MONTHYEARRS-16-191, License Amendment Request to Revise Technical Specifications 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2016-10-26026 October 2016 License Amendment Request to Revise Technical Specifications 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies Project stage: Request ML16350A0742016-12-15015 December 2016 Acceptance for Review of Application Concerning Extension of Type a and Type C Leak Rate Test Frequencies Project stage: Acceptance Review RS-17-024, Supplement to License Amendment Request for Permanent Extension of Type a and Type C Leak Rate Test Frequencies Regarding Hardened Containment Vent System Modifications and Installation of Primary Containment Isolation Valves2017-02-16016 February 2017 Supplement to License Amendment Request for Permanent Extension of Type a and Type C Leak Rate Test Frequencies Regarding Hardened Containment Vent System Modifications and Installation of Primary Containment Isolation Valves Project stage: Supplement ML17151A3822017-06-0505 June 2017 Request for Additional Information Regarding License Amendment Request for Extension of Type a and Type C Leak Rate Test Frequencies Project stage: RAI ML17164A1152017-06-15015 June 2017 Request for Additional Information Regarding License Amendment Request for Extension of Type a and Type C Leak Rate Test Frequencies Project stage: RAI RS-17-098, Response to Request for Additional Information Regarding License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (Sbpb Branch)2017-07-17017 July 2017 Response to Request for Additional Information Regarding License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (Sbpb Branch) Project stage: Response to RAI RS-17-099, Response to Request for Additional Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (PRA Branch)2017-08-0808 August 2017 Response to Request for Additional Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (PRA Branch) Project stage: Response to RAI RS-17-131, Supplemental Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals2017-09-27027 September 2017 Supplemental Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals Project stage: Supplement RS-17-133, Additional Supplemental Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals2017-10-0303 October 2017 Additional Supplemental Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals Project stage: Supplement RS-17-157, Supplemental Information Regarding the Third Interval Containment Inservice Inspection (Cisi) Schedule for LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals2017-11-0808 November 2017 Supplemental Information Regarding the Third Interval Containment Inservice Inspection (Cisi) Schedule for LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals Project stage: Supplement ML17283A0852017-11-16016 November 2017 Issuance of Amendment Nos. 226 and 212 - Revise Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Leak Rate Test Frequencies (CAC MF8700 and MF8701; L-2016-LLA-0021) Project stage: Approval 2017-02-16
[Table View] |
|
---|
Category:Letter
MONTHYEARRS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000373/LER-2023-001-01, Air Circuit Breaker (Acb) Mechanically Operated Contacts (MOC) Switch Failed to Actuate2024-10-0909 October 2024 Air Circuit Breaker (Acb) Mechanically Operated Contacts (MOC) Switch Failed to Actuate ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing IR 05000373/20244012024-09-27027 September 2024 County Station – Security Baseline Inspection Report 05000373/2024401 and 05000374/2024401 ML24263A2062024-09-19019 September 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for LaSalle County Station - Holtec MPC-68MCBS ML24260A0492024-09-16016 September 2024 Operator Licensing Examination Approval - Lasalle County Station, Unit 1 and 2, September 2024 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000373/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Lasalle County Station (Report 05000373/2024005; 05000374/2024005) IR 05000373/20244022024-08-28028 August 2024 County Station - Cyber Security Inspection Report 05000373/2024402 and 05000374/2024402 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 05000373/LER-2024-004-01, Emergency Diesel Generator Auto-Start and Load Due to Loss of System Auxiliary Transformer2024-08-22022 August 2024 Emergency Diesel Generator Auto-Start and Load Due to Loss of System Auxiliary Transformer IR 05000373/20240022024-08-13013 August 2024 County Station - Integrated Inspection Report 05000373/2024002 and 05000374/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000373/20244202024-08-0505 August 2024 County Station - Security Baseline Inspection Report 05000373 2024420 and 05000374 2024420 05000373/LER-2024-003-01, Supplement to Technical Specification (TS) Limiting Condition for Operation (LCO) 3.6.1.3 Completion Time Exceeded2024-07-31031 July 2024 Supplement to Technical Specification (TS) Limiting Condition for Operation (LCO) 3.6.1.3 Completion Time Exceeded ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions ML24178A2522024-06-27027 June 2024 County Station – Acknowledgement of Response to NRC Inspection Report 05000373/2024001 and 05000374/2024001 and Disputed Non-Cited Violation 05000373/LER-2024-004, Emergency Diesel Generator Auto-Start and Load Due to Loss of Station Auxiliary Transformer2024-06-19019 June 2024 Emergency Diesel Generator Auto-Start and Load Due to Loss of Station Auxiliary Transformer RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations 05000373/LER-2024-003, Technical Specification (TS) Limiting Condition for Operation (LCO) 3.6.1.3 Completion Time Exceeded2024-06-0606 June 2024 Technical Specification (TS) Limiting Condition for Operation (LCO) 3.6.1.3 Completion Time Exceeded IR 05000373/20240102024-05-29029 May 2024 County Station - Commercial Grade Dedication Inspection Report 05000373/2024010 and 05000374/2024010 ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report 05000373/LER-2024-002, Reactor Protection System Half Scram Due to Motor Generator Set Electric Power Monitoring Assembly Output Breaker Trip2024-05-17017 May 2024 Reactor Protection System Half Scram Due to Motor Generator Set Electric Power Monitoring Assembly Output Breaker Trip ML24131A1512024-05-13013 May 2024 County Station - Integrated Report 05000373/2024001 and 05000374/2024001 IR 05000373/20240012024-05-13013 May 2024 County Station - Integrated Report 05000373/2024001 and 05000374/2024001 RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000373/LER-2024-001, Core Operating Limits Report Thermal Limits Exceeded2024-04-26026 April 2024 Core Operating Limits Report Thermal Limits Exceeded ML24108A1562024-04-15015 April 2024 Updated Final Safety Analysis Report (Ufsar), Revision 26 and Fire Protection Report (Fpr), Revision 11 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24071A2122024-03-12012 March 2024 County Station - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection IR 05000373/20230062024-02-28028 February 2024 Annual Assessment Letter for Lasalle County Station, Units 1 and 2 (Report 05000373/2023006; 05000374/2023006) RS-24-014, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-02-22022 February 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML24018A0682024-02-0909 February 2024 Issuance of Amendment Nos. 262 and 247 Revised Design Bases of Lower Downcomer Braces ML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20230042024-01-24024 January 2024 County Station - Integrated Inspection Report 05000373/2023004 and 05000374/2023004 IR 05000373/20230122024-01-18018 January 2024 County Station - Biennial Problem Identification and Resolution Inspection Report 05000373/2023012 and 05000374/2023012 ML23354A2902024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0028 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23360A6082023-12-27027 December 2023 County Station Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000373/2024010 and 05000374/2024010 ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information IR 05000373/20230032023-11-0909 November 2023 County Station Integrated Inspection Report 05000373/2023003, 05000374/2023003, and 07200070/2023001 2024-09-06
[Table view] |
Text
Exelon Generation RS-17-131 10 CFR 50.90 September 27, 2017 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 LaSalle County Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374
Subject:
Supplemental Information Regarding LaSalle County Station License Amendment Request for Extension of Type A and Type C Containment Leak Rate Test Intervals
References:
1) Letter from D. M. Gullatt (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, 11License Amendment Request to Revise Technical Specifications 5.5.13, 1Primary Containment Leakage Rate Testing Program,' for Permanent Extension of Type A and Type C Leak Rate Test Frequencies,11 dated October 26, 2016 (ADAMS Accession No. ML 16300A200) 2) Letter from D. M. Gullatt (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, 11Supplement to License Amendment Request for Permanent Extension of Type A and Type C Leak Rate Test Frequencies Regarding Hardened Containment Vent System (HCVS) Modifications and Installation of Primary Containment Isolation Valves (PCIVs), 11 dated February 16, 2016 (ADAMS Accession No. ML 17048A255) 3) Letter from D. M. Gullatt (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, 11Response to Request for Additional Information Regarding LaSalle County Station License Amendment Request for Extension of Type A and Type C Containment Leak Rate Test Intervals (SBPB Branch),11 dated July 17, 2017 (ADAMS Accession No. ML17200C944) 4) Letter from D. M. Gullatt (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, 11Response to Request for Additional Information Regarding LaSalle County Station License Amendment Request for Extension of Type A and Type C Containment Leak Rate Test Intervals (PRA Branch),11 dated August 8, 2017 (ADAMS Accession No. ML 17220A 168)
September 27, 2017 U.S. Nuclear Regulatory Commission Page2 By a letter to the U.S. Nuclear Regulatory Commission (NRC) dated October 26, 2016, (Reference 1 ), Exelon Generation Company, LLC (EGC) submitted an amendment request for LaSalle County Station (LSCS), Units 1 and 2. The proposed amendment would revise the Technical Specifications {TS) 5.5.13, 11Primary Containment Leakage Rate Testing Program,11 to allow for the permanent extension of the Type A integrated leak rate testing (ILRT) and Type C leak rate testing frequencies. This request was supplemented by EGC letters dated February 16, July 17, and August 8, 2017 (References 2, 3, and 4). As discussed during a conference call with the NRC on September 19, 2017, additional supplemental information is being provided to support the NRC's review of the EGC request submitted on October 26, 2016 (Reference 1) and the supplement submitted July 17, 2017 (Reference 3). The Attachment to this letter provides the supplemental information. EGC has reviewed the information supporting a finding of no significant hazards consideration that was previously provided to the N RC in Attachment 1 of Reference 1 . The supplemental information provided in this submittal does not affect the bases for concluding that the proposed license amendment request does not involve a significant hazards consideration. In accordance with 1 O CFR 50.91, 11Notice for public comment; State consultation," paragraph (b), EGC is notifying the State of Illinois of this application for license amendment by transmitting a copy of this letter and its Attachment to the designated State Official. There are no regulatory commitments contained within this letter. Should you have any questions concerning this letter, please contact Ms. Lisa A. Simpson at (630) 657-2815. I declare under penalty of perjury that the foregoing is true and correct. Executed on the 27th day of September 2017. Respectfully, David M. Gullatt Manager -Licensing Exelon Generation Company, LLC
Attachment:
Supplemental Information cc: NRC Regional Administrator, Region Ill NRC Senior Resident Inspector, LaSalle County Station Illinois Emergency Management Agency -Division of Nuclear Safety ATTACHMENT Supplemental Information By a letter to the U.S. Nuclear Regulatory Commission (NRC) dated October 26, 2016, Exelon Generation Company, LLC (EGC) submitted an amendment request to revise the Technical Specifications (TS) 5.5.13, 11Primary Containment Leakage Rate Testing Program,11 to allow for the permanent extension of the Type A integrated leak rate testing (ILRT) and Type C leak rate testing frequencies for LaSalle County Station (LSCS), Units 1 and 2. This request was supplemented by EGC letters dated February 16, July 17, and August 8, 2017 (References 2, 3, and 4). As discussed during a conference call with the NRC on September 19, 2017, supplemental information is being provided to support the N RC's review of the EGC request submitted on October 26, 2016 (Reference 1) and the supplement submitted July 17, 2017 (Reference 3). This information is provided for the purposes of correction and clarification.
References:
1) Letter from D. M. Gullatt (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, 11License Amendment Request to Revise Technical Specifications 5.5.13, 'Primary Containment Leakage Rate Testing Program,' for Permanent Extension of Type A and Type C Leak Rate Test Frequencies,11 dated October 26, 2016 (ADAMS Accession No. ML 16300A200) 2) Letter from D. M. Gullatt (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "Supplement to License Amendment Request for Permanent Extension of Type A and Type C Leak Rate Test Frequencies Regarding Hardened Containment Vent System (HCVS) Modifications and Installation of Primary Containment Isolation Valves (PCIVs), 11 dated February 16, 2016 (ADAMS Accession No. ML 17048A255) 3) Letter from D. M. Gullatt (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, 11Response to Request for Additional Information Regarding LaSalle County Station License Amendment Request for Extension of Type A and Type C Containment Leak Rate Test Intervals (SBPB Branch)," dated July 17, 2017 (ADAMS Accession No. ML 17200C944) 4) Letter from D. M. Gullatt (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Regarding LaSalle County Station License Amendment Request for Extension of Type A and Type C Containment Leak Rate Test Intervals (PRA Branch),11 dated August 8, 2017 (ADAMS Accession No. ML 17220A 168) 5) Letter from C. Gratton (U.S. Nuclear Regulatory Commission) to M. J. Pacilio (Exelon Nuclear), "LaSalle County Station, Units 1 and 2 -Issuance of Amendments Re: Application of Alternative Source Term (TAC Nos. ME0068 and ME0069, 11 dated September 16, 2016 (ADAMS Accession No. ML 101750625) The N RC is seeking clarification regarding the following items. Page 1 of 3 ATTACHMENT Supplemental Information Tables 3.2.5-1 and 3.2.5-2 of Reference 1 state that the acceptance limit is 0.634 wt.%/day. The EGC Response to SBPB RAl-1 of Reference 3 states that the acceptance criterion is 0.635 wt.%/day.
- The acceptance limit of 0.634 wt.%/day listed in Reference 1 was in error. This was the result of a typographical error in the source document used to support the development of the license amendment request. The correct acceptance limit, which has been validated by EGC staff against past test data, is 0.635 wt.%/day. Therefore, the value included in Reference 3 is correct. The Total Leakage provided in Tables 3.2.5-1 and 3.2.5-2 of Reference 1 vary from the values provided in the EGC Response to SBPB RAl-1 of Reference 3.
- The 1994 and 2008 leakage rates for Unit 1 and 1993 and 2009 leakage rates for Unit 2 provided in the EGC Response to SBPB RAl-1 of Reference 3 are correct. The reason for the discrepancy in the values between Reference 1 and Reference 3 was the use of secondary source test data to develop Reference 1 instead of utilizing the actual test result reports (as was done for Reference 3).
- EGC has subsequently reviewed the test result reports for the first four Type A Unit 1 and first four Type A Unit 2 tests referenced in Tables 3.2.5-1 and 3.2.5-2 of Reference 1. EGC could not validate the eight specific Total Leakage values referenced in Reference 1. Through test report review, EGC has validated satisfactory results (i.e., acceptance criterion met) for seven of the eight Type A tests. The Unit 2 1990 Type A as-found test was found to be greater than the acceptance limit of 0.635 wt. %/day as a result of excessive leakage found at a local leak tested penetration or isolation valve. Corrective actions were taken, with a local leak rate test (LLRT) performed before and after, which resulted in satisfactory as-left total leakage results. Section 3.4.5 of Reference 1 includes a sentence that states. "In accordance with TS 5.5.13, the containment leakage rate, as determined by totaling the leakages of all Type B and Type C LLRTs (exclusive of the main steam lines and personnel access door seals). must be less than or equal to 0.6 La or 384.2 standard cubic ft per hour (SCFH).11
- EGC has confirmed that 0.6 La is equal to 384.2 SCFH based on EGC program procedure LTS-300-4, "Unit 1 (2) Primary Containment Integrated Leak Rate Test (ILRT).11 EGC proposes the following clarification to this sentence (emphasis added): In accordance with TS 5.5.13, the containment leakage rate, as determined by totaling the leakages of all Type Band Type C LLRTs (exclusive of the main steam lines and personnel access door seals), must be less than or equal to 0.6 La, which is equivalent to 384.2 standard cubic ft per hour (SCFH). The leakage acceptance value, La, is equivalent to 640.4 SCFH. Page 2 of 3 ATTACHMENT Supplemental Information
- EGC has validated that Tables 3.4.5-1 and 3.4.5-2 are correct as stated in Reference 1. The percentages shown in Tables 3.4.5-1 and 3.4.5-2 are based on 364.2 SCFH to provide a conservative total with margin.
- The leakage acceptance value, La, changed from 0.635 to 1.0 with the approval of Alternative Source Term (AST) on September 6, 2010 (Reference 5). Page 3 of 3