvalveofthegroup,itisstillconsistent withtheconceptsofAppendixJ,thegoverning regulation, andpresentsnoadditional riskofcontainment leakagebeyondthoseexistingrequirements.

TG:Inthosecaseswhereindividual valvestestingisimpractical, valveswillbeleaktested simultaneously inmultiplevalvearrangements andamaximumpermissible leakageratewillbeappliedtoeachcombination ofvalves.Testresultsfromtestsofmultiplevalveswillbeevaluated inaccordance withI%V-3426andIWV-3427.

PTRATONO.81011232441'24647~~52dVLVESV-18794andV-18796,FCV-25-4andFCV-25-5FCV-25-2andFCV-25-3HCV-14-1andHCV-14-7HCV-14-2andHCV-14-6V-3463andV-07009LCV-07-11A andLCV-07-11B V-07-206andV-07-189V-07-170andV-07-188V-00140andV-0014352e565758V-00139andV-00144V-25-11andV-25-12V-25-13andV-25-14V-25-15andV-25-16D-8 RELIEFREQUESTNO.VR-6REVISION39/1/91SYSTEM:ChemicalandVolumeControl(8770-G-078 Sh121)V-2177V-2190V-2191CAGORC0V-2177openstoprovideaflowpathforemergency borationfromtheboricacidmakeuppumpstothesuctionofthechargingpumps.'ikewise, V-2190openstoprovideaflowpathforemergency borationviagravitydrainfromtheboricacidmakeuptankstothesuctionofthechargingpumps.V-2190closestopreventrecirculation totheboricacidmakeuptankswhentheboricacidmakeuppumpsareinoperation.

ValveV-2191openstoprovideaflowpathfromtherefueling watertank(RWT)tothesuctionofthechargingpumpsasanalternate'upply ofboratedwaterforborationanditclosestopreventbackflowtotheRWTduringemergency borationviatheBMT's..SONUCheckvalvesshallbeexercised atleastonceevery3months,exceptasprovidedby,IWV-3522.

(IWV-3521)

BS0F:Testingthesevalvesintheopendirection requirestheintroduction ofhighlyconcentrated boricacidsolutionfromtheboricacidmakeuptankstothesuctionofthechargingpumps.This,inturn,wouldresultintheadditionofexcessborontotheRCSwhichwouldadversely affectplantpowerlevelandoperational parameters withthepotential foranundesirable plant'transient andaplanttriporshutdown.

Duringcoldshutdown, theintroduction ofexcess-

'I REVISION39/1/91RELIEFREQUESTNO.VR-6(cont.)BSISORRELIEFcont.Iquantities ofboricacidisundesirable fromtheaspectof,maintaining properplantchemistry,.

andtheinherentdifficulties thatmaybeencountered duringthesubsequent startup.TestingV-2190andV-2191inthecloseddirection shouldbedonefollowing theopenexerciseandisbestperformed inconjunction withtestingoftheboricacidmakeuppumpsduringeachreactorrefueling outage.SG:Thesevalveswillbeexercised asrequiredduringeachreactor'efueling outage.Thisrequestforreliefisequivalent toReliefRequestsCVCS1and2previously submitted onSeptember 4,1987(RefFPLLetterL-87-370) and,perReference 2.7,isapproved.

D-10 RELIEFREQUESTNO.VR-7REVISION39/1/91SYSTEM:llSafetyInjection (8770-G-078 Sh130)COPONENTS:V-07000V-07001CATEGORY:

FUNCTON:Thesevalvesopentoprovideflowpaths fromtheRWTtothe.suctionoftheassociated low-pressure safetyinjection pump.SECIONXIEUIREMENT:

Checkvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyIWV-3522.

(IWV-3521) 0F~Fullstrokeexercising thesevalvestotheopenpositionrequiresinjection viatheLPSIpumpsintotheRCS.Duringplantoperation thisisprecluded becausetheLPSIpumpscannot.developsufficient discharge pressuretoovercomeprimarysystempressure.

Atcoldshutdown, theshutdowncoolingsystemcannotprovidesufficient letdownflowtotheRWTtoaccommodate fulldesignflowfromtheRWTwhilemaintaining thenecessary corecoolingfunction.

Thus,essentially, theonlypractical timefortestingthesevalvesisduringrefueling outageswhenwaterfromtheRWTisusedtofillthecavity.

RELIEFREQUESTNO.VR-7(cont.)ALTRNATETESING:REVISION39/1/91Thesevalveswillbepartial-flow exercised duringquarterly testingoftheLPSIpumpsviatheminimumflowcircuitandfull-flow exercised duringeachreactorrefueling outage.Thisalternate testingsatisfies therequirement ofReference 2.7,Position1.-Furthermore, thisrequestforreliefisequivalent toReliefRequestSIS3previously submitted onSeptember 4,1987(RefFPLLetterL-87-370).

Thus,perReference 2.7,thisrequestforreliefisapproved.

D-12 0I RELIEFREQUESTNO.VR-8REVISION39/1/91SYSTEM:SafetyInjection (8770-G-078 Sh130)COMPONENTS:

V-3401V-3410CGORY0CTON:Thesevalvesopentoprovideflowpaths fromtheRWTandthecontainment sumptothesuctionoftheassociated high-pressuresafetyinjection pump(HPSI).SCONRUCheckvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyIWV-3522.

(IWV-3521)

SORLFullstrokeexercising thesevalvestotheopenpositionrequiresinjection viatheHPSIpumpsintotheRCS.Duringplantoperation thisisprecluded becausetheHPSIpumpscannotdevelopsufficient discharge pressuretoovercomeprimarysystempressure.

Duringcoldshutdownconditions, operation oftheHPSIpumpsisrestricted toprecludeRCSsystempressuretransients thatcouldresultinexceeding thepressure-temperature limitsspecified intheTechnical Specifications, Section3.4.9.D-13

RELIEFREQUESTNO.VR-8(cont.)REVISION39/1/91ALTERNTSING:Thesevalveswillbepartial-flow exercised duringquarterly testingoftheHPSIpumpsviatheminimumflowcircuitandfull-flow exercised duringeachreactorrefueling outage.Thisalternate testingsatisfies therequirement ofReference 2.7,Position1.Furthermore, thisrequestforreliefisequivalent toReliefRequestSIS2previously submitted onSeptember 4,1987(RefFPLLetterL-87-370).

Thus,perReference 2.7,thisrequestforreliefisapproved.

D-14 REVISION39/1/91RELIEFREQUESTNO.VR-9~SYSTESafetyInjection (8770-G-078 Sh130)COMPOENTS:V-3414V-3427CATEGORY:

FUNCTION:

Thesevalvesopentoprovideflowpaths fromtherespective HPSIpumpstothehigh-pressure safetyinjection headers.Theyclosetopreventrecirculation throughanidlepump.SECTIONXIREUIREMENT:

Checkvalvesshallbeexercised at.leastonceevery3months,exceptasprovidedbyIWV-3522.

(IWV-3521)

BASIS0RELIEF:Fullstrokeexercising thesevalvestotheopenpositionrequiresinjection intotheRCSviatheHPSIpumps.Duringplantoperation thisisprecluded becausetheHPSIpumpscannotdevelopsufficient discharge pressuretoovercomeprimarysystempressure.

Duringcoldshutdownconditions, operation oftheHPSIpumpsisrestricted toprecludeRCSsystempressuretransients thatcouldresultinexceeding thepressure-temperature limitsspecified intheTechnical Specifications, Section3.4.9.Partial-stroke exercising duringquarterly pumptestingisnotpractical sincetheminimumflowlinesbranchoffupstreamofthesevalves.D-15

REVISION39/1/91RELIEFREQUESTNO.VR-9(cont.)ALTERNATTESTING:Thesevalveswillbemanuallyexercised andverifiedclosedquarterly andfull-flow exercised totheopenpositionduringeachreactorrefueling outage.Thisalternate testingsatisfies therequirement ofReference 2.7,Position1.Furthermore, thisrequestforreliefisequivalent toReliefRequestSIS1previously submitted onSeptember 4,1987(RefFPLLetterL-87-370).

Thus,perReference 2.7,thisrequestforreliefisapproved.

D-16 REVISION39/1/91RELIEFREQUESTNO.VR-10SYSEM:SafetyInjection (8770-G-078 Sh131)COMONETS:V-3113V-3123V-3133V-3143CTEGORA/CFCTON:Thesevalvesopentoprovideflowpaths fromthehigh-pressure safetyinjection headerstotheRCSandclosetoisolatetheheadersfromthehighpressureofthereactorcoolantsystem.0URCheckvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyIWV-3522.

(IWV-3521)

SS0Fullstrokeexercising ofthesevalveswouldrequireoperating ahighpressuresafetyinjection (HPSI)pumpatnominalaccidentflowrateandinjecting intothereactorcoolantsystemsincenofullflowrecirculation pathexists.Atpoweroperation thisisnotpossiblebecausetheHPSIpumpsdonotdevelopsufficient discharge pressuretoovercomereactorcoolantsystempressure.

Duringcoldshutdownconditions, operation oftheHPSIpumps.isrestricted toprecludeRCSsystempressure.transients thatcouldresultinexceeding thepressure-temperature limitsspecified intheTechnical Specifications, Section3.4.9.Thesearesimplecheckvalveswithnoexternalmeansofpositionindication, thustheonlypractical meansofverifying closureisbyperforming aleaktestorbackflowtest.Performing leaktests ofthesevalvesinvolvesaD-17 0

REVISION39/1/91RELIEFREQUESTNO.VR-10(cont.)BASSFORRELIEFcont.considerable effortsuchthattestingduringoperation orateachcoldshutdownoutagewouldconstitute anunreasonable burdenontheplantstaff.ATERNATESTNG:Atleastonceduringeachreactorrefueling outagethesevalveswillbefull-stroke exercised totheopenposition.

Atleastonceeverytwo(2)yearsthesevalveswillbeverifiedtocloseinconjunction withPIVleaktesting.

Thisalternate testingsatisfies therequirement ofReference 2.7,Position1.Furthermore, thisrequestforreliefisequivalent toReliefRequestSIS4previously submitted on.September 4,1987(RefFPLLetterL-87-370).

Thus,perReference 2.7,thisrequestforreliefisapproved.

D-18 RELIEFREQUESTNO.VR-11REVISION39/1/91SYSTEM:SafetyInjection (8770-G-078 Sh131)COONTS:V-3114V-3124V-3134V-3144CTEGOA/CO~Thesevalvesopentoprovideflowpaths fromthelow-pressure safety'njection headerstotheRCSandclosetoisolatetheheadersfromthehighpressureofthereactorcoolantsystem.SEIOUREMNT:Checkvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyDPT-3522.

(IWV-3521)

BSIS0RLIEF:Fullstrokeexercising ofthesevalveswouldrequireoperating alowpressuresafetyinjection (LPSI)pumpat.nominalaccidentflowrateandinjecting intothereactorcoolantsystemsincenofullflowrecirculation pathexists.Atpoweroperation thisisnotpossiblebecausetheLPSIpumpsdonotdevelopsufficient discharge pressuretoovercomereactorcoolantsystempressure.

Thesearesimplecheckvalveswithnoexternalmeansofpositionin6'ication, thustheonlypractical meansofverifying closureisbyperforming aleaktestorbackflowtest.Performing leaktests ofthesevalvesinvolvesaconsiderable effortsuchthattestingduringoperation orateachcoldshutdownoutagewouldconstitute anunreasonable burdenontheplantstaff.D-19 RELIEFREQUESTNO.VR-ll(Cont.)ATEAETESTING:REVISION39/1/91Thesevalveswillbefull-stroke exercised totheopenpositionduringcoldshutdownperiodsperReliefRequestVR-1~Atleastonceeverytwo(2)yearsthesevalveswillbeverifiedtocloseinconjunction withPIVleaktesting.

D-20 REVISION39/1/91RELIEFREQUESTNO.VR-12SYSTEM'afety Injection (8770-G-078 Sh131)COMPONTS:V-3215V-3225V-3235V-3245CATEGOY:A/CCIThesevalvesopentoprovideflowpaths fromthesafetyinjection tankstotheRCSandclosetoisolatethetanksfromthehighpressureofthereactorcoolantsystemandthesafetyinjection headers.S0XIREUINCheckvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyIWV-3522.

(IWV-3521)

Fullstrokeexercising ofthesevalveswouldrequireinjecting fromatankundernominalpressureintoade-pressurized reactorcoolantsystem.Atpoweroperation thisisnotpossiblebecausetheSISTankpressureisinsufficient toovercomereactorcoolantsystempressure.

Underaccidentconditions, themaximum(peak)flowthroughthesevalveswouldbeapproximately 20,000gpmduetoalargebreakLOCA.Duringcoldshutdownorrefueling therequiredtestconditions fordeveloping thisfullaccidentflowcannotbeestablished.

Furthermore, duringtheseperiodsitisalsonotpossibletoestablish flowconditions typically requiredtouseanyofthenon-obtrusive diagnostic techniques currently underdevelopment.

4D-21 REVISION39/1/91RELIEFREQUESTNO.VR-12(Cont.)BASISFORRELIEFcont.FP&Lhasreviewedtheoperating andmaintenance historyofthesevalvesandsimilarvalvesusedthroughout theindustryunderlikeconditions.

Basedonthesereviews,thereisnoevidenceofvalvedegradation withrespecttotheirabilitytoopenandsatisfactorily passthe,requiredflow.Itisapparentfromthefailuredatathattheprimarymodeoffailureisrelatedtovalveleakage-bothpasttheseatandexternalthroughthebody-bonnet andhingepingasketjoints.Itshouldalsobenotedthatthesevalvesarenotsubjected toanysignificant flowduringplantoperation aswellas'maintenance periods;thusitisunlikelythatthesevalveswouldexperience anyservice-related damageorwear.Althoughcheckvalvedisassembly isavaluablemaintenance toolthatcanprovideagreatdealofinformation aboutavalve'sinternalcondition, duetothedifficulties associated withthesemaintenance activities, itshouldonlybeperformed underthemaintenance programat.afrequency commensurate withthevalvetypeandservice.Inthislight,FP&Lconsiders thefrequency ofinspection forthesevalvesofonceeach10-yearinspection intervaltobeadequatetoensurethecontinued operability ofthesevalves.Thesearesimplecheckvalveswithnoexternalmeansofpositionindication, thustheonlypractical meansofverifying closureisbyperforming aleaktestorbackflowtest.Performing leaktests ofthesevalvesrequiresaconsiderable effortsuchthattestingduringoperation wouldconstitute anunreasonable burdenontheplantstaff.D-22 REVISION39/1/91RELIEFREQUESTNO.VR-12(Cont.)ALTERNATE TESTING:AtleastonceduringeachISI(10year)inspection intervaleachofthesevalveswillbedisassembled, inspected, andmanuallystrokedtoverifyoperability.

Shouldavalveunderinspection befoundtobeinoperable, thentheremaining threevalveswillbeinspected duringthesameoutage.Assurance ofproperreassembly willbeprovidedbyperforming aleaktestorpartial-flow testpriortoreturning avalvetoservicefollowing disassembly.

Thissatisfies therequirements ofGenericLetter89-04,Position2.Atleastonceeverytwo(2)yearsthesevalveswillbeverifiedtocloseinconjunction withPIVleaktesting.

D-23 RELIEFREQUESTNO.VR-13REVISION39/1/91~SYSEM:SafetyInjection (8770-G-078 Sh131)CO0NS:V-3217V-3227V-3237V-3247CEGOR4A/CCT0ThesevalvesopentoprovidefloWpaths fromthesafetyinjection headerstotheRCSandclosetoisolatetheheadersfromthehighpressureofthereactorcoolantsystem.UNCheckvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyIWV-3522.

(IWV-3521)

SS0LIEPullstrokeexercising ofthesevalveswouldrequireinjecting fromasafetyinjection tankundernominalpressureintoade-pressurized reactorcoolantsystem.Atpoweroperation thisisnotpossiblebecausetheSISTankpressureisinsufficient toovercomereactorcoolantsystempressure.

Duringcoldshutdownorrefueling therequiredtestconditions cannotbeestablished andthesimulated LOCAtest,performed withoutcreatinganunacceptable transient inthereactorcoolantsystem.D-24 1

REVISION39/1/91RELIEFREQUESTNO.VR-13(Cont.)BSSFOREcot.FP&Lhasreviewedtheoperating andmaintenance historyofthesevalvesandsimilarvalvesusedthroughout theindustryunderlikeconditions.

Thereareatotaloften(10)12-inchAtwood-Morrill checkvalvesofthisdesigninstalled inUnit1.Sinceplantstartupin1976atotalof7plantworkordershavebeeninitiated forworkonthesevalves.Ofthesevenworkorders,fourverefordisassembly andinspection whiletheremaining wererelatedtoexternalgasketleaks.AsearchoftheNuclearPlantReliability DataSystemforproblemswithvalvessimilartotheserevealed17reports-9duetoseatleakageandtheremaining 8wererelatedtogasketleaks.Basedonthesereviewsthereisnoevidenceofvalvedegradation vithrespecttotheirabilitytoopenand.satisfactorily passtherequiredflow.Itisapparentfromthefailuredatathattheprimarymodeoffailureisrelatedtovalveleakage-bothpasttheseatandexternalthroughthebody-bonnet andhinge'ingasketjoints.Inordertodisassemble andinspectthesevalves,thereactorcoolantsystemmustbeplacedinmid-loopor"reducedinventory" condition forseveraldays.InresponsetoissuesraisedinNRCGenericLetter88-17,FP&Lisconcerned aboutcontinued operations viththeplantinacondition of"reducedinventory."

Duringtheseperiods,theriskofover-heating thecoreisincreased duetothehigherprobability ofanincidentwhereshutdowncoolingislost.Thisriskiscompounded bythereducedvolumeofwateravailable toactasaheatsinkshouldcoolingbelost.Since1982therehavebeenatleastsix(6)reportedeventsintheindustrywherecoolingflowwaslostwhileaplantvasina"reducedinventory" condition.

JAlthoughcheckvalvedisassembly isavaluablemaintenance toolthatcanprovideagreatdealofinformation aboutavalve'sinternalcondition, duetothedifficulties associated withthesemaintenance activities, itshouldonlybeperformed underthemaintenance programatafrequency commensurate withthevalvetypeandservice.Giventhelackofevidencethatthesevalvesareexperiencing significant failuresvithrespecttotheircapability ofpassingthedesignflowrates andtheapparentsensitivity ofthevalvestoleaktesting,afrequency ofinspection forthesevalvesofonceeach10-yearinspection intervalisadequatetoensurethecontinued operability ofthesevalves.D-25

REVISION39/1/91RELIEFREQUESTNO.VR-13(Cont.)BASISFORELIEFcont.Thesearesimplecheckvalveswithnoexternalmeansofpositionindication, thustheonlypractical meansofverifying closureisbyperforming aleaktestorbackflowtest.Performing leaktests ofthesevalvesrequiresaconsiderable effortsuchthattestingduringoperation wouldconstitute anunreasonable burdenontheplantstaff.ALEATESTING:Duringcoldshutdownandrefueling periods,eachofthesevalveswillbepartial-stroke exercised usingtheLPSIpumpsperReliefRequestNo.VR-1.AtleastonceduringeachISI(10year)inspection interval.

eachofthesevalveswillbedisassembled, inspected, andmanuallystrokedtoverifyoperability.

Shouldavalveunderinspection befoundtobeinoperable, thentheremaining threevalveswillbeinspected duringthesameoutage.Assurance ofproperreassembly willbeprovidedbyperforming aleaktestorpartial-flow testpriortoreturning avalvetoservicefollowing disassembly.

Thissatisfies therequirements ofGenericLetter89-04,Position2.Atleastonceeverytwo(2)yearsthesevalveswillbeverifiedtocloseinconjunction withPIVleaktesting.

D-26 RELIEFREQUESTNO.VR-14REVISION39/1/91SYSTEM:MainSteam(8770-G-079, Sh1)COPONS:V-08117V-08148CATEGORFUNCT0Thesevalvesclosedtopreventunrestricted releaseofsteamfromanunaffected steamgenerator intheeventofasteamline ruptureupstreamofanMSIV.C0EUECheckvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyIWV-3522.

(IWV-3521)

BIS0F:Thereisnopractical meansorprovision forpressurizing thepipingdownstream ofthesevalvesinordertoverifyclosureofthesevalves.SDuringeachreactorrefueling outageatleastoneofthesevalveswillbedisassembled, inspected, andmanuallystrokedtoverifyoperability.

Inspections shallbescheduled suchthatvalves.willbecheckedinarotatingsequencesuchthateachvalveissubjecttoinspection atleastonceeverysix(6)years.'Shouldavalveunderinspection befoundtobeinoperable, thentheremaining othervalvewillbeinspected duringthesameoutage,afterwhichtherotational inspection schedulewillbere-initiated.

Following valvere-assembly notestingispossible(partial-flow orleaktesting) priortoplacingthevalvesinservice,thusnonewillbeperformed.

Thissatisfies therequirements ofGenericLetter89-04,Position2and,assuch,isconsidered tobeapproveduponsubmittal.

D-27 REVISION39/1/91RELIEFREQUESTNO.VR-15SYSTEM'akeup Water(8770-G-084, Sh1)COONENV-15328CTEGOY:A/CFCTON:Thisvalveclosestoprovideprimarycontainment iforthepenetration relatedtothemakeupwatersupplylinetothecontainment building.

SECTIOIREUIRENT:Checkvalvesshallbeexercised atleastonceevery3'months,exceptasprovidedbyIWV-3522.

(IWV-3521)

BS0EThisisasimplecheckvalvewithnoexternalmeansofpositionindication, thustheonlypractical meansofverifying closureisbyperforming aleaktestorbackflowtest.Thiswouldrequireaconsiderable effort,including entryintothecontainment

building, whichisimpractical duringplantoperation andwouldbeanunreasonable burdenontheplant,stafftoperformatcoldshutdown.

RNTTSTNAtleastonceeverytwo(2)years,thisvalvewillbeverifiedtocloseincon)unction withtheAppendixJleaktestingprogram.D-28

REVISION39/1/91RELIEFREQUESTNO.VR-16SSTEM:Instrument Air(8770-G-085, Sh2)COMPONEV-18195CEGORA/CFCTON'hisvalveclosestoprovideprimarycontainment forthepenetration relatedtotheinstrument airsupplylinetothecontainment building.

SIONUIEMECheckvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyIWV-3522.

(IWV-3521)

S0Thisisasimplecheckvalvewithnoexternalmeansofpositionindication, thustheonlypractical meansofverifying closureisbyperforming aleaktestorbackflowtest.Thiswouldrequireaconsiderable effort,including entry-intothecontainment buildingandsecuringallinstrument airtothecontainment.

Duetoaccesslimitations andtheundesirability ofisolating theairsupplyforcriticalequipment, thisisimpractical duringplantoperation andwouldbeanunreasonable burdenontheplantstafftoperformatcoldshutdown.

IG'tleastonceeverytwo(2)years,thisvalvewillbeverifiedtocloseincon)unction withtheAppendixJleaktestingprogram.D-29 REVISION39/1/91RELIEFREQUESTNO.VR-17~SYSTContainment Spray(8770-G-088)

COMPOS:V-07119V-07120CTGOFC0Thesevalvesopentoprovideflowpaths fromtherefueling watertank(RWT)tothecontainment sprayandsafetyinjection suctionheaders.S0Checkvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyIWV-3522.

(IWV-3521) l0Fullstrokeexercising ofthesevalveswouldrequiresimultaneous operation oftwoHPSIpumps,oneLPSIpump,andonecontainment spraypumptoverifythateachvalvecouldpassthemaximumdesignaccidentflow.Suchatestisnotpractical duringallplantoperational modes.TSDuringquarterly pumptestingeachofthesevalveswillbepartial-stroke exercised viarecirculation throughtheminimumflowtestcircuitsofthevarioussystems.D-30 REVISION39/1/91RELIEFREQUESTNO.VR-17(cont.)Gcot.tDuringeachreactorrefueling outageatleastoneofthesevalveswillbedisassembled, inspected, andmanuallystrokedtoverifyoperability.

Inspections shallbescheduled suchthatvalveswillbecheckedina,rotating sequencesuchthateachvalveissubjecttoinspection atleastonceeverysix(6)years.Shouldavalveunderinspection befoundtobeinoperable, thentheothervalvewillbeinspected duringthesameoutage,afterwhichtherotational inspection schedulewillbere-initiated.

Following re-assembly, eachvalvewillbepartial-flow exercised toverifyoperability.

Thissatisfies therequirements ofGenericLetter89-04,Position2and,assuch,isconsidered tobeapproveduponsubmittal.

RELIEFREQUESTNO.VR-18REVISION39/1/91SYSTEM:Containment Spray(8770-G-088)

COONENS:V-07129V-07143CGOUNCTION:Thesevalvesopentoprovideflowpaths fromtherespective containment spraypumptothecontainment sprayheaders.SCTONIREUIREMT:Checkvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyIWV-3522.

(IWV-3521)

Fullstrokeexercising ofthesevalveswouldrequireoperating eachcontainment spraypumpatnominalaccidentflowrate.

Sinceexercising thesevalvesthroughthenormalcontainment sprayflowpathwouldresultinsprayingdownthecontainment, theonlypractical flowpathavailable forsuchatestrequirespumpingwaterfromtheRWTtotheRCSviatheshutdowncoolingloops.Atcoldshutdown, theshutdowncoolingsystemcannotprovidesufficient letdownflowtotheRWTtoaccommodate fulldesignflowfromtheRWTwhilemaintaining thenecessary corecoolingfunction.

Eachofthesevalveswillbepartial-stroke exercised quarterly incon)unction withtestingofthecontainment spraypumpsviatheminimumflowtestline.Duringeachrefueling outage,eachvalvewillbeexercised atleastoncetodemonstrate fullstrokecapability.

D-32

RELIEFREQUESTNO.VR-19REVISION39/1/91SYSTEM:Containment Spray(8770-G-088)

CO0NS:V-07172V-07174CTEGORY:CON:Thesevalvesopentoprovideflowpaths fromthecontainment sumptothecontainment sprayandsafetyinjection suctionheadersduringrecirculation.

fS0EUREMENCheckvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyIWV-3522.

(IWV-3521) 0EIEExercising thesevalvestoanyextent(fullorpartialflow)wouldrequirefloodingthecontainment sumpandpumpingfromthesumptothecontainment sprayheadersandthereactorcoolantsystem.Itisbothundesirable andimpractical tofloodthecontainment sumpandtransferthatwatertotheRCSortothesprayheadersasitwouldcreatesignificant contamination hazardsandhaveanadverseeffectonplantchemistry.

Therearenootherprovisions forexercising thesevalves.Furthermore, sinceflowcannotbepassedthroughthesevalves,unobtrusive testingmethodsofverifying valveoperation arenotapplicable.

D-33

REVISION39/1/91RELIEFREQUESTNO.VR-19(cont.)ALTERNATE ESTING:Duringeachreactorrefueling outageatleastoneofthesevalveswillbedisassembled, inspected, andmanuallystrokedtoverifyoperability.

Inspections shallbescheduled suchthatthevalveswillbecheckedinarotatingsequencewitheachvalvesubjecttoinspection atleastonceeverysix(6)years.Shouldavalveunderinspection befoundtobeinoperable, thentheother,valvewillbeinspected duringthesameoutage,afterwhichtherotational inspection schedulewillbere-initiated.

Thissatisfies therequirements ofGenericLetter89-04,Position2and,assuch,isconsidered tobeapproveduponsubmittal.

Since,asdiscussed above,partialflowtestingofthesevalvesisnotpractical, exercising afterre-assembly willnotbeperformed.

D-34 k0 REVISION39/1/91RELIEFREQUESTNO.VR-20~SYSEContainment Spray(8770-G-088)

COMPONENS:V-07192V-07193CAGOUNCTIOThesevalvesopentoprovideflowpaths fromtherespective containment sprayheaderstothecontainment sprayrings.SC0UREMNT:Checkvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyIWV-3522.

(IWV-3521)

ASSORIEF:Anyexercising (full-stroke orpartialflowtesting)ofthesevalvesusingsystemflowrequirestheoperation ofeachcontainment spraypumpthroughthenormalcontainment sprayflowpaths.

Operating thesysteminthismannerwillresultinspillingsignificant quantities ofcontaminated waterthroughout thecontainment building.

Thisisobviously undesirable andisconsidered tobeimpractical.

Becausenon-obtrusive techniques ingeneralrequiresystemflow,theyarenotunderconsideration forthesevalves.Also,leaktesting ofthesevalvesisnotpossiblesince,duetothesystemconfiguration, thereisnopractical meansofclosingthepipingdownstream ofthesevalves.Performing periodicinspections ofbothvalvesduringrefueling outageswillsatisfytherequirement ofGenericLetter89-04Position1.D-35 REVISION3'/1/91RELIEFREQUESTNO.VR-20(cont.)ALTERNATE TESTING:Duringeachreactorrefueloutagesatleastoneofthesevalveswillbedisassembled, inspected, andmanuallystrokedtoverifyoperability.

ThisagreeswithReference 2.7,Position2;and,assuch,isconsidered tobeapproveduponsubmittal.

D-36

~r0 RELIEFREQUESTNO.VR-21REVISION39/1/91SYSTEM'ontainment Spray(8770-G-088)

COMPONENTS:

V-07256V-07258CATEGORY:

FUNCTION:

Thesevalvesopentoprovideflowpaths fromthesprayadditivetanktotherespective containment spraypumpsuctionheader.Theyclosetopreventreverseflowandrecirculation throughtheeductorleadingtoanidlecontainment spraypump.SECONENT:Checkvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyIWV-3522.

(IWV-3521)

S0Testingthesevalvesduringnormalplantoperation duringtestingofthecontainment spraypumpswouldcontaminate thecontainment spraypipingwithsodiumhydroxide.

'heonlypractical meansoftestingthesevalvesrequiresconnection ofasourceofdemineralized wateratthetankdischarge thendirecting waterintothecontainment spraypiping.Thisplacebothcontainment spraytrainoutofserviceandwouldentailasomewhatcomplexprocedure thatisconsidered outsidethescopeofworkthatistypically performed duringaroutinecoldshutdown, period,thus,suchatestisimpractical duringperiodsotherthanreactorrefueling outages.D-37

REVISION39/1/91RELIEFREQUESTNO.VR-21(cont.)ERNATETESTING:Duringeachreactorrefueling outagebothofthesevalveswillbefull-stroke exercised.

IThisrequestforreliefisequivalent toReliefRequestCS1previously submitted onSeptember 4,1987(RefFPLLetter'L-87-370).

Thus,perReference 2.7,thisrequestforreliefisapproved.

D-38 RELIEFREQUESTNO.VR-22REVISION39/1/91~SSTE~Containment Spray(8770-G-088)

COONENTS:V-07269V-07270CTEGORY:ZOLZIEL:Thesevalvesopentoprovideflowpaths fromthedischarge oftherespective containment spraypumpstothesprayadditiveeductorstoprovidethemotiveforceforsustaining sprayadditiveflowandtoprovideminimumflowforthecontainment spraypumpstopreventpumpdamageunderlow-flowconditions.

SC0UENT:'KCheckvalvesshallbeexercised atleastonceevery3months,except,asprovidedbyIWV-3522.

(IWV-3521) 0F'hereisnoflowrateinstrumentation available toverifyvalvefull-stroke exercising asrequiredbyReference 2.7,Position1~Duringthequarterly pumptest,thedischarge valveoftheContainment SprayPumpmustbeclosedtoprecludeawaterhammer.Withthisdischarge valveclosed,thesevalvescannotbestroketested.D-39 RELIEFREQUESTNO.VR-22(cont.)REVISION39/1/91ALTERNATE TESTING:Duringeachreactorrefueling outageatleastoneofthesevalveswillbedisassembled, inspected, andmanuallystrokedtoverifyoperability.

Inspections shallbescheduled suchthatvalveswillbecheckedinarotatingsequencesuchthateachvalveissubjecttoinspection atleastonceeverysix(6)years.Shouldavalveunderinspection befoundtobeinoperable, thentheothervalvewillbeinspected duringthesameoutage,afterwhichtherotational inspection schedulewillbere-initiated.

Following re-assembly, eachvalvewillbepartial-flow exercised toverifyoperability.

Thissatisfies therequirements ofGenericLetter89-04,Position2and,assuch,isconsidered tobeapproveduponsubmittal.

D-40

REVISION39/1/91RELIEFREQUESTNO.VR-23WITHDRAWN D-41 l

RELIEFREQUESTNO.VR-24REVISION39/1/91~SYSTHydrogenSamplingSystem(8770-G-092)

COMPONNTS:V-29305V-29306CGOY'NCON:Thesevalvesopentosupplynitrogenzerogasforoperation ofthecontainment hydrogenanalyzerandclosetopreventthelossof,gasfromtheaccumulator intheeventofde-pressurization oftheupstreampiping.NT:Valvesthatarenormallyopenduringplantoperation andwhosefunctionistoclosetopreventreversedflowshallbetestedinamannerthatprovesthedisktravelstotheseatpromptlyuponcessation orreversal'offlow.(IWV-3522(a))

Thesevalvesareinseries.forredundancy andactasonebarrierforreverseflowwithnomechanism toallowverification thatbothvalvesseat.Sincetheyareinseries,however,inordertoperformthesafetyfunctiononlyonevalveneedclose.Thesevalves'ill betestedsimultaneously inthecloseddirection toverifythatatleastonevalvecloses.Intheeventthatthebackflow(closure) testfailsindic'ating failureofbothvalvestoseat,bothvalveswillberepairedbeforereturning thesystemtoservice.D-42

REVISION39/1/91RELIEFREQUESTNO.VR-25~SYSEM:UltimateHeatSink(8770-G-093)

SB-37-1SB-37-2CATGORFUNCIOThesevalvesareopenedtoprovideasecondsourceofcoolingwaterfromBigMudCreek.CT0UIBSCategoryAandBvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyIWV-3412(a),

IWV-3415, andIWV-3416'IWV-3411)

ETheoperation ofthesevalvesislimitedforenvironmental concernstominimizethequantityofwaterdrawnfromtheIndianRiveranddischarged totheocean.ForthisreasontheFUSAR(Section9.2.7)specifies exercising thesevalvesatsix(6)monthintervals.

G'hesevalveswillbeexercised atleastonceeverysix(6)months.D-43

\'

RELIEFREQUESTNO.VR-26REVISION39/1/91SSTEM:Emergency DieselGenerator (8770-G-096, Sh1&2)a~ISE-59-1A&BCGORC0CONThesevalvesopentoprovideflowpaths fordieselfueloilintotherespective daytanksandclosetopreventdrainingofthemainstoragetankandoverflowofthedaytanks.REUEMNThestroketimeofallpoweroperatedvalvesshallbemeasured.

to.....,wheneversuchavalveisfull-stroke tested.(IWV-,3413(b))S0REFP&Lhasreviewedtheinstallation ofthesevalvesandithasbeendetermined thatthereisnopractical meansofaccurately determining thestroketimeasrequiredbyIWV-3413(a) forthesevalves.Theseare"totally" enclosedsolenoidvalveswithnoremoteorlocalpositionindicating capability andnovisibleaccesstoanyofthemovingpartsofthevalves.Compliance withtheCodetomeasuretheoperating stroketimesforthesevalveswouldrequirereplacement ofthesevalveswithvalveshavingasuitablealternative designwithappropriate positionindicating capability.

Sincethesevalveshavebeeninstalled andinoperation sinceplantstartupwithasatisfactory operating recordwefeelsystembackfittosatisfythisrequirement.

isunwarranted atthistime.Itisnotedthatthestroketimesofthesevalvesisnotcriticalfromtheaspectofaccidentmitigation.

D-44 REVISION39/1/91RELIEFREQUESTNO.VR-26(cont.)ALTERNAEESTIG:Duringquarterly pumptestingeachofthesevalveswillbeexercised andverifiedtooperatesatisfactorily.

Bylocalobservation, properoperation willbeconfirmed bytheabsenceofanyunusualaudiblenoiseorvibration andtheabilitytopassadequateflowfromthefueloiltransferpumps.Valvestroketimeswillnotbemeasured.

D-45 RELIEFREQUESTNO.VR-27REVISION39/1/91SYSTEM:Emergency DieselGenerator AirStartSystem(8770-G-096, Sh1&2)COONNTS:FCV-59-1A1 thruFCV-59-4A1 FCV-59-IB1 thruFCV-59-4B1 SE-59-3AthruSE-59-6A, SE-59-3BthruSE-59-6BCGOC0Thesevalvesopentosupplystartingairtotheemergency dieselgenerators.

UETThestroketimeofallpoweroperatedvalvesshallbemeasuredtothenearestsecond,...,wheneversuchavalveisfull-stroketested.(IWV-3413(b))

Thesevalvesareintegralwiththedieselairstartsystemforeachemergency dieselgenerator withnovalvepositionindication mechanism and,assuch,thereisnopractical methodformeasuring thestroketimesofeachindividual valve.Ifavalveweretofailtostrokeasrequireditwouldbereflected inanunacceptable startingtimefortherespective dieselgenerator.

Thesevalveswillbeexercised inconjunction withtestingoftheemergency dieselgenerators.

Thestroketimesoftheindividual valveswillnotbemeasuredbutthestartingtimeforeachdieselgenerator willbeverifiedtobeacceptable.

D-46 REVISION39/1/91RELIEFREQUESTNO.VR-28SYSTEM:ChemicalandVolumeControlSystem(8770-G-078, Sh121)COONENV-2443V-2444CTGO4T0Thesevalvesopentoprovideaflowpathfromtheboricacidmakeuppumpstotheemergency borationheader.Checkvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyIWV-3522.

(IWV-3521)

AS0Full-stroke testingthesevalvesrequiresoperating theboricacidmakeuppumpsatornearratedflowandverifying fullaccidentflowthrougheachvalve.Operating theBAMPumpsdischarging intothechargingpumpsuctionheaderrequirestheintroduction ofhighlyconcentrated boricacidsolutionfromtheboricacidmakeuptankstothesuctionofthechargingpumps.This,inturn,wouldresultintheadditionofexcessborontotheRCSwhichwouldadversely affectplantpowerlevelandoperational parameters withthepotential foranundesirable planttransient an/aplanttriporshutdown.

Duringcoldshutdown, theintroduction ofexcessquantities ofboricacidisundesirable fromtheaspectofmaintaining properplantchemistry andtheinherentdifficulties thatmaybeencountered duringthesubsequent startupduetoover-boration oftheRCS.Inadditiontotheabove,thereisnoflowratemeasurement instrumentation installed inthisflowpath.-

D-47 REVISION39/1/91RELIEFREQUESTNO.VR-28(cont.)LTETESTING:Asecondcircuitthatrecirculates watertotheRNThasflowratemeasuring instrumentation installed howeveritislimitedto30gpm(BAMPumpdesigncapacityis142gpm).Eachofthesevalveswillbepartialstrokeexercised quarterly.

Duringtestingoftheboricacidmakeuppumpsperformed duringeachreactorrefueling (SeeReliefRequestPR-5),systemflowratewillbemeasuredtoverifyfullstrokeofthesevalves.D-48 REVISION39/1/91RELIEFREQUESTNO.VR-29SYSTEM:SafetyInjection System(8770-G-078, Sh130)COMPONENTS:

V-3101V-3103CATEGORY:

FUNCTION:

Thesevalvesopentoprovideflowpaths fromthehigh-pressure safetyinjection pumpstotherefueling watertanktoprovideforminimumflowthroughtherespective pumpsin,theeventtheyareoperating underlowornoflowconditions.'hey closeduringshutdowncoolingandlong-term recirculation topreventrecirculation throughtheidlepump(s).SECTIONXREUIREMENT:

Checkvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyIWV-3522.

(IWV-3521)

BSISFORRELIEF:Thereisnoflowrateinstrumentation available toverifyvalvefull-stroke exercising asrequiredbyReference 2.7,Position1~Testingthesevalvestotheclosedpositionrequiresoneoftheminimumflowisolation valves(V-3659orwhichisolatesallminimumflowfromtheSIpumpsandtheminoperable.

ALTERNATE TESTING:closingV-3660)rendersDuringquarterly pumptestingeachofthesevalveswillbepartial-stroke exercised viarecirculation throughtheminimumflowtestcircuitswithnoflowmeasurements.

D-49

(

REVISION39/1/91RELIEFREQUESTNO.VR-29(cont.)ALTERNATE TESTING:Duringcoldshutdown, eachvalvewillbeverifiedtoclosesubjecttotheconditions ofReliefRequestVR-1.Duringeachreactorrefueling outageatleast,oneofthesevalveswillbedisassembled, inspected, andmanuallystrokedtoverifyoperability.

Inspections shallbescheduled suchthatvalveswillbecheckedinarotatingsequencesuchthateachvalveissubjecttoinspection atleastonceeverysix(6)years.Shouldavalveunder.inspection befoundtobeinoperable, thentheothervalveswillbeinspected duringthesameoutage,afterwhichtherotational inspection schedulewillbere-initiated.

Following re-assembly, eachvalvewillbepartial-flow exercised toverifyoperability.

Thissatisfies therequirements ofGenericLetter89-04,Position2.D-50

REVISION39/1/91RELIEFREQUESTNO.VR-30SYSTEM:SafetyInjection System(8770-G-078, Sh130)COMONENS:V-3104V-3105CAGO!FC0Thesevalvesopentoprovideflowpaths fromthelow-pressure.

safetyinjection pumpstotherefueling watertanktoprovideforminimumflowthroughtherespective pumpsintheeventtheyareoperating underlowornoflowconditions.

Theycloseduringshutdowncoolingandlong-term recirculation topreventrecirculation throughtheidlepump(s).SECIOUEMECheckvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyIWV-3522.

(IWV-3521)

S0Thereisnoflowrateinstrumentation available toverifyvalvefull-stroke exercising asrequiredbyReference 2.7,Position1~Testingthesevalvestotheclosedpositionrequiresclosingoneoftheminimumflowisolation valves(V-3659orV-3660)whichisolatesallminimumflowfromtheSIpumpsandrenderstheminoperable.

D-51 RELIEFREQUESTNO.VR-30(cont.)REVISION39/1/91ALTERNATE TESTING:Duringquarterly pumptestingeachofthesevalveswillbepartial-stroke exercised viarecirculation throughtheminimumflowtestcircuitswithnoflowmeasurements.

Duringcoldshutdown, eachvalvewillbeverifiedtoclosesubjecttotheconditions ofReliefRequestVR-1.Duringeachreactorrefueling outageatleastoneofthesevalveswillbedisassembled, inspected, andmanuallystrokedtoverifyoperability.

Inspections shallbescheduled suchthatvalveswillbecheckedinarotatingsequencesuchthateachvalveissubjecttoinspection atleastonceeverysix(6)years.Shouldavalveunderinspection befoundtobeinoperable, thentheothervalvewillbeinspected duringthesameoutage,afterwhichtherotational inspection schedulewillbere-initiated.

Following re-assembly, eachvalvewillbepartial-flow exercised toverifyoperability.

Thissatisfies therequirements ofGenericLetter89-04,Position2.D-52 REVISION39/1/91RELIEFREQUESTNO.VR-31SYSTEM:Feedwater System(8770-G-080, Sh3)COMPONNV-9303V-9304V-9305.V-12507CTEGOValvesV-9303throughV-9305opentoprovideflowpaths fromtheauxiliary feedwater pumpdischarge tothecondensate storagetanktoensureadequatepumpcoolingduringlowflowconditions.

V-12507openstoprovideadischarge flowpathforbearingcoolingwaterfromthesteam-driven auxiliary feedwater pump.0UT:-Checkvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyZWV-3522.

(IWV-3521)

BS0Thereisnoflowrateinstrumentation available toverifyvalvefull-stroke exercising ofthesevalvesasrequiredbyReference 2.7,Position1.Duringquarterly pumptestingeachofthesevalveswillbepartial-stroke exercised viarecirculation throughtheminimumflowtestcircuitswithnoflowmeasurements.

D-53 RELIEFREQUESTNO.VR-31(cont.)REVISION39/1/91ATERNAESG:Duringeachreactorrefueling outageatleastoneofthethreeminimumflowrecirculation valveswillbedisassembled, inspected, andmanuallystrokedtoverifyoperability.

Inspections shallbescheduled suchthatvalveswillbecheckedinarotatingsequencesuchthateachvalveissubjecttoinspection atleastonceeverysix(6)years.Shouldavalveunderinspection befoundtobeinoperable, thentheothertwovalveswillbeinspected duringthesameoutage,afterwhichtherotational inspection schedulewillbere-initiated.

Duringeach.reactorrefueling outageV-12507willbedisassembled, inspected, andmanuallystrokedtoverifyoperability.

Following re-assembly, eachvalve'ill bepartial-flow exercised toverifyoperability.

Thissatisfies therequirements ofGenericLetter89-04,Position2.D-54

RELIEFREQUESTNO.VR-32REVISION39/1/91SYSTEM:Miscellaneous Sampling(8770-G-092)

CO0ENV-27101V-27102CGORYA/CZIKZJZL'hese valvesclosetoprovideprimarycontainment.

UEMNT'heckvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyIWV-3522.

(IWV-3521)

SSThesearesimplecheckvalveswithnoexternalmeansofpositionindication, thustheonlypractical meansofverifyingclosureisbyperforming aleaktestorbackflowtest.Thiswouldrequireaconsiderable effort,including entryintothecontainment

building, whichisimpractical duringplantoperation andwouldbeanunreasonable burdenontheplantstafftoperformatcoldshutdown.

Atleastonceeverytwo(2)years,thesevalveswillbeverifiedtocloseinconjunction withtheAppendixJleaktestingprogram.D-55 0

RELIEFREQUESTNO.VR-33REVISION39/1/91WITHDRAWN D-56 0

RELIEFREQUESTNO.VR-34REVISION39/1/91SSTEM:PrimaryContainment COONNS:Valves6-inchesNPSandlargersubjecttoleakageratetestingper10CFR50,AppendixJ.CGOA/C(CheckValves)A(Motor-operated valves)CT0Eachofthesevalvesisdesignated asacontainment isolation valvemaintaining theleakrateintegrity oftheprimarycontainment inthecaseofanaccident.

0RUIENTheleakagerateforvalves6-inchesorgreatershallbeevaluated perSubsection IWV-3427(b).

(IWV-3521)

ORIF:Theusefulness ofapplyingthisrequirement doesnotjustifytheburdenofcompliance.

Thispositionissupported byNRCGenericLetter,Position10SG:Leakratetestresultsforvalves6-inchesorgreater(NPS)willbeevaluated perIWV-3426andIWV-3427(a) however,therequirement's ofIWV-3427(b) willnotbeapplied.Thissatisfies therequirements ofGenericLetter89-04,Position10'-57 a'

REVISION39/1/91RELIEFREQUESTNO.VR-35~SYSTIntakeCoolingWater(8770-6-082, Sh1)COMONENT:TCV-14-4A&BCEGOIThesevalvesopentoprovideflowpaths forintakecoolingwaterfromthecomponent coolingheatexchangers.

SCTIONIREUIREtCheckvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyIWV-3522.

(IWV-3521)

Thestroketimeofallpoweroperatedvalvesshallbemeasuredto.....,wheneversuchavalveisfull-stroke tested.(IWV-3413(b))SISORRELITheIntakeCoolingWater(ICW)Systemsuppliescoolingwater,inparallel, toboththeComponent CoolingWater(CCW)SystemandtheTurbineCoolingWater(TCW)Systemheatexchangers.

ThesetwovalvesregulatetheflowofICWthroughtheeachoftheCCWheatexchangers.

Whenthesevalvesareopened,theflowthroughtheCCWheatexchangers willincreasecausingtheflowthrough'the TCWheatexchangers todecrease.

DuetothehigherICWtemperatures presentduringthewarmermonthsoftheyear,anydecrease'n flowwouldcauseatemperature transient whiChcouldhaveasignificant affectontheTCWsystem.Therefore, thesevalvescanonlybecycledduringcoldshutdownwhentheTCWisnotrequired.

D-58

RELIEFREQUESTNO.VR-35(cont.)REVISION39/1/91BASISFORRELIEFcont.Thesevalvesareairoperated, springreturnvalvesthatfailtotheopenposition.

Theyareeachprovidedwithanactuatorthatpositions thevalvein'response toanairsignalinputfromitstemperature controller.

Inordertostrokeoneofthesevalvesandperformthefailsafetest,thevalve'sinstrument airisolation valvemustbeclosedandthevalve'sactuatordepressurized throughthemoistureseparator vent.Oncetheinstrument airisolation valvehasbeenclosed,theairpressure, willbegintodecrease.

Theventpathmustbemanuallyheldopenandisdependent uponthefingerpressureoftheoperator.

Theratethattheactuatorcanbedepressurized isdependent uponthetimeittakestoclosetheisolation valveandventofftheairpressure.

Asaresult,themeasurement ofthevalvestroketimewouldbesimplyan"estimate" andwouldnoteffectively reflectthecondition ofthesecontrolvalves.ATERNSG'hesevalveswillbeexercised andfailsafetestedduri'ngcoldshutdown.

Duringvalveexercising andfailsafetesting,theindividual performing thevalvestrokewillverifyproperoperation.

Valvestroketimeswillnot'emeasured.

D-59 REVISION39/1/91RELIEFREQUESTNO.VR-36~SYSTMainSteam(8770-G-079, Sh1)COMPONENT:

V-08448V-08492CGFCON:Thesevalvesopentoprovideflowpaths forsteamfromthesteamgenerators totheAFWpumpturbines.

TheyclosedintheeventofasteamleakupstreamoftheMSIV'stopreventtheuncontrolled blowdownofbothsteamgenerators intothecontainment.

NT:Checkvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyIWV-3522.

(IWV-3521)

S0Verifying closureofthesevalvesduringplantoperation atnormaloperating pressures wouldrequiredisolating theassociated steamgenerator fromthesteamsupplylinesandventingthepipingbetweentheclosedisolation valveandthecheckvalve.Itisconsidered tobeimprudent toisolatethesteamsupplytotheAFWpumpsduringoperation and,inaddition, itisundesirable to'subjectplantpersonnel tothehazardsassociated withventingthesteamlineattheseoperating copditions.

Likewise, reverseflow(closure) testingofthesevalveswouldnecessitate pressurizing thedownstream sidewithsteamfromtheothersteamgenerator andopeninganupstreamvent.Fromtheaspectofpersonnel safetyitisundesirable tosubjectplantpersonnel tothepotential hazardsassociated withventinglivesteamattheseoperating conditions.

D-60

REVISION39/1/91RELIEFREQUESTNO.VR-36(cont.)LTERNATEESTING:Duringeachreactorrefueloutagesatleastoneofthesevalveswillbedisassembled, inspected, andmanuallystrokedtoverifyoperability.

Following re-assembly, eachvalvewillbeexercised (fullorpartial-stroke) toverify'operability.

ThisagreeswithReference 2.7,Position2,and,assuch,isconsidered tobeapproveduponsubmittal.

D-61

RELIEFREQUESTNO.VR-37REVISION39/1/91~SYSTInstrument Air(8770-G-085, Sh2)COMPONV-18279V-18283CTGORCThesevalvesopentoprovideflowpaths forinstrument airtoinflatetheshieldbuildingmainhatchdoorseals.Theyclosetopreventthelossofairfrom.theassociated accumulators intheeventthattheplantairsystemde-pressurizes.

SEUCheckvalvesshallbeexercised atleastonceevery3months,exceptasprovidedbyIWV-3522.

(IWV-3521)

Verifying closureofthesevalvesrequiresisolation oftheinstrument airsupplytothecontainment and"breaking" theupstreamtubingtoverifyvalveclosureandleak-tight integrity.

This,inturn,effectively isolatesoperating airtocriticalcomponents inthecontainment buildingincluding thepressurizer sprayvalvesandCVCSletdownisolation valves.Thiscouldcausesevereplanttransients andaplanttrip.Failureintheclosedpositionwouldcauseaplantshutdown.

Duetothedifficulty ofperforming thistest,itisnotconsidered apractical requirement tobedoneduringeachcoldshutdownperiodsinceitwouldresultinanundueburdenontheplantstaff.SDuringeachreactorrefueling outageeachofthesevalveswillbeexercised toitsclosedpositionandverifiedtobeclosed.D-62 REVISION39/1/91RELIEFREQUESTNO.VR-38SYSTEM:Feedwater (8770-G-080, Sh3)COPONNT:V-09248V-09280CEGORC0Thesevalvesopentoprovidethenormalflowpaths forfeedwater makeuptothesteamgenerators (non-safety function).

Theyclosetoisolatethemainfeedwater systemfromtheAFWpumpflowpathtothesteamgenerators.

UENT:Checkvalvesshallbeexercised atleastonceevery3months,exceptasprovidedby'IWV-3522.

(IWV-3521)

EVerifying closureofthesevalvesduringplantoperation atnormaloperating pressures wouldrequiredisolating theassociated steamgenerator.

Thisisclearlynot.practical andwouldlikelyresultinanunacceptable planttransient.

Duringshutdownperiods,duetotheplantconfiguration, thereisnopractical waytoreverseflow(pressure) testthesevalvestoverifyclosure.NDuringeachreactorrefueloutagesatleastoneofthesevalveswillbedisassembled, inspected, andmanuallystrokedtoverifyoperability.

ThisagreeswithReference 2.7,Position2,and,assuch,isconsidered tobeapproveduponsubmittal.

D-63 AppendixEValveProgramColdShutdownJustification REVISION39/1/91AppendixE:COLDSHUTDOWNJUSTIFICATIONS Thisappendixisintendedtoprovidethejustification forperforming valveexercising onlyatcoldshutdownconditions aspermitted byIWV-3412(a),

3415and5322.Specifically includedinthiscategoryarethefollowing:

  • Avalvewhosefailureinapositionotherthanitsnormalpositioncouldjeopardize theimmediate safetyoftheplantorsystemcomponents;
  • Avalvewhosefailureinapositionotherthanitsnormalpositioncouldcausealltrainsofasafeguard systemtobeinoperable;
  • Avalvewhosefailureinapositionotherthanitsnormalpositionthatmightcauseatransient thatcouldleadtoaplanttrip;or*Whentestrequirements orconditions areprecluded bysystemoperation oraccess.Coldshutdowntestingisperformed underconditions outlinedinReliefRequestVR-1.77-G-07SV>>1402andV-1404Power-Operated ReliefValvesDuetothepotential impactoftheresulting transient shouldoneofthesevalvesopenprematurely orstickintheopenposition, itisconsidered imprudent tocyclethemduringplantoperation withthereactorcoolantsystempressurized.

V-1441thru.V-1446andV-1449ReactorCoolantSystemVentsThesevalvesareadministratively controlled inthekey-locked closedpositionwiththepowersupplydisconnected topreventinadvertent operation.

SincetheseaieClass1isolation valvesforthereactorcoolantsystem,failureofavalvetocloseorsignificant leakagefollowing closure=could resultinalossofcoolantinexcessofthelimitsimposedbyTechnical Specification 3.1.3leadingtoaplantshutdown.

REVISION39/1/91Furthermore, ifavalveweretofailopenorvalveindication failtoshowthevalvereturnedtothefullyclosedpositionfollowing exercising, prudentplantoperation wouldprobablylikelyresultinaplantshutdown.

Chemical&VolumeContol8770-G-078 Sh.'20MV-.02-02ChargingLineIsolation ValveClosingthisvalveduringoperation isolatesthechargingpumpsfromtheRCSandwouldresultinundesirable pressurizer leveltransients withthepotential foraplanttripandpotential damagetothechargingpumps.Ifthevalvefailedtoreopen,thenaexpedited plantshutdownwouldberequired.

SE-02-03andSE-02-04Auxiliary Pressurizer SprayValvesOpeningeitherofthesevalves(orfailureintheopenposition) duringplantoperation wouldcauseanRCSpressuretransient thatcouldpotentially adversely affectplantsafetya'ndleadtoaplanttrip.Inaddition, thepressurizer spraypipingwouldbesubjected toundesirable thermalshock.V-2431Auxiliary Pressurizer SprayCheckValveInordertotestthisvalve,eitherSE-02-03orSE-'02-04 mustbeopened.Openingeitherofthesevalves(orfailureintheopenposition) duringplantoperation wouldcauseanRCSpressuretransient thatcouldpotentially adversely affectplantsafetyand"leadtoaplanttrip.Inaddition, thepressurizer spraypipingwouldbesubjected toundesirable thermalshock.V-2515andV-2516LetdownLineIsolation ValvesClosingeitherofthesevalvesduringoperation isolatestheletdown,.line fromtheRCSand.wouldresultinundesirable pressurizer leveltransients withthepotential foraplanttrip.Ifavalvefailedtoreopen,thenaexpedited plantshutdownwouldberequired.

E-2

REVISION39/:/91V-2505andSE-01-01RCPControlBleedoffIsolation ValvesExercising eitherofthesevalvestotheclosedpositionwhenanyofthereactorcoolantpumps(RCP's)areinoperation wouldinterrupt flowfromtheRCPsealsandresultindamagetothepump(s).V-2501VolumeControlTankOutletValveClosingthisvalveduringoperation ofachargingpumpwouldisolatetheVCTfromthechargingpumpsuctionheaderdamaginganyoperating chargingpumpsandinterrupting theflowofchargingwaterflowtotheRCSwiththepotential ofRCStransients andplanttrip.V-2504RWTDischarge ValveOpeningthisvalveduringoperation wouldresultinin)ection ofRWTboratedwaterintothereactorcoolantsystem.Thiswould,inturn,resultinoverboration withanadversereactioninreactorpowerandthepotential forapowertransient.

SaoRes'duaeava770-G-078 S130V-3106andV-3107LPSIPumpDischarge CheckValvesDuringnormalplantoperation, theLPSIPumpscannotdevelopsufficient discharge pressuretopumpthroughthesevalvestotheRCSandexercisethemintheopendirection.

Theonlyothertestflowpathavailable isthroughtheshutdowncoolinglinerecirculating totheRWT.ThiswouldrequireopeningvalvesHCV-36'57, V-3460andV-3459.Withthesevalvesopen,bothtrainsoftheLPSIsubsystem wouldbeinoperable, thus,thistestingschemeisunacceptable.

E-3 V-3614,V-3624,V-3634.andV-3644SITankDischarge Isolation ValvesREVISION39/1/91Duringnormalplantoperation, thesevalvesareadministratively controlled tobelockedopenwiththeirbreakersrackedouttoensuretheyremainintheopenpositionwithnochanceofmisalignment.,

Exercising thesevalvespresentsthechanceofmisalignment, thusisnotconsidered tobeprudent.Furthermore, duringtheperiodoftimewhenavalveisnotfullyopen,theassociated SITankisnotavailable forsafetyinjection.

Thereisalsothepossibility ofcreatingalargedifferential pressureacrossthevalvewhileitisclosedthatwouldprecludereopening orcoulddamagethevalveduringoperation.

V-3659andV-3660MinimumFlow/Recirculation LineIsolation ValvesFailureofeitherofthesevalvesintheclosedpositionduringtestingwillrenderallunitsafetyinjection pumpsinoperable duetothehighprobability

'ofdamageshouldthesepumpsbestartedandoperatedwithoutsufficient flowforcoolingofpumpinternalcomponents.

V-3480,3481,3651,and3652ShutdownCoolingRCSIsolation ValvesThesevalvesareprovidedwithelectrical interlocks thatpreventopeningwheneverReactorCoolantSystempressureexceeds268psia.Thisprecludes exercising thesevalvesinanyotherplantcondition thancoldshutdown.

netoaetemov8770-G-078 Sh131HCV-3618, HCV-3628, HCV-3638, andHCV-3648CheckValve'eakageTestValvesThesevalvesareprovidedwithacontroller thatpositions thevalveinresponsetoavariableindicator-controller device.Inordertostrokethesevalvesandperformfailsafetests,fusesinthecontrolcircuitsare'removedwhich,inturn,causesthelossofvalvepositionindication.

Inaccordance withReliefRequestVR-33,duringthisexercising anindividual willbestationed atthevalvetoverifyproperE-4 REVlSION39/1/91operation.

Sincethisvalveislocatedinsidethecontainment buildingwithlimitedaccess,thisisnotpractical toperformduringplantoperation.

MaiSteam8770-G-079 SHCV-08-1A&BMainSteamIsolation ValvesDuringplantoperation atpower,closureofeitherofthesevalvesisnotpractical asitwouldrequireisolating asteamgenerator whichwouldresultinaseveretransient onthesteamandreactorsystemsandapossibleplanttrip.HCV-08-2A

&2BMainSteamline Atmospheric DumpValvesOpeningthesevalvesduringplantoperation atpowerwillresultinanundesirable powertransient withthepotential forexceeding reactorcorepowerlimitoraplanttrip.V-08448andV-08492Steam-Driven AFWPumpSteamSupplyCheckValvesFull-stroke exercising ofthesevalvestotheopenpositionwouldrequireoperation of1CAuxiliary Feedwater pumpandinjection ofcoldwater(85deg-F)intothehot(450deg-F)feedwater supplypiping.This,inturn,wouldresultinunacceptable thermalstressonthefeedwater systempipingcomponents.

wte770-G-03MV-09-07and08MainFeedwater Isolation ValvesDuringplantoperation atpower,closureofeitherofthesevalvesisnotpractical asitwouldrequireisolating asteamgenerator whichwouldresultinaseveretransient onthesteamandreactorsystemsandaplanttrip.E-5 REVISION39/1/91V-09248andV-09280MainFeedwater SupplyCheckValvesDuringplantoperation atpower,testingeitherofthesevalvestotheclosedpositionisnotpractical asitwouldrequireisolating asteamgenerator whichwouldresultinaseveretransient onthesteamandreactorsystemsandaplanttripeV-12174andV-12176Auxiliary Feedwater PumpSuctionCheckValvesFull-stroke exercising ofthesevalveswouldrequireoperation ofarelatedauxiliary feedwater pumpandinjection ofcoldwater(85deg-F)intothehot(450deg-F)feedwater supplypiping.This,inturn,wouldresultinunacceptable thermalstressonthefeedwater systempipingcomponents.

Thesevalveswillbepartialstroketestedduringquarterly testingviatheminimumflowrecirculation lines.V-9107,9123,and9139Auxili'ary Feedwater PumpDischarge CheckValvesFull-stroke exercising ofthesevalveswouldrequireoperation oftherelatedauxiliary feedwater pumpandinjection ofcoldwater(85deg-F)intothehot(450deg-F)feedwater supplypiping.This,inturn,wouldresultinunacceptable thermalstressonthefeedwater systempipingcomponents.

V-9119,9135,9151,and9157Auxiliary Feedwater SupplyCheckValvesFull-stroke exercising ofthesevalveswouldrequireoperation ofarelatedauxiliary feedwater pumpandinjection ofcoldwater(85deg-F)intothehot(450deg-F)feedwater supplypiping.This,inturn,wouldresultinunacceptable thermalstressonthefeedwater systempipingcomponents.

E-6 REVISION39/1/91IntakeCooinWater8770-G-082 Sh1MV-21-2&3TurbinePlantCoolingWaterHeatExchanger SupplyValvesIfduringtestingtotheclosedpositionundernormaloperating conditions eitherofthesevalvesweretofailclosedforanyextendedperiodoftime,theassociated turbinegenerator andvarioussupportcomponents couldbedamagedduetooverheating.

TCV-14-4A&BCCWTemperature ControlValvesFailureofeitherofthesevalvesintheclosedpositionduringplantoperation wouldadversely affectthecapability ofthevarioussafetysystemstoreacttoanaccidentandthusjeopardize plantsafety.Wate877-G-HCV-14-1,2,6

&7RCPCoolingWaterSupply/Return Isolation ValvesThesevalvesarerequiredtobeopentoensurecontinued coolingofreactorcoolantpumpauxiliary components andthecontrolroddrives.Closinganyofthesevalvesduringplantoperation wouldresultinsevereRCPandCRDdamageleadingtoplantoperation inapotentially unsafemodeandasubsequent plantshutdown.

HCV-14-3A&BShutdownHeatExchanger ReturnValvesTestingeitherofthesevalvesduringplantoperation wouldresultinanunbalanced flowcondition intheaffectedCCW'trainandde'creased flowtoessential equipment.

Thiscouldresultincomponent damageoranundesirable planttransient.

E-7 EUC REVISION39/1/91MV-14-5thruMV-14-8containment CoolerSupplyValvesFailureofanyoneofthesevalvesintheclosedpositionrenderstwocontainment coolersinoperable resulting inplacingtheplantina45minuteLCOwhichallowslittletimeforcorrecting theapparentproblembeforecommencing theshutdown.

eat'770-G-878 Cod't'o'nAVet't'o&'ondit'onin FCV-25-1thruFCV-25-6PrimaryContainment PurgeandVentValvesThesevalvesareadministratively maintained intheclosedpositionatalltimeswhentheplantisoperating inModes1,2or3thustheyarenotrequiredtooperate(close)duringoperational periods.Duetothelargesizeofthesevalvesandthepotential fordamageasaresultoffrequentcycling,itisnotprudenttooperatethemmorethanisabsolutely necessary.

V-25-20andV-25-21Containment VacuumBreakersThesevalvescanonlybeexercised manuallyrequiring directaccesstoeachvalve.Sincethesevalvesarelocatedwithinthecontainment

building, accessislimitedandnotroutinely practical.