Proposed Tech Specs Section 6.2.2.f,revised to Allow for Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plants Operating Crews
ML17229A751
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 05/27/1998
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17229A750 List:
References
NUDOCS 9806030228
Download: ML17229A751 (5)


Text

L-98-130 Page 1

ATTACEiMENT3 Pro sedChan es-Tech'nicalS ecification6.2.2.f.

St. Lucie Unit 1 Technical Specification page 6-5 St. Lucie Unit 2 Technical Specification page 6-2 980b030228 980527 PDR ADQCK 05000335 P,

PDR

6.0 ADMINISTRATIVECONTROLS 4S6 l

I 1

~

~Ln

~n~

H Administrative procedures shall be developed and implemented to limit the working hours of unit staff who perform safety-related functions; e.g., senior reactor operators, reactor operators, health physici ux y operators, and key maintenance personnel.

p5 adequate shi coverage maintained without routine heavy

~ use of overtim

. -Th

.H.'h ttht 1'

ht require substantial amounts of overtime to be used, or during extended periods of shutdown for refueling, major maintenance or major plant modification, on a temporary basis the following guidelines shall be followed:

l.

An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> straight, excluding shift turnover time.

2.

An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24-hour period, nor more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48-hour period, nor more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any.7-day period, all excluding shift turnover time.

3.

A break of't least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be allowed between work periods, including shift turnover time.

4.

Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift.

1 Any deviation from the above guidelines shall be authorized by the Plant General Manager or his deputy, or higher levels of management, in accordance with established procedures and with documentation of the basis for granting the deviation. Contr'ols shall be included in the procedures such that individ-ual overtime shall be reviewed monthly by the Plant General Manager or his designee to assure that excessive hours have not been assigned.

Routine deviation from the above guidelines is not authorized.

g.

The Operations Supervisor shall hold a Senior Reactor Operator license.

SHIFT TECHNICAL ADVISOR 6.2.3 The Shift Technical Advisor function is to provide on shift advisory technical support in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to the safe operation of the unit.

ST.

LUCIE - UNIT 1 6-5 Amendment No. ~9 BS,126

0 fg

(Continued) 6.2.2 The unit organization shall be subject to the following:

a.

Each on duty shift shall be composed of at least 'the minimum shift crew composition shown'n Table 6.2-1.

b.

At least one licensed Reactor Operator shall be in the control room when fuel is in the reactor.

In addition, while the reactor is in MODE 1, 2, 3, or 4, at least one licensed Senior Reactor Operator shall be in the control room.

c.

A health physics technician'hall be on site when fuel is in the reactor.

d.

Either a licensed SRO or licensed SRO limited to fuel handling who has no concurrent responsibilities during this operation shall be present during fuel handling and shall directly supervise all CORE ALTERATIONS.

e.

ELETED f.

Adminis t~e procedures shall be developed and implemented to limitthe working hours b it staff who perform safety-related functions e.g., senior reactor operators, re t r operators, health physicists, auxilia operators, and key maintenance personne.

dequat shift coverage shalHie maintained without routine hea use of overtimg.

r-weeIHvh'owever, in the event that unforeseen p

blems require substantial amounts of overtime to be used, or during extended riods of shutdown for refueling, major maintenance or major plant modifica 'on, on a tern ry-basis-t following guidelines shall be followed:

i,Lu

< <~gLr. ~cdi ~

s u~

~l(iJ 4~&

fl n4

¹ The health physics technician may be less than the minimum requirement for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to accommodate unexpected absence, provided immediate action is taken to fillthe required positions.

ST. LUCIE-UNIT2 Amendment No. 99, 55.~5

\\