DCL-02-122, Emergency Plan Implementing Procedure Update

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementing Procedure Update
ML023020589
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/14/2002
From: Gillies G
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
DCL-02-122
Download: ML023020589 (3)


Text

N' I Electric Company PacificGas and Diablo Canyon Power Plant P0 Box 56 Avila Beach. CA 93424 October 14, 2002 800545 6000 PG&E Letter DCL-02-122 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Emer-gency Plan Implementing Procedure Update

Dear Commissioners and Staff:

In accordance with Section V, "Implementing Procedures," of 10 CFR 50, Appendix E, enclosed is an update to the emergency plan (EP) implementing procedures for Diablo Canyon Power Plant, Units 1 and 2.

As provided under 10 CFR 50.54(q), the changes have been made without prior NRC approval since they do not decrease the effectiveness of the EP. The EP, as changed, continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E.

This update contains privacy/proprietary information that has been bracketed in accordance with NRC Generic Letter 81-27.

If there are any questions regarding this update, please contact Mr. Mark Lemke of my staff at\(805) 545-4787.

Grant C. Gillies Director,Site Services bafi1 345 Enclosures cc: David L. Proulx Girija S. Shukla cclenc: Ellis W. Merschoff (2) yU45 A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway e Comanche Peak

  • Diablo Canyon a Palo Verde 9 South Texas Project
  • WoLf Creek

Enclosure 1 PG&E Letter DCL-02-122 LOCATION OF PRIVACY/PROPRIETARY INFORMATION IN EMERGENCY PLAN IMPLEMENTING PROCEDURES FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 Privacy/

Procedure Proprietary Number Information Title/Location of Privacy/Proprietary Information EP G-3 Yes Notification of Off-Site Agencies and Emergency Rev. 39 Response Organization Personnel Attachment 7.1 Page 1 of 4 Attachment 7.2 Page 2 of 2 Attachment 7.3 Page 1 of 1 EP G-4 Yes Assembly and Accountability Rev. 19 Page 6 of 8 Attachment 7.2 Page 1 of 1 EP RB-8 Yes Instructions for Field Monitoring Teams Rev. 16 Attachment 7.2 Page 1 of 3 Attachment 7.2 Page 2 of 3 Attachment 7.2 Page 3 of 3 Attachment 7.4 Page 1 of 1 Attachment 7.5 Page 1 of 1 Attachment 7.6 Page 1 of 1

Enclosure 2 "PG&ELetter DCL-02-122 DIABLO CANYON POWER PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES Table of Contents - Emergency Plan Implementing Procedures Volume 1A (OM10.1D3 only), Volume 1B (OM10.DC1 only), and Volume 3B Proc. ,No. Rev. Title OM10.1D3 6 Emergency Plan Training OMI0.DCI 2 Emergency Preparedness Drills and Exercises EP G-1 31 Emergency Classification and Emergency Plan Activation EP G-2 25 Activation and Operation of the Interim Site Emergency Organization (Control Room)

EP G-3* 39 Notification of Off-Site Agencies and Emergency Response Organization Personnel EP G-4* 19 Personnel Assembly, Accountability and Site Access Control During Emergencies EP G-5 9A Evacuation of Nonessential Site Personnel EP R-2 20 Release of Airborne Radioactive Materials Initial Assessment EP R-3 8C Release of Radioactive Liquids EP R-7 13 Off-Site Transportation Accidents EP OR-3 6A Emergency Recovery EP RB-1 5B Personnel Dosimetry EP RB-2 4B Emergency Exposure Guides EP RB-3 4 Stable Iodine Thyroid Blocking EP RB-4 4A Access to and Establishment of Controlled Areas Under Emergency Conditions EP RB-5 4C Personnel Decontamination EP RB-8* 16 Instructions for Field Monitoring Teams EP RB-9 11 Calculation of Release Rate EP RB-10 8 Protective Action Recommendations EP RB-1I 12 Emergency Offsite Dose Calculations EP RB-12 6 Plant Vent Iodine and Particulate Sampling During Accident Conditions EP RB-14 7 Core Damage Assessment Procedure EP RB-15 11 Post Accident Sampling System EP EF-1 29 Activation and Operation of the Technical Support Center EP EF-2 26 Activation and Operation of the Operational Support Center EP EF-3 22 Activation and Operation of the Emergency Operations Facility EP EF-4 14 Activation of the Off-Site Emergency Laboratory EP EF-9 8 Backup Emergency Response Facilities EP EF-10 5 Joint Media Center Activation and Operation

  • Procedure included in this submittal