ML20095L068

From kanterella
Revision as of 08:17, 13 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Corrected Page 3/4 4-25 & 26 W/Overleaf for Completeness of Amend 46 to License NPF-86.Error Involved TS Page W/O Page & Amend Number
ML20095L068
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 12/21/1995
From:
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20095L066 List:
References
NUDOCS 9601020022
Download: ML20095L068 (2)


Text

4 ATTACMENT TO LICENSE AMENDMENT NO. 46 FACILITY OPERATING LICENSE NO. NPF-86 DOCKET NO. 50-443 Replace the following pages of Appendix A, Technical Specifications, with the attached pages as indicated. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.

Remove Insert 3/4 4-25 3/4 4-25 3/4 4-26 3/4 4-26 4

9601020022 951221 PDR ADOCK 05000443 P

PDR

REACTOR COOLANT SYSTEM 3/4 4.7 CHEMISTRY LIMITING ColeITION Fe9 OPERATION 3.4.7 The Reactor Coolant System chemistry shall be maintained within the limits specified in Table 3.4-2.

APPLICABILITY: At all times.

i ACTION:

.400ES 1, 2, 3, and 4:

j a.

With any one or more chemistry parameter in excess of its Steady-State Limit but within its Transient Limit, restore the parameter to within its Steady-State Limit within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STAN08Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; and b.

With any one or more chemistry parameter in excess of its Transient Limit, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

At All Other Times:

With the concentration of either chloride or fluoride in the Reactor Coolant System in excess of its Steady-State Limit for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> l

or in excess of its Transient Limit, reduce the pressurizer pressure to less than or equal to 500 psig, if applicable, and perform an engineering evaluation to determine the effects of the out-of-limit condition on the structural integrity of the Reactor Coolant System; determine that the i

Reactor Coolant System remains acceptable for continued operation prior to increasing the pressurizer pressure above 500 psig or prior to i

4 proceeding to MODE 4.

SURVEILLANCE REOUIREMENTS l

4.4.7 The' Reactor Coolant System chemistry shall be determined to be within once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.{ sis of those parameters specified in Table 3.4-2 at least the limits by ana1 i

  • Sample and analysis for dissolved oxygen is not required with Tg250'F l

SEABROOK.', y UNIT 1 3/4 4-25 Amendment No. 46 4

TABLE 3.4-2 REACTOR COOLANT SYSTEM CHEMISTRY LIMITS STEADY-STATE TRANSIENT PARAMETER LIMIT LIMIT Dissolved Oxygen *

< 0.10 ppa s 1.00 ppe Chloride

< 0.15 ppe s 1.50 ppe Fluoride s 0.15 ppe s 1.50 ppe

  • Limit not applicable with T,, less than or equal to 250*F l

. A. g.ed. ament. No. 46 SEABROOK - UNIT 1 3/4 4-26 n

a