_ ___________
e
-
~
-
m UNITED STATES
NUCLEAR REGULATORY COMMISSION
\\
REGION 11 230 PEACHTREE STREET. N. W.
SulTE SIS
ATLANTA. G EO RGli 3C303
.
.
IE Inspection Report No. 50-302/75-18
'
Licensee:
Florida Power Corporation 3201 34th Street, South Post Office Box 14042
~
St. Petersburg, Florida 33733 J
Facility Name: Crystal River 3
,_
Docket No.:
50-302 License No'.:
CPPR-51 Category:
B1 Location:
Crystal River, Florida Type of License:
B&W, PWR, 2452 Mwt Type of Inspection: Routine, Announced Dates of Inspection: November 18-22, 1975 Dates cf Previous Inspection: November 4-7, 1975 Inspector-in-Charge:
F. Jape, Reactor Inspector Reactor Projects Section 1 Reactor Operations and Nuclear Support Branch Accompanying Inspectors: None I
Other Accompanying Personnel: None
/ 2!/!75 Principal Inspector: b, [t).
A K. W. Whitt, Reactor Inspector Date Reactor Projects Section 2 Reactor Operations and Nuclear Support Branch Reviewed by: -
-[-
< s.d b
/E
R. C. Lewis, Section Leader Date Reactor Projects Section 2 Reactor Operations and Nuclear Support Branch d*
e, Ql:
%.,
8002 280 f 2 y
- ~
_ _ _.
'
'
.
.
.
.
-
IE Rpt. No. 50-302/75-18-2-SUMMARY OF FINDINGS
-
-
I.
Enforcement Matters
There wer'e no items of noncompliance identified during this inspection.
II.
Licensee Action on Previously Identified Enforcement Matters
'
There are no previously identified enforcement matters requiring i
resolution.
,!
III. New Unresolved Items
None
,.,
IV.
Status of Previously Identified Unresolved Items Not inspected.
-
'
V.
Unusual Occurrences
'
None VI.
Other Significant Findings The reactor coolant system hydrostatic test was successfully completed on November 23, 1975.
VII. Management Interview A management interview was held in two parts. Part one was conducted on November 21, 1975. The inspector's tentative findings concerning the performance of the reactor coolant system hydrostatic test were discussed. Part two was held at the conclusion of the inspection, on November 22, 1975. The tentative findings discussed at part one of the management interview were finalized.
The llowing personnel attended Part one:
-
J. Alberdi - Project Manager G. P. Beatty - Plant Superintendent G. J. Walker - Manager, Field Testing D. W. Bienkouski - QA Engineer P. N. King - QA Engineer N. D. Henry - QS Quality Auditor D. W. Pedrick IV - Compliance Engineer s
l i
I l
-
.-.
.
-.
_--
.
-
.-
_
._
p.
-
.
,.
.
,
IE Rpt. No. 50-302/75-18-3-
-
,
.
.
J. J. Kelly - Testing Superintendent Part two was attended by G. J. Walker.
-
l I
.
.
.-
!
,i
.
n
.,
e i
I
.
l
.
,,
..
a 5..
-
.
.
he h
?-4
"
i i
,
.
._
____
_
_ _ _ _ _ - - - - - - - - - - - - - - - _ _ _ _ - - - -
-.-
.-
-
.
-
.
.
t.
.
.
IE Rpt. No. 50-302/75-18-1-
'
+
DETAILS Prepared by:
/[6 14 N
F. Jale, Reactor Inspectof Date V
Reactor Projects Section No. 1 Reactor Operations and Nuclear Support Branch
-
,
Dates of Inspection: November 18-22, 1975
/
[/#
Reviewed by:
,
W. C. Seidle, (9ction Leader Dhtd
"
Feactor Projects Section No. 1
Reactor Operations and Nuclear Support Branch
,.
1.
Persons Contacted
-
Florida Power Corporation (FPC)
J. C. Hobbs, Jr. - Manager, Generation Testing G. J. Walker - Manager, Field Testing J. F. Heilman - Assistant Nuclear Operator M. Holmes - Assistant Nuclear Operator E. R. Sessons - Nuclear Operator P. L. Breaux - Shif t Supervisor W. M. Mathews - Shift Supervisor
.
R. L. Skipper - Nuclear Operator R. A. Parker - Chief Operator D. A. Morrison - Nuclear Operator D. W. Bienkowski - QA Engineer Babcock and Wilcox (B&W)
J. J. Kelley - Testing Superintendent i
D. R. Vincent - System Test Engineer J. Renner - System Test Engineer M. B. Owen - Sy_ stem Test Engineer
)
E. G. Schaedee - System Test Engineer NUS J. Greene - System Test Engineer I
<
-
...
-
.
,
__
.
. _ _ _ _
-
...
,.
-
i
_
.
.
.,
"
IE Rpt. No. 50-302/75-18
- 2-
.
_
.
_ 2.
Hydrostatic Pressure Test of Reactor Coolant System
.
The inspector witnessed a portion of test procedure TP 7 1 200 04,
"RC System Hydrostatic Test."
The test was successfully completed t
at 3173 psig on November 23, 1975.
The test pressure was held for
-
11 minutes, which is one minute longer than required by USAS B31.7,
" Nuclear Power Piping Code," and then lowered to 2558 psig. The
'
!
pressure was held at 2558 psig while the piping system was monitored
- for leakage. The test pressure of 3173 psig was witnessed by
'
'
representatives of Florida Power Corporation. *
'
..The inspector noted that the two pressure gages used to measure
-
.
test pressure were calibrated on November 21, 1975, and the records i
revealed the gages to be within 0.25% of full scale (5000 psig).
A review of the data sheets and checklists revealed that the test procedure was being followed as prescribed.
Minor and major
'
-
,
changes required to conduct the test were processed as described-in Test Program Guide 1.1, Section 2.7.
i Discussions with operators and testing personnel revealed that they
,
were familiar with the test procedure.
Their actions were responsive and timely. The inspector observed data sheets being filled as
!
required by the test procedure.
Flow and piping drawings were available to indicate the test pressure boundary. A detailed log
'
was being maintained during performance of the test. The inspector aramined this record and had no questions.
To establish the pressure boundary for the test, a number of jumpers, vent rigs and special flanges were required to be installed. The
-
inspector verified the installation of several of these special modifications and examined the temporary test device records authorizing their installation. Also, it was noted that the part 9.4 of the test procedure covered restoration of the system following the test.
-
The inspector detected no deficiencies associated with the hydrostatic test.
.
.
I
- Information obtained by telephone discussion with G. J. Walker on
'
November S, 1975.
.