ML12283A010 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 10/02/2012 |
From: | Gellrich G H Calvert Cliffs, Constellation Energy Nuclear Group, EDF Group |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML12283A010 (9) | |
Similar Documents at Calvert Cliffs | |
---|---|
Category:Letter
MONTHYEARIR 05000317/20230042024-02-0101 February 2024
[Table view]Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000318/LER-2023-004, Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-16016 January 2024 Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-002, Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-0808 January 2024 Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 ML23318A4722023-11-14014 November 2023 Supplement to License Amendment Request to Adopt TSTF-59-A ML23317A1032023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23310A0442023-11-0707 November 2023 Project Manager Assignment IR 05000317/20230402023-11-0202 November 2023 95001 Supplemental Inspection Report 05000317/2023040 and Follow-Up Assessment Letter IR 05000317/20230032023-11-0101 November 2023 Integrated Inspection Report 05000317/2023003 and 05000318/2023003 IR 05000317/20230902023-10-26026 October 2023 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 ML23289A1202023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23279A1202023-10-0606 October 2023 Response to NRC Inspection Report and Preliminary White Finding IR 05000317/20230502023-09-29029 September 2023 Special Inspection Report 05000317/2023050 and Preliminary White Finding and Apparent Violation ML23272A1032023-09-29029 September 2023 Condition Prohibited by Technical Specifications Due to Inoperable Nuclear Instrumentation at Very Low Power IR 05000317/20234012023-09-18018 September 2023 Cyber Security Inspection Report 05000317/2023401 and 05000318/2023401 ML23254A0012023-09-0505 September 2023 Registration of Use of Casks to Store Spent Fuel IR 05000317/20230052023-08-31031 August 2023 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2023005 and 05000318/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23241A8412023-08-29029 August 2023 Response to Request for Additional Information - Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping ML23240A3872023-08-28028 August 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration ML23219A1662023-08-16016 August 2023 Request for Additional Information Regarding Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping (EPID: L-2023-LLR-0006) - Non-proprietary ML23228A1002023-08-15015 August 2023 Notification of Readiness for NRC 95001 Inspection ML23188A0402023-08-0808 August 2023 Issuance of Amendment Nos. 346 and 324 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23214A1572023-08-0707 August 2023 Correction to the Renewed Facility Operating License Page 3 in Amendment No 345 IR 05000317/20230022023-08-0303 August 2023 Integrated Inspection Report 05000317/2023002 ML23188A0512023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 336 and 314 ML23186A0372023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 340 and 318 IR 05000317/20233012023-07-12012 July 2023 Initial Operator Licensing Examination Report 05000317/2023301 and 05000318/2023301 IR 05000317/20230122023-07-10010 July 2023 Commercial Grade Dedication Report 05000317/2023012 and 05000318/2023012 ML23180A2362023-06-29029 June 2023 Correction of Errors on Technical Specification Pages RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators ML23156A6752023-06-20020 June 2023 Request for Withholding Information from Public Disclosure for Proposed Alternative to the Requirements for Repair/Replacement of Saltwater System Buried Piping 2024-02-01 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML21278A2832021-09-0707 September 2021
[Table view]2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.18, Fuel Handling Incident ML21278A2602021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 13, Section 13.4, Post-Refueling Startup Event ML21278A2692021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.9, Loss-of-Coolant Flow Event ML21278A3042021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Table 16.1, Aging Management Programs (Amp), Indexed by LRA Section and System ML22115A0432021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 02, Section 2.2, Population and Land Use_Redacted ML22115A0462021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 9, Figures 9.1 Through 9.30_Redacted ML21278A3022021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.5, References ML21278A2932021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.22, Waste Gas Incident ML21278A2962021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.4, 10 CFR 54.67(B) Update ML21278A3032021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.3, Evaluation of Time-Limited Aging Analyses ML22115A0472021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10A Figure 10A.1-1, Main Steam System: Redacted ML21278A2852021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.21, Deleted ML21278A2872021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.15, Steam Generator Tube Rupture Event ML21278A2912021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.26, Feedline Break Event ML21278A2552021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.1, Organization and Methodology ML21278A2762021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations, Table of Contents ML21278A2802021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 15, Table of Contents ML21278A2842021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.16, Seized Rotor Event ML21278A2922021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.23, Waste Processing System Incident ML21278A2712021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.7, Excess Feedwater Heat Removal Event ML21278A2742021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.12, Asymmetric Steam Generator Event ML21278A2672021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.10, Loss-Of-Non-Emergency AC Power ML21278A2622021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 12, Figures, Deleted ML21278A2642021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.6, Loss of Feedwater Flow Event ML21278A2682021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.8, Reactor Coolant System Depressurization ML21278A2752021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.2, Control Element Assembly Withdrawal Event ML21278A2612021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.14, Steam Line Break Event ML21278A2772021-09-0707 September 2021 2 to Final Safety Analysis Report, Chapter 14, Safety Analysis, Table of Contents ML21278A2532021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.5, Loss of Load Event ML21278A2522021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 11, Section 11.3, Radiation Safety ML22115A0482021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 11, Figures: Redacted ML21278A2892021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.24, Maximum Hypothetical Accident ML21278A2572021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operation, Table of Contents ML21278A2662021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 13, Section 13.0, Initial Tests and Operation ML21278A2992021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.1, Introduction ML22115A0422021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 1, Figures: Redacted ML21278A2822021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14 Section 14.25, Excessive Charging Event ML21278A2862021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.2.1 Through 14.26-10 ML21278A2702021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 12, Section 12.5, Review and Audit of Operations ML21278A2542021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.11, Control Element Assembly Drop Event ML21278A2562021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 12, Section 12.6, Emergency Planning ML21278A2722021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.13, Control Element Assembly Ejection ML22115A0442021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 2, Section 2.10, Other Design Considerations: Redacted ML21278A2942021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.19, Turbine-Generator Overspeed Incident ML21278A2982021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 16, Section 16.2, Aging Management Programs and Activities ML22115A0452021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 5, Section 5.6, Other Structures - Redacted ML21278A2882021-09-0707 September 2021 2 to Updated Safety Analysis Report, Chapter 14, Section 14.20, Containment Response ML21278A2782021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 14, Section 14.4, Excess Load Event ML21278A2812021-09-0707 September 2021 2 to Updated Final Safety Analysis Report, Chapter 15, Section 15.0, Technical Requirements Manual ML21278A2902021-09-0707 September 2021 2 to Final Safety Analysis Report, Chapter 14 ,Section 14.17, Loss-of-Coolant Accident 2021-09-07 |