Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1
ML23317A346
Person / Time
Site: Oconee, Mcguire, Catawba, Harris, Brunswick, Robinson, McGuire  Duke Energy icon.png
Issue date: 11/14/2023
From: Natreon Jordan
NRC/NRR/DORL/LPL2-2
To: Gibby S
Duke Energy
References
EPID L-2023-LLA-0028
Download: ML23317A346 (1)


Text

November 14, 2023 Mr. Shawn Gibby Vice President Nuclear Engineering Duke Energy 526 South Church Street, EC-07H Charlotte, NC 28202

SUBJECT:

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2; CATAWBA NUCLEAR STATION, UNIT NOS. 1 AND 2; SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1; MCGUIRE NUCLEAR STATION, UNIT NOS. 1 AND 2; OCONEE NUCLEAR STATION, UNIT NOS. 1, 2, AND 3; AND H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 - CORRECTION LETTER TO LICENSE AMENDMENT NOS. 312 AND 340 RE: ISSUANCE OF AMENDMENTS REGARDING THE ADOPTION OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-554, REVISION 1 (EPID L-2023-LLA-0028)

Dear Mr. Gibby:

By letter dated August 29, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23195A078), the U.S. Nuclear Regulatory Commission (NRC, the Commission) issued Amendment Nos. 312 and 340 to Renewed Facility Operating License Nos. DPR-71 and DPR-62 for the Brunswick Steam Electric Plant, Unit Nos. 1 and 2, respectively; Amendment Nos. 317 and 313 to Renewed Facility Operating License Nos. NPF-35 and NPF-52 for the Catawba Nuclear Station, Unit Nos. 1 and 2, respectively; Amendment No. 198 to Renewed Facility Operating License No. NPF-63 for the Shearon Harris Nuclear Power Plant, Unit No. 1; Amendment Nos. 328 and 307 to Renewed Facility Operating License Nos. NPF-9 and NPF-17 for the McGuire Nuclear Station, Unit Nos. 1 and 2, respectively; Amendment Nos. 428, 430, and 429 to Renewed Facility Operating License Nos. DPR-38, DPR-47, and DPR-55 for the Oconee Nuclear Station, Unit Nos. 1, 2, and 3, (ONS) respectively; and Amendment No. 276 to Renewed Facility Operating License No. DPR-23 for the H. B. Robinson Steam Electric Plant, Unit No. 2. The license amendments consist of changes to the technical specifications (TSs) in response to your application dated February 16, 2023.

Following issuance of the amendments, typographical errors were identified by the licensee on page 6 of the facility operating license pages for the Brunswick Steam Electric Plant, Unit Nos. 1 and 2.

The NRC staff concludes that the errors were introduced during the preparation of the license amendments and are entirely editorial in nature. The proposed corrections do not change any of the conclusions in the safety evaluation associated with the amendments referenced above and do not affect the associated notices to the public. Enclosed are the corrected facility operating

license pages. Please replace the corresponding pages issued by Amendment Nos. 312 and 340 for the Brunswick Steam Electric Plant, Unit Nos. 1 and 2, respectively.

If you have any questions regarding this matter, I may be reached at (301) 415-7410 or via email at natreon.jordan@nrc.gov.

Sincerely,

/RA by Luke Haeg for/

Natreon J. Jordan, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325, 50-324, 50-413, 50-414, 50-400, 50-369, 50-370, 50-269, 50-270, 50-287, and 50-261

Enclosure:

Revised License Pages cc: Listserv Renewed License No. DPR-71 Amendment No. 312 (c)

Transition License Conditions

1. Before achieving full compliance with 10 CFR 50.48(c), as specified by 2. below, risk-informed changes to the licensees fire protection program may not be made without prior NRC review and approval unless the change has been demonstrated to have no more than a minimal risk impact, as described in 2. above.
2. The licensee shall implement the modifications to its facility, as described in Table S-1, Plant Modifications Committed, of Duke letter BSEP 14-0122, dated November 20, 2014, to complete the transition to full compliance with 10 CFR 50.48(c) by the startup of the second refueling outage for each unit after issuance of the safety evaluation. The licensee shall maintain appropriate compensatory measures in place until completion of these modifications.
3. The licensee shall complete all implementation items, except item 9, listed in LAR Attachment S, Table S-2, Implementation Items, of Duke letter BSEP 14-0122, dated November 20, 2014, within 180 days after NRC approval unless the 180th day falls within an outage window; then, in that case, completion of the implementation items, except item 9, shall occur no later than 60 days after startup from that particular outage. The licensee shall complete implementation of LAR Attachment S, Table S-2, Item 9, within 180 days after the startup of the second refueling outage for each unit after issuance of the safety evaluation.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2923 megawatts thermal.

(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 312, are hereby incorporated in the license. Duke Energy Progress, LLC shall operate the facility in accordance with the Technical Specifications.

For Surveillance Requirements (SRs) that are new in Amendment 203 to Renewed Facility Operating License DPR-71, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 203. For SRs that existed prior to Amendment 203, including SRs with modified acceptance criteria and SRs whose frequency of Renewed License No. DPR-62 Amendment No. 340 (c)

Transition License Conditions

1. Before achieving full compliance with 10 CFR 50.48(c), as specified by 2. below, risk-informed changes to the licensees fire protection program may not be made without prior NRC review and approval unless the change has been demonstrated to have no more than a minimal risk impact, as described in 2. above.
2. The licensee shall implement the modifications to its facility, as described in Table S-1, Plant Modifications Committed, of Duke letter BSEP 14-0122, dated November 20, 2014, to complete the transition to full compliance with 10 CFR 50.48(c) by the startup of the second refueling outage for each unit after issuance of the safety evaluation. The licensee shall maintain appropriate compensatory measures in place until completion of these modifications.
3. The licensee shall complete all implementation items, except Item 9, listed in LAR Attachment S, Table S-2, Implementation Items, of Duke letter BSEP 14-0122, dated November 20, 2014, within 180 days after NRC approval unless the 180th day falls within an outage window; then, in that case, completion of the implementation items, except item 9, shall occur no later than 60 days after startup from that particular outage. The licensee shall complete implementation of LAR Attachment S, Table S-2, Item 9, within 180 days after the startup of the second refueling outage for each unit after issuance of the safety evaluation.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1)

Maximum Power Level The licensee is authorized to operate the facility at steady state reactor core power levels not in excess of 2923 megawatts (thermal).

(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 340, are hereby incorporated in the license. Duke Energy Progress, LLC shall operate the facility in accordance with the Technical Specifications.

For Surveillance Requirements (SRs) that are new in Amendment 233 to Renewed Facility Operating License DPR-62, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 233. For SRs that existed prior to Amendment 233,

ML23317A346 NRR-106 OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME NJordan ABaxter DWrona NJordan (LHaeg for)