ML15041A830
From kanterella
Revision as of 00:52, 28 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML15041A830 | |
Person / Time | |
---|---|
Site: | Lasalle |
Issue date: | 02/10/2015 |
From: | Vinyard H T Exelon Generation Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RA15-003 LER 15-001-00 | |
Download: ML15041A830 (6) | |
Similar Documents at Lasalle | |
---|---|
Category:Letter
MONTHYEARML24319A2552024-11-14014 November 2024
[Table view]Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000373/2025001 and 05000374/2025001 IR 05000373/20240032024-11-0606 November 2024 County Station - Integrated Inspection Report 05000373/2024003 and 05000374/2024003 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000373/20243012024-10-31031 October 2024 Initial License Examination Report 05000373/2024301 05000374/2024301 IR 05000373/20244042024-10-23023 October 2024 County Station – Security Baseline Inspection Report 05000373/2024404 and 05000374/2024404 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000373/LER-2023-001-01, Air Circuit Breaker (Acb) Mechanically Operated Contacts (MOC) Switch Failed to Actuate2024-10-0909 October 2024 Air Circuit Breaker (Acb) Mechanically Operated Contacts (MOC) Switch Failed to Actuate ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing IR 05000373/20244012024-09-27027 September 2024 County Station – Security Baseline Inspection Report 05000373/2024401 and 05000374/2024401 RS-24-094, Request to Recategorize an Indeterminate Exercise2024-09-20020 September 2024 Request to Recategorize an Indeterminate Exercise ML24263A2062024-09-19019 September 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for LaSalle County Station - Holtec MPC-68MCBS ML24260A0492024-09-16016 September 2024 Operator Licensing Examination Approval - Lasalle County Station, Unit 1 and 2, September 2024 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000373/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Lasalle County Station (Report 05000373/2024005; 05000374/2024005) IR 05000373/20244022024-08-28028 August 2024 County Station - Cyber Security Inspection Report 05000373/2024402 and 05000374/2024402 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 05000373/LER-2024-004-01, Emergency Diesel Generator Auto-Start and Load Due to Loss of System Auxiliary Transformer2024-08-22022 August 2024 Emergency Diesel Generator Auto-Start and Load Due to Loss of System Auxiliary Transformer IR 05000373/20240022024-08-13013 August 2024 County Station - Integrated Inspection Report 05000373/2024002 and 05000374/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000373/20244202024-08-0505 August 2024 County Station - Security Baseline Inspection Report 05000373 2024420 and 05000374 2024420 05000373/LER-2024-003-01, Supplement to Technical Specification (TS) Limiting Condition for Operation (LCO) 3.6.1.3 Completion Time Exceeded2024-07-31031 July 2024 Supplement to Technical Specification (TS) Limiting Condition for Operation (LCO) 3.6.1.3 Completion Time Exceeded ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions ML24178A2522024-06-27027 June 2024 County Station – Acknowledgement of Response to NRC Inspection Report 05000373/2024001 and 05000374/2024001 and Disputed Non-Cited Violation 05000373/LER-2024-004, Emergency Diesel Generator Auto-Start and Load Due to Loss of Station Auxiliary Transformer2024-06-19019 June 2024 Emergency Diesel Generator Auto-Start and Load Due to Loss of Station Auxiliary Transformer RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations 05000373/LER-2024-003, Technical Specification (TS) Limiting Condition for Operation (LCO) 3.6.1.3 Completion Time Exceeded2024-06-0606 June 2024 Technical Specification (TS) Limiting Condition for Operation (LCO) 3.6.1.3 Completion Time Exceeded IR 05000373/20240102024-05-29029 May 2024 County Station - Commercial Grade Dedication Inspection Report 05000373/2024010 and 05000374/2024010 ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report 05000373/LER-2024-002, Reactor Protection System Half Scram Due to Motor Generator Set Electric Power Monitoring Assembly Output Breaker Trip2024-05-17017 May 2024 Reactor Protection System Half Scram Due to Motor Generator Set Electric Power Monitoring Assembly Output Breaker Trip ML24131A1512024-05-13013 May 2024 County Station - Integrated Report 05000373/2024001 and 05000374/2024001 IR 05000373/20240012024-05-13013 May 2024 County Station - Integrated Report 05000373/2024001 and 05000374/2024001 RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000373/LER-2024-001, Core Operating Limits Report Thermal Limits Exceeded2024-04-26026 April 2024 Core Operating Limits Report Thermal Limits Exceeded ML24108A1562024-04-15015 April 2024 Updated Final Safety Analysis Report (Ufsar), Revision 26 and Fire Protection Report (Fpr), Revision 11 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24071A2122024-03-12012 March 2024 County Station - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection IR 05000373/20230062024-02-28028 February 2024 Annual Assessment Letter for Lasalle County Station, Units 1 and 2 (Report 05000373/2023006; 05000374/2023006) RS-24-014, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-02-22022 February 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML24018A0682024-02-0909 February 2024 Issuance of Amendment Nos. 262 and 247 Revised Design Bases of Lower Downcomer Braces ML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20230042024-01-24024 January 2024 County Station - Integrated Inspection Report 05000373/2023004 and 05000374/2023004 IR 05000373/20230122024-01-18018 January 2024 County Station - Biennial Problem Identification and Resolution Inspection Report 05000373/2023012 and 05000374/2023012 ML23354A2902024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0028 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 2024-09-06 Category:Licensee Event Report (LER) MONTHYEAR05000373/LER-2023-001-01, Air Circuit Breaker (Acb) Mechanically Operated Contacts (MOC) Switch Failed to Actuate2024-10-0909 October 2024
[Table view]Air Circuit Breaker (Acb) Mechanically Operated Contacts (MOC) Switch Failed to Actuate 05000373/LER-2024-004-01, Emergency Diesel Generator Auto-Start and Load Due to Loss of System Auxiliary Transformer2024-08-22022 August 2024 Emergency Diesel Generator Auto-Start and Load Due to Loss of System Auxiliary Transformer 05000373/LER-2024-003-01, Supplement to Technical Specification (TS) Limiting Condition for Operation (LCO) 3.6.1.3 Completion Time Exceeded2024-07-31031 July 2024 Supplement to Technical Specification (TS) Limiting Condition for Operation (LCO) 3.6.1.3 Completion Time Exceeded 05000373/LER-2024-004, Emergency Diesel Generator Auto-Start and Load Due to Loss of Station Auxiliary Transformer2024-06-19019 June 2024 Emergency Diesel Generator Auto-Start and Load Due to Loss of Station Auxiliary Transformer 05000373/LER-2024-003, Technical Specification (TS) Limiting Condition for Operation (LCO) 3.6.1.3 Completion Time Exceeded2024-06-0606 June 2024 Technical Specification (TS) Limiting Condition for Operation (LCO) 3.6.1.3 Completion Time Exceeded 05000373/LER-2024-002, Reactor Protection System Half Scram Due to Motor Generator Set Electric Power Monitoring Assembly Output Breaker Trip2024-05-17017 May 2024 Reactor Protection System Half Scram Due to Motor Generator Set Electric Power Monitoring Assembly Output Breaker Trip 05000373/LER-2024-001, Core Operating Limits Report Thermal Limits Exceeded2024-04-26026 April 2024 Core Operating Limits Report Thermal Limits Exceeded 05000374/LER-2022-003-02, Manual Scram Due to Lsophase Bus Duct Fire Followed by 2A RPS Normal Power Supply Trip2023-06-16016 June 2023 Manual Scram Due to Lsophase Bus Duct Fire Followed by 2A RPS Normal Power Supply Trip 05000373/LER-2023-001, Low Pressure Core Spray Inoperable Due to Minimum Flow Valve Flow Pressure Switch Failure2023-06-16016 June 2023 Low Pressure Core Spray Inoperable Due to Minimum Flow Valve Flow Pressure Switch Failure 05000374/LER-2021-002-02, Supplement to Reactor Protection System Half Scram Due to Motor Generator Set Output Breaker Trip2023-05-25025 May 2023 Supplement to Reactor Protection System Half Scram Due to Motor Generator Set Output Breaker Trip 05000374/LER-2023-003, Automatic Actuation of Reactor Protection System (RPS) During Restoration from Hydrostatic Test Conditions I2023-05-0202 May 2023 Automatic Actuation of Reactor Protection System (RPS) During Restoration from Hydrostatic Test Conditions I 05000373/LER-2023-002, Air Circuit Breaker (Acb) Mechanically Operated Contacts (MOC) Switch Failed to Actuate2023-04-25025 April 2023 Air Circuit Breaker (Acb) Mechanically Operated Contacts (MOC) Switch Failed to Actuate 05000374/LER-2023-001, Standby Liquid Control Valve Inoperable Due to Failed Motor Starter Contactor2023-04-17017 April 2023 Standby Liquid Control Valve Inoperable Due to Failed Motor Starter Contactor 05000374/LER-1922-003-01, Manual Scram Due to Lsophase Bus Duct Fire Followed by 2A RPS Normal Power Supply Trip2023-02-0909 February 2023 Manual Scram Due to Lsophase Bus Duct Fire Followed by 2A RPS Normal Power Supply Trip 05000373/LER-2022-004, Both Trains of Main Control Room and Auxiliary Electric Room HVAC Declared Inoperable Due to Compressor Trips2022-12-28028 December 2022 Both Trains of Main Control Room and Auxiliary Electric Room HVAC Declared Inoperable Due to Compressor Trips 05000373/LER-2022-003-02, Supplement to Main Control Room and Auxiliary Electric Room HVAC Declared Inoperable Due to Multiple Component Failures2022-12-28028 December 2022 Supplement to Main Control Room and Auxiliary Electric Room HVAC Declared Inoperable Due to Multiple Component Failures 05000374/LER-2022-003, Manual Scram Due to Lsophase Bus Duct Fire and 2A RPS Normal Power Supply Trip2022-11-15015 November 2022 Manual Scram Due to Lsophase Bus Duct Fire and 2A RPS Normal Power Supply Trip 05000373/LER-2022-003-01, Main Control Room and Auxiliary Electric Room HVAC Declared Inoperable Due to Multiple Component Failures2022-09-23023 September 2022 Main Control Room and Auxiliary Electric Room HVAC Declared Inoperable Due to Multiple Component Failures 05000373/LER-2022-003, Main Control Room and Auxiliary Electric Room HVAC Declared Inoperable Due to Multiple Component Failures2022-07-18018 July 2022 Main Control Room and Auxiliary Electric Room HVAC Declared Inoperable Due to Multiple Component Failures 05000373/LER-2022-001, Turbine Stop Valve Limit Switch Failure Due to Lubricant Degradation2022-05-27027 May 2022 Turbine Stop Valve Limit Switch Failure Due to Lubricant Degradation 05000374/LER-2022-002, Turbine Stop Valve Limit Switch Failure Due to Lubricant Degradation2022-05-27027 May 2022 Turbine Stop Valve Limit Switch Failure Due to Lubricant Degradation 05000374/LER-2021-002-01, Reactor Protection System Half Scram Due to Motor Generator Set Output Breaker Trip2021-09-23023 September 2021 Reactor Protection System Half Scram Due to Motor Generator Set Output Breaker Trip 05000374/LER-2021-002, Reactor Protection System Half Scram Due to Motor Generator Set Output Breaker Trip2021-07-29029 July 2021 Reactor Protection System Half Scram Due to Motor Generator Set Output Breaker Trip 05000374/LER-2021-001, High Pressure Core Spray Inoperable Due to Water Leg Pump Breaker Cubicle Motor Contactor2021-02-18018 February 2021 High Pressure Core Spray Inoperable Due to Water Leg Pump Breaker Cubicle Motor Contactor 05000373/LER-2017-0072017-08-18018 August 2017 Low Pressure Core Spray System Inoperable due to Loss of Cooling, LER 17-007-00 for LaSalle County Station, Unit 1, Regarding Low Pressure Core Spray System Inoperable due to Loss of Cooling 05000374/LER-2017-0032017-08-0909 August 2017 High Pressure Core Spray System Inoperable due to Injection Valve Stem-Disc Separation, LER 17-003-01 for LaSalle County Station, Unit 2 Regarding High Pressure Core Spray System Inoperable due to Injection Valve Stem-Disc Separation 05000373/LER-2017-0062017-07-14014 July 2017 Low Pressure Core Spray Inoperable due to Minimum Flow Valve Failure in Closed Position, LER 17-006-00 for LaSalle, Unit 1, Regarding Low Pressure Core Spray Inoperable due to Minimum Flow Valve Failure in Closed Position 05000374/LER-2017-0042017-07-14014 July 2017 Two Main Steam Safety Relief Valves Failed Inservice Lift Inspection Pressure Test, LER 17-004-01 for LaSalle, Unit 2, Regarding Two Main Steam Safety Relief Valves Failed Inservice Lift Inspection Pressure Test 05000373/LER-2017-0052017-04-18018 April 2017 Manual Reactor Scram Resulting From Feedwater Regulating Valve Failure Causing High Reactor Water Level, LER 17-005-00 for LaSalle County, Unit 1, Regarding Manual Reactor Scram Resulting From Feedwater Regulating Valve Failure Causing High Reactor Water Level 05000373/LER-2017-0042017-04-17017 April 2017 Secondary Containment Inoperable Due to Interlock Doors Open, LER 17-004-00 for LaSalle County, Unit 1, Regarding Secondary Containment Inoperable Due to Interlock Doors Open 05000373/LER-2017-0032017-04-14014 April 2017 Automatic Reactor Scram due to Main Generator Trip on Differential Current During Back-Feed Operations, LER 17-003-00 for LaSalle County Station, Unit 1, Regarding Automatic Reactor Scram due to Main Generator Trip on Differential Current During Back-Feed Operations 05000374/LER-2017-0022017-03-30030 March 2017 High Pressure Core Spray System Declared Inoperable due to Cooling Water Strainer Backwash Valve Stem-Disc Separation, LER 17-002-00 for LaSalle, Unit 2, Regarding High Pressure Core Spray System Declared Inoperable due to Cooling Water Strainer Backwash Valve Stem-Disc Separation 05000374/LER-2017-0012017-03-24024 March 2017 Manual Reactor Scram due to Turbine-Generator Run-Back Caused by Stem-Disc Separation in Stator Water Cooling Heat Exchanger Inlet Valve, LER 17-001-00 for LaSalle County, Unit 2 Regarding Manual Reactor Scram due to Turbine-Generator Run-Back Caused by Stem-Disc Separation in Stator Water Cooling Heat Exchanger Inlet Valve 05000373/LER-2017-0012017-02-0808 February 2017 Reactor Core Isolation Cooling System Inoperable Longer than Allowed by the Technical Specifications due to Low Suction Pressure Trips, LER 17-001-00 for LaSalle County, Unit 1, Regarding Reactor Core Isolation Cooling System Inoperable Longer than Allowed by the Technical Specifications due to Low Suction Pressure Trips 05000374/LER-2016-0012016-04-18018 April 2016 Secondary Containment Inoperable Due to Interlock Doors Open, LER 16-001-00 for LaSalle County, Unit 2, Regarding Secondary Containment Inoperable Due to Door Interlock Doors Open 05000373/LER-2016-0012016-04-11011 April 2016 Secondary Containment Inoperable due to Reactor Building Ventilation Damper Failure, LER 16-001-00 for LaSalle County, Unit 1 & 2, Regarding Secondary Containment Inoperable Due to Reactor Building Ventilation Damper Failure 2024-08-22 |