Diablo Canyon Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedures Update
ML17047A544
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/16/2017
From: Ginn M A
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
DCL-17 -012, DIL-17-002
Download: ML17047A544 (8)


Text

Pacific Gas and Electric February 16, 2017 f>G&E Letter DCL-17 -012 PG&E Letter DIL-17-002 Michael A. Ginn Manager Emergency Planning lliablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 805.545.6300 Internal: 691.6300 Fax: 805.545.6265 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 10 CFR 50.54, 10 CFR 72.32 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Docket No. 72-26, Materials License No. SNM-2511 I Diablo Canyon Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedures Update

Dear Commissioners and Staff:

In accordance with 10 CFR 50.54 and the requirements of 10 CFR 72.32, Pacific Gas and Electric Company (PG&E) is providing a summary of the analysis of changes to Emergency Plan (E-Pian) Implementing Procedure EP EF-2, "Activation and Operation of the Operational Support Center," and EP G-4, "Assembly and Accountability." The associated enclosures are listed below:

  • Enclosure 2 -Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP EF-2, Revision 40, "Activation and Operation of the Operational Support Center"
  • Enclosure 3 -Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP G-4, Revision 30, "Assembly and Accountability" PG&E evaluated the changes for a reduction in effectiveness, as defined in 10 CFR 50.54(q), and concluded that the changes do not reduce the effectiveness of the E-Pian. The E-Pian continues to meet the requirements in Appendix E to 10 CFR Part 50 and the planning standards of 10 CFR 50.47(b). Therefore, PG&E A member of the STARS Alliance Callaway
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek Document Control Desk February 16, 2017 Page 2 PG&E Letter DCL-17-012 PG&E Letter DIL-17-002 concluded that prior NRC approval of the associated changes would not be required. This update does not contain any privacy or proprietary information in accordance with NRC Generic Letter 81-27, "Privacy and Proprietary Material in Emergency Plans." PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter. If there are questions regarding this update, please contact me at (805) 545-3446. Sincerely, Michael A. Ginn Emergency Planning Manager bnsm/4540/50891312/50891257 Enclosures cc/enc: John M. Goshen, P.E., NMSS Project Manager Kriss M. Kennedy, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Balwant K. Singal, NRC Senior Project Manager Senior Emergency Preparedness Inspector (RGN-IV/DR) A member of the STARS Alliance Callaway
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek PG&E Letter DCL-17-012 PG&E Letter DIL-17-002 DIABLO CANYON POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES Revision Numbers for Emergency Plan Implementing Procedures Proc. No. OM10.1D1 OM10.DC1 EP G-1 EP G-2 EP G-3 EP G-4* EP G-5 EP OR-3 EP RB-1 EP RB-2 EP RB-3 EP RB-4 EP RB-5 EP RB-8 EP RB-9 EP RB-10 EP RB-11 EP RB-12 EP RB-14 EP RB-14A EP RB-15 EP RB-16 EP R-2 EP R-3 EP R-7 EP EF-1 EP EF-2* EP EF-3 EP EF-4 EP EF-9 EP EF-10 EP EF-11 Enclosure 1 PG&E Letter DCL-17-012 PG&E Letter DIL-17-002 DIABLO CANYON POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES Rev. 15 8 44 50 59 30 14 10 8 8 7 5 8 27 15 19 14 11 9 2 15 14 34 9 17 53 40 44 20 12 17 2 Title Maintaining Emergency Preparedness Emergency Preparedness Drills and Exercises Emergency Classification and Emergency Plan Activation Interim Emergency Response Organization Emergency Notification of Off-Site Agencies Assembly and Accountability Evacuation of Non-Essential Site Personnel Emergency Recovery Personnel Dosimetry Emergency Exposure Guides Stable Iodine Thyroid Blocking Access to and Establishment of Controlled Areas Under Emergency Conditions Alternate Personnel Decontamination Facilities Instructions for Field Monitoring Teams Calculation of Release Rate Protective Action Recommendations Emergency Offsite Dose Calculations Plant Vent Iodine and Particulate Sampling During Accident Conditions Core Damage Assessment Procedure Initial Detection of Fuel Cladding Damage Post Accident Sampling System Operating Instructions for the EARS Computer Program Release of Airborne Radioactive Materials Initial Assessment Release of Radioactive Liquids Off-Site Transportation Accidents Activation and Operation of the Technical Support Center Activation and Operation of the Operational Support Center Activation and Operation of the Emergency Operations Facility Activation of the Off-Site Emergency Laboratory Backup .Emergency Response Facilities Activation and Operation of the Joint Information Center Alternate Emergency Response Facilities I Incident Command Post (ICP) *Revised Document Page 1 of 1 PG&E Letter DCL-17-012 PG&E Letter DIL-17-002 Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP EF-2, Revision 40 "Activation and Operation of the Operational Support Center" PG&E Letter DCL-17-012 PG&E Letter DIL-17-002 Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP EF-2, Revision 40 Original Content Content Change Reason for Change Process change with no change of intent. Attachment 5 Step 3.c moved Attachment 5 Step 3.c to 3.d and step 3.c is inserted !E.Jhe potential for airborne contamination During an event like the one during the as new content. November 2, 2016, Evaluated Exercise, it exists where teams are performing work, should be an expected action to perform air and time considerations and radiological sampling in areas around the plant to quantify conditions permit air sampling, the airborne impacts of the release. This THEN obtain air samples. information is important for worker protection and for helping to inform additional actions that may be needed to ensure the damage repair teams are correctly briefed. 1 of 1 Summary of the Analysis of Changes to Enclosure 3 PG&E Letter DCL-17-012 PG&E Letter DIL-17-002 Emergency Plan Implementing Procedure EP G-4, Revision 30 "Assembly and Accountability" PG&E Letter DCL-17-012 PG&E Letter DIL-17-002 Summary of the Analysis of Changes to Emergency Plan Implementing Procedure EP G-4, Revision 30 Original Content Content Change Reason for Change Step 2.2.4.a is inserted as new Step 2.2.4.a Administrative change with no change of content. intent. a. Facsimile of form should include the following:
  • Location The requirements of the provision to use a
  • Time facsimile of the Accountability Roster form (69-* Names of individuals 13231) should be clarified.
  • Keycard numbers Create new step 2.2.4.a as follows: a. Facsimile of form should include the following: *location *time *names of individuals *keycard numbers 1 of 1