Text

N' I Pacific Gas and Electric Company Diablo Canyon Power Plant P0 Box 56 Avila Beach. CA 93424 October 14, 2002 800545 6000 PG&E Letter DCL-02-122 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Emer-gency Plan Implementing Procedure Update

Dear Commissioners and Staff:

In accordance with Section V, "Implementing Procedures," of 10 CFR 50, Appendix E, enclosed is an update to the emergency plan (EP) implementing procedures for Diablo Canyon Power Plant, Units 1 and 2.

As provided under 10 CFR 50.54(q), the changes have been made without prior NRC approval since they do not decrease the effectiveness of the EP. The EP, as changed, continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E.

This update contains privacy/proprietary information that has been bracketed in accordance with NRC Generic Letter 81-27.

If there are any questions regarding this update, please contact Mr. Mark Lemke of my staff at\\(805) 545-4787.

Grant C. Gillies Director, Site Services bafi1 345 Enclosures cc:

David L. Proulx Girija S. Shukla cclenc: Ellis W. Merschoff (2) yU45 A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway e Comanche Peak

  • Diablo Canyon a Palo Verde 9 South Texas Project
  • WoLf Creek PG&E Letter DCL-02-122 LOCATION OF PRIVACY/PROPRIETARY INFORMATION IN EMERGENCY PLAN IMPLEMENTING PROCEDURES FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 Privacy/

Procedure Proprietary Number Information Title/Location of Privacy/Proprietary Information EP G-3 Yes Notification of Off-Site Agencies and Emergency Rev. 39 Response Organization Personnel.1 Page 1 of 4.2 Page 2 of 2.3 Page 1 of 1 EP G-4 Yes Assembly and Accountability Rev. 19 Page 6 of 8.2 Page 1 of 1 EP RB-8 Yes Instructions for Field Monitoring Teams Rev. 16.2 Page 1 of 3.2 Page 2 of 3.2 Page 3 of 3.4 Page 1 of 1.5 Page 1 of 1.6 Page 1 of 1 "PG&E Letter DCL-02-122 DIABLO CANYON POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES Table of Contents - Emergency Plan Implementing Procedures Volume 1A (OM10.1D3 only), Volume 1B (OM10.DC1 only), and Volume 3B Rev.

Title OM10.1D3 OMI0.DCI EP G-1 EP G-2 EP G-3*

EP G-4*

EP G-5 EP R-2 EP R-3 EP R-7 EP OR-3 EP RB-1 EP RB-2 EP RB-3 EP RB-4 EP RB-5 EP RB-8*

EP RB-9 EP RB-10 EP RB-1I EP RB-12 EP RB-14 EP RB-15 EP EF-1 EP EF-2 EP EF-3 EP EF-4 EP EF-9 EP EF-10

  • Procedure included in this submittal Proc.,No.

6 Emergency Plan Training 2

Emergency Preparedness Drills and Exercises 31 Emergency Classification and Emergency Plan Activation 25 Activation and Operation of the Interim Site Emergency Organization (Control Room) 39 Notification of Off-Site Agencies and Emergency Response Organization Personnel 19 Personnel Assembly, Accountability and Site Access Control During Emergencies 9A Evacuation of Nonessential Site Personnel 20 Release of Airborne Radioactive Materials Initial Assessment 8C Release of Radioactive Liquids 13 Off-Site Transportation Accidents 6A Emergency Recovery 5B Personnel Dosimetry 4B Emergency Exposure Guides 4

Stable Iodine Thyroid Blocking 4A Access to and Establishment of Controlled Areas Under Emergency Conditions 4C Personnel Decontamination 16 Instructions for Field Monitoring Teams 11 Calculation of Release Rate 8

Protective Action Recommendations 12 Emergency Offsite Dose Calculations 6

Plant Vent Iodine and Particulate Sampling During Accident Conditions 7

Core Damage Assessment Procedure 11 Post Accident Sampling System 29 Activation and Operation of the Technical Support Center 26 Activation and Operation of the Operational Support Center 22 Activation and Operation of the Emergency Operations Facility 14 Activation of the Off-Site Emergency Laboratory 8

Backup Emergency Response Facilities 5

Joint Media Center Activation and Operation