ML17325B563

From kanterella
Revision as of 09:14, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227
ML17325B563
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/22/1999
From: POWERS R P
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17325B564 List:
References
AEP:NRC:1295B, NUDOCS 9904300149
Download: ML17325B563 (4)


Text

CATEGORYj.REGULA'1YINFORMATION'IGTRIBUTIO

>>SYSTEM,(RIDS)i~1ACCESSION NBR:9904300149 DOC.DATE:

99/04/22NOTARIZED:

NODOCKET¹FACIL:50-315 DonaldC.CookNuclearPowerPlant,Unit1,IndianaM05000315AUTH.N2Q)E AUTHORAFFILIATION POWERS;k'.4!.

IndianaMichiganPowerCo.RE(IP.NAME RECIPIENT AFFILIATION RecordsManagement Branch(Document ControlDesk)

SUBJECT:

Forwardsresultsofindependent chemicalevaluations performed fromSept1997throughFeb1999,reresolution ofissuesrelatedtolicenseamend227.DISTRIBUTION CODE:A001DCOPIESRECEIVED:LTR

)ENCL'iSIZE:5+2TITLE:ORSubmittal:

GeneralDistribution NOTES:ATERECIPIENT

,IDCODE/NAME LPD3-1LASTANG,JINTERNAFILECENTER1NRR/DSSA/SRXB NUDOCS-ABSTRACT EXTERNAL:

NOACCOPIESLTTRENCL111'111111111RECIPIENT IDCODE/NAME LPD3-1PDNRR/DE/EMCB NRR/DSSA/SPLB NRR/SPSBJUNG,IOGC/HDS3NRCPDRCOPIESLTTRENCL111111111011GDNNOTETOALL"RZDS"RECIPIENTS:

PLEASEHELPUSTOREDUCEWASTETHTOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:

LTTR13ENCL12 IndianaMichiganPowerCompany500CircleDriveBuchanan, Ml491071373 IN91ANA&IfCHl6ANPQWMApril22,1999DocketNo.50-315AEP:NRC:1295B U.S.NuclearRegulatory Commission ATTN:DocumentControlDeskMailStop:0-Pl-17Washington, DC20555-0001 Reference 1:LetterAEP:NRC:1295D fromR.P.PowerstotheNuclearRegulatory Commission DatedFebruary20,1999.Reference 2:LetterJ.F.StangtoR.P.Powers,DonaldC.CookNuclearPlant,Unit1-IssuanceofAmendment RE:SteamGenerator Surveillance Extension (TACNO.MA3562)DatedDecember30,1998.DonaldC.CookNuclearPlantUnit1RESOLUTION OFISSUESRELATEDTOLICENSEAMENDMENT 227OnFebruary20,1999,IndianaMichiganPowerCompany(1&M)informedtheNRC(Reference 1)ofouractionplacingtheimplementation ofLicenseAmendment 227,DeferralofSteamGenerator.

EddyCurrentTesting,onhold.Theimplementation oftheamendment, wasdelayedtoresolveconcernsrelatedtoadherence toElectricPowerResearchInstitute (EPRI)chemistry guidelines whilethesteamgenerators wereinwetlay-up.Anindependent reviewofthechemistry conditions duringthecurrentunit1shutdownperiodfoundthatwhileminorfluctuations insteamgenerator waterchemistry

occurred, adequatecorrosion protection wasmaintained.

Whenfluctuations weredetected, chemistry parameters wererestoredtogoalvaluesinaccordance withplantprocedures andtheEPRIguidelines.

Thisconclusion wasdiscussed withNRCmanagement andstaffonMarch25,1999atD.C.CookNuclearPlant(CNP).Attachments 1and2containtheresultsoftheindependent chemistry evaluations performed fromSeptember 1997throughFebruary1999.Additionally, attachment 1containsrecommendations bytheindependent evaluator.

Theserecommendations havebeenenteredintoourcorrective actionprogramandwillbedispositioned aspartoftheCNPrestart.Asaresultoftheinvestigation oftheoriginalconcernunderthecorrective actionprogram,wehaveidentified weaknesses inoursubmittal preparation andvalidation processaswellasourownlicenseamendment implementation process.Revisionoftheprocedures thatsupporttheaboveprocesses isapriority.

Intheinterim,wehaveinstituted stringent controlsonsubmittals

d49904300%4'P 9'70422PDRADQCK0500031.5 PPDR U.S.NuclearRegulatory Commission Page2AEP:NRC:1295B ofalltypeswhilewereviseourprocedures andretrainpersonnel.

LicenseAmendment 227wasimplemented onApril5,1999.Ifyouhaveanyfurtherquestions regarding thisissue,pleasecontactDavidF.Kunsemiller, DirectorRegulatory Affairsat616-466-2405.

Sincerely, R.P.PowersVicePresident Attachments A.C.BakkenIIIJ.E.DyerMDEQ-DW&RPDNRCResidentInspector M.W.RencheckR.Whale ATTACHMENT 1TOAEP:NRC:1295B UNIT1STEAMGENERATOR LAYUPCHEMISTRY OUTOFSPECIFICATION DURINGSEPTEMBER 24,1997TODECEMBER31,1997