2016/03/31 NRR E-mail Capture - Draft Request for Additional Information - License Amendment Request to Adopt TSTF-426 - CAC No. MF7213
ML16109A007
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/31/2016
From: Andrea George
Plant Licensing Branch IV
To: Clark R W
Entergy Corp
References
MF7213
Download: ML16109A007 (3)


Text

1NRR-PMDAPEm ResourceFrom:George, AndreaSent:Thursday, March 31, 2016 2:32 PMTo:BICE, DAVID B (ANO)Cc:CLARK, ROBERT W

Subject:

DRAFT Request for Additional Information - License Amendment Request to Adopt TSTF-426 - CAC No. MF7213Attachments:MF7213 - Draft RAI.docxImportance:HighMr. Bice, By letter dated December 22, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15356A657), Entergy Operations, Inc. (the licensee), submitted a license amendment request (LAR) to adopt Technical Specification (TS) change traveler (TSTF)-426, "Revise or Add Actions to Preclude Entry into LCO 3.0.3 - RITSTF Initiatives 6b & 6," Revision 5, at Arkansas Nuclear One, Unit 2 (ANO-2). The proposed change would provide a short Allowable Outage Time to restore an inoperable system for conditions under which the current ANO-2 TSs would require a plant shutdown.

In the course of its review, the U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is required in order to complete its evaluation. The draft request for additional information (RAI) is attached to this email. Please review the RAI and let me know if a clarification call is needed by April 6, 2016. If a call is needed, provide some days/times when your staff is available. Please confirm receipt of this email.

Sincerely, Andrea George Project Manager U.S. Nuclear Regulatory Commission Division of Operating Reactor Licensing andrea.george@nrc.gov 301-415-1081 Hearing Identifier: NRR_PMDA Email Number: 2784 Mail Envelope Properties (Andrea.George@nrc.gov20160331143200)

Subject:

DRAFT Request for Additional Information - License Amendment Request to Adopt TSTF-426 - CAC No. MF7213 Sent Date: 3/31/2016 2:32:13 PM Received Date: 3/31/2016 2:32:00 PM From: George, Andrea Created By: Andrea.George@nrc.gov Recipients: "CLARK, ROBERT W" <RCLARK@entergy.com> Tracking Status: None "BICE, DAVID B (ANO)" <DBICE@entergy.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 1293 3/31/2016 2:32:00 PM MF7213 - Draft RAI.docx 22795 Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:

DRAFT REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO ADOPT TSTF-426 ENTERGY OPERATIONS, INC. ARKANSAS NUCLEAR ONE, UNIT 1 DOCKET NO. 50-313 By letter dated December 22, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15356A657), Entergy Operations, Inc. (Entergy, the licensee) submitted a license amendment request (LAR) to adopt Technical Specification (TS) change traveler (TSTF)-426, "Revise or Add Actions to Preclude Entry into [Limiting Condition for Operation] LCO 3.0.3 - RITSTF Initiatives 6b & 6c," Revision 5, for Arkansas Nuclear One, Unit 2 (ANO-2). The proposed change would provide a short Allowable Outage Time to restore an inoperable system for conditions under which the current ANO-2 TSs would require a plant shutdown. In order for the U.S. Nuclear Regulatory Commission (NRC) staff to complete its review of the LAR, additional information is requested which is detailed below.

REGULATORY BASIS Title 10 of the Code of Federal Regulations (10 CFR) Part 50.36(c)(2)(i) states the following, in part:

Limiting conditions for operation are the lowest functional capability or performance levels of equipment required for safe operation of the facility. When a limiting condition for operation of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the technical specifications until the condition can be met.

REQUEST FOR ADDITIONAL INFORMATION In the LAR dated December 22, 2015, the licensee requests to modify TS LCO 3.6.2.1, "Containment Spray System," in accordance with TSTF-426, according to the variation from the TSTF described in "Variation 2 - Containment Spray" in Section 2.2 of the LAR. The LAR states that the ANO-2 TSs diverge from the Standard TSs (STS) in that the Containment Spray System and Containment Cooling System each have their own TSs, as opposed to being combined in the STS. However, the LAR does not explain how the proposed changes to TS LCO 3.6.2.1 may affect TS LCO 3.6.2.3, "Containment Cooling System." Since the requirements of containment spray and containment cooling are separate in the ANO-2 TSs, it is unclear to the NRC staff how the TSs, as modified, would ensure containment pressure and temperature control is available during all the Modes of Applicability. Please explain how the proposed changes to TS LCO 3.6.2.1, along with the current (unchanged) TS LCO 3.6.2.3 ensure containment pressure and temperature control is available during all the Modes of Applicability.

1NRR-PMDAPEm ResourceFrom:George, AndreaSent:Thursday, March 31, 2016 2:32 PMTo:BICE, DAVID B (ANO)Cc:CLARK, ROBERT W

Subject:

DRAFT Request for Additional Information - License Amendment Request to Adopt TSTF-426 - CAC No. MF7213Attachments:MF7213 - Draft RAI.docxImportance:HighMr. Bice, By letter dated December 22, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15356A657), Entergy Operations, Inc. (the licensee), submitted a license amendment request (LAR) to adopt Technical Specification (TS) change traveler (TSTF)-426, "Revise or Add Actions to Preclude Entry into LCO 3.0.3 - RITSTF Initiatives 6b & 6," Revision 5, at Arkansas Nuclear One, Unit 2 (ANO-2). The proposed change would provide a short Allowable Outage Time to restore an inoperable system for conditions under which the current ANO-2 TSs would require a plant shutdown.

In the course of its review, the U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is required in order to complete its evaluation. The draft request for additional information (RAI) is attached to this email. Please review the RAI and let me know if a clarification call is needed by April 6, 2016. If a call is needed, provide some days/times when your staff is available. Please confirm receipt of this email.

Sincerely, Andrea George Project Manager U.S. Nuclear Regulatory Commission Division of Operating Reactor Licensing andrea.george@nrc.gov 301-415-1081 Hearing Identifier: NRR_PMDA Email Number: 2784 Mail Envelope Properties (Andrea.George@nrc.gov20160331143200)

Subject:

DRAFT Request for Additional Information - License Amendment Request to Adopt TSTF-426 - CAC No. MF7213 Sent Date: 3/31/2016 2:32:13 PM Received Date: 3/31/2016 2:32:00 PM From: George, Andrea Created By: Andrea.George@nrc.gov Recipients: "CLARK, ROBERT W" <RCLARK@entergy.com> Tracking Status: None "BICE, DAVID B (ANO)" <DBICE@entergy.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 1293 3/31/2016 2:32:00 PM MF7213 - Draft RAI.docx 22795 Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:

DRAFT REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO ADOPT TSTF-426 ENTERGY OPERATIONS, INC. ARKANSAS NUCLEAR ONE, UNIT 1 DOCKET NO. 50-313 By letter dated December 22, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15356A657), Entergy Operations, Inc. (Entergy, the licensee) submitted a license amendment request (LAR) to adopt Technical Specification (TS) change traveler (TSTF)-426, "Revise or Add Actions to Preclude Entry into [Limiting Condition for Operation] LCO 3.0.3 - RITSTF Initiatives 6b & 6c," Revision 5, for Arkansas Nuclear One, Unit 2 (ANO-2). The proposed change would provide a short Allowable Outage Time to restore an inoperable system for conditions under which the current ANO-2 TSs would require a plant shutdown. In order for the U.S. Nuclear Regulatory Commission (NRC) staff to complete its review of the LAR, additional information is requested which is detailed below.

REGULATORY BASIS Title 10 of the Code of Federal Regulations (10 CFR) Part 50.36(c)(2)(i) states the following, in part:

Limiting conditions for operation are the lowest functional capability or performance levels of equipment required for safe operation of the facility. When a limiting condition for operation of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the technical specifications until the condition can be met.

REQUEST FOR ADDITIONAL INFORMATION In the LAR dated December 22, 2015, the licensee requests to modify TS LCO 3.6.2.1, "Containment Spray System," in accordance with TSTF-426, according to the variation from the TSTF described in "Variation 2 - Containment Spray" in Section 2.2 of the LAR. The LAR states that the ANO-2 TSs diverge from the Standard TSs (STS) in that the Containment Spray System and Containment Cooling System each have their own TSs, as opposed to being combined in the STS. However, the LAR does not explain how the proposed changes to TS LCO 3.6.2.1 may affect TS LCO 3.6.2.3, "Containment Cooling System." Since the requirements of containment spray and containment cooling are separate in the ANO-2 TSs, it is unclear to the NRC staff how the TSs, as modified, would ensure containment pressure and temperature control is available during all the Modes of Applicability. Please explain how the proposed changes to TS LCO 3.6.2.1, along with the current (unchanged) TS LCO 3.6.2.3 ensure containment pressure and temperature control is available during all the Modes of Applicability.