NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Revise Technical Specification 5.6.6 for Pressure and Temperature Limits Report
ML24095A317
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/04/2024
From: Samson Lee
NRC/NRR/DORL/LPL4
To: Richardson M
Pacific Gas & Electric Co
References
L-2024-LLA-0021
Download: ML24095A317 (3)


Text

From: Samson Lee Sent: Thursday, April 4, 2024 3:08 PM To: 'Richardson, Michael'

Subject:

Acceptance Review: Diablo Canyon request to revise Technical Specification 5.6.6 for pressure and temperature limits report (EPID: L-2024-LLA-0021)

By (PTLR)|letter dated February 28, 2024]] (Agencywide Documents Access and Management System (ADAMS) Accession No. ML24059A448), Pacific Gas and Electric Company (the licensee) submitted a license amendment request (LAR) to revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR), for Diablo Canyon Nuclear Power Plant, Unit 1 and 2 (Diablo Canyon). The LAR would revise the fluence calculational methodology used to determine the pressure and temperature limits. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed the licensees application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed change in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, the licensee will be advised by separate correspondence.

Based on the information provided in the licensees submittal, the NRC staff has estimated that this licensing request will take approximately 300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> to complete. The NRC staff expects to complete this review by April 4, 2025. If there are emergent complexities or challenges in the NRC staffs review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staffs initial review of the application and these estimates could change, due to several factors including complexity and uniqueness of the review, requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Samson Lee Diablo Canyon Project Manager Plant Licensing Branch 4 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-3168

Docket Nos. 50-275 and 50-323 Hearing Identifier: NRR_DRMA Email Number: 2454

Mail Envelope Properties (SA1PR09MB865333E92778524743ADC4269A3C2)

Subject:

Acceptance Review Diablo Canyon request to revise Technical Specification 5.6.6 for pressure and temperature limits report (EPID L-2024-LLA-0021)

Sent Date: 4/4/2024 3:07:42 PM Received Date: 4/4/2024 3:07:00 PM From: Samson Lee

Created By: Samson.Lee@nrc.gov

Recipients:

"'Richardson, Michael'" <MJRm@pge.com>

Tracking Status: None

Post Office: SA1PR09MB8653.namprd09.prod.outlook.com

Files Size Date & Time MESSAGE 3119 4/4/2024 3:07:00 PM