Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML22209A0602022-07-28028 July 2022 2022 Inservice Inspection Summary Report GNRO-2021/00014, Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency2021-06-0101 June 2021 Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency GNRO-2019/00014, Snubber Testing Program for Fourth Inspection Interval2019-03-13013 March 2019 Snubber Testing Program for Fourth Inspection Interval GNRO-2018/00054, Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval2018-11-30030 November 2018 Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval GNRO-2018/00047, Submittal of 2018 Inservice Inspection Summary Report2018-10-16016 October 2018 Submittal of 2018 Inservice Inspection Summary Report GNRO-2017/00039, Steam Dryer Visual Inspection Results for the First Two Scheduled Refueling Outages2017-06-30030 June 2017 Steam Dryer Visual Inspection Results for the First Two Scheduled Refueling Outages GNRO-2016/00033, Submittal of 2016 Inservice Inspection Summary Report2016-06-20020 June 2016 Submittal of 2016 Inservice Inspection Summary Report GNRO-2014/00043, Inservice Inspection Summary Report2014-06-12012 June 2014 Inservice Inspection Summary Report GNRO-2012/00110, Submittal of Inservice Inspection Summary Report2012-09-11011 September 2012 Submittal of Inservice Inspection Summary Report GNRO-2009/00070, Supplement to Request to Use Portion of Later Edition to the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants for Main Steam Safety Relief Valve Inservice Testing2009-12-14014 December 2009 Supplement to Request to Use Portion of Later Edition to the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants for Main Steam Safety Relief Valve Inservice Testing CNRO-2009-00002, Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval2009-03-0404 March 2009 Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval GNRO-2009/00004, Inservice Inspection Summary Report2009-01-19019 January 2009 Inservice Inspection Summary Report GNRO-2008/00071, Inservice Inspection (ISI) Program Third 10-Year Interval, Rev. 02008-10-29029 October 2008 Inservice Inspection (ISI) Program Third 10-Year Interval, Rev. 0 GNRO-2008/00057, Transmittal of Inservice Inspection Program Third 10-Year Interval, Revision 02008-07-31031 July 2008 Transmittal of Inservice Inspection Program Third 10-Year Interval, Revision 0 ML0815700022008-06-27027 June 2008 Relief Request GGNS-ISI-004 to Extend 2nd 10-Year Inservice Inspection Interval 4 Months Beyond 1-year Extension Allowed by ASME Code CNRO-2008-00016, Relief Requests for Third 120 Month Inservice Testing Interval2008-05-20020 May 2008 Relief Requests for Third 120 Month Inservice Testing Interval 1CAN030804, Revised Relief Request for 10 Year Update to the 120 Month Inservice Testing Interval, Arkansas Nuclear One, Unit 12008-03-13013 March 2008 Revised Relief Request for 10 Year Update to the 120 Month Inservice Testing Interval, Arkansas Nuclear One, Unit 1 CNRO-2007-00044, Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan2007-11-30030 November 2007 Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan CNRO-2007-00042, Entergy Operations, Inc. - Relief Requests for 10 Year Updates to the 120 Month Inservice Testing Intervals2007-11-29029 November 2007 Entergy Operations, Inc. - Relief Requests for 10 Year Updates to the 120 Month Inservice Testing Intervals GNRO-2007/00046, Inservice Inspection Summary Report2007-07-10010 July 2007 Inservice Inspection Summary Report GNRO-2006/00044, Corrections to Inservice Inspection Summary Report2006-08-10010 August 2006 Corrections to Inservice Inspection Summary Report GNRO-2006/00002, Lnservice Inspection Summary Report for Grand Gulf Nuclear Station Unit 12006-01-13013 January 2006 Lnservice Inspection Summary Report for Grand Gulf Nuclear Station Unit 1 GNRO-2004/00019, Transmittal of Inservice Inspection Summary Reports2004-03-0808 March 2004 Transmittal of Inservice Inspection Summary Reports ML0404901792003-12-18018 December 2003 to CEP-IST-2, Inservice Testing Plan, Entergy Nuclear South Central Engineering Programs GNRO-2003/00022, Boiling Water Reactor (BWR) Feedwater Nozzle Inservice Inspection Report for Grand Gulf Nuclear Station2003-04-0202 April 2003 Boiling Water Reactor (BWR) Feedwater Nozzle Inservice Inspection Report for Grand Gulf Nuclear Station CNRO-2003-00009, Entergy Operations, Referenced Paper for Request to Use ASME Code Case N-6632003-03-14014 March 2003 Entergy Operations, Referenced Paper for Request to Use ASME Code Case N-663 2024-06-11
[Table view] Category:Letter
MONTHYEARIR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 05000416/LER-2024-002, Automatic Actuation of Reactor Protection System2024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24130A0912024-05-0909 May 2024 Request for Information Letter License Renewal Phase 2 Inspection ML24128A1512024-05-0909 May 2024 Project Manager Assignment ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 ML24122C6112024-05-0101 May 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML24113A0972024-04-22022 April 2024 Annual Report of Individual Monitoring - NRC Form 5 for 2023 Per 1 0 CFR 20.2206 ML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24107B0402024-04-16016 April 2024 Notification by Entergy Operations, Inc., of Proposed Economic Performance Incentive and Reliance on Post-Event Improvements in Plant Procedures And/Or Methods of Operation in FERC ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24100A0692024-04-0909 April 2024 Report of Changes or Errors to 10 CFR 50.46 Analysis ML24094A0992024-04-0303 April 2024 (GGNS) Core Operating Limits Report (COLR) Cycle 25, Revision O ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams 05000416/LER-2024-001, High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close2024-03-27027 March 2024 High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 ML24058A3512024-02-28028 February 2024 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 05000416/LER-2023-002, Reactor Scram Due to Generator Stator Fault to Ground2024-02-13013 February 2024 Reactor Scram Due to Generator Stator Fault to Ground ML24043A1892024-02-12012 February 2024 Spent Fuel Storage Radioactive Effluent Release Report for 2023 ML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 IR 05000416/20234012024-01-18018 January 2024 Cyber Security Inspection Report 05000416/2023401 (Public) ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and 2024-09-09
[Table view] |
Text
Entergy Operations, Inc.
- ) entergy P.O. Box 756 Port Gibson, Mississippi 39150
Jeffery A. Hardy Manager Regulatory Assurance Grand Gulf Nuclear Statio n Tel: 802-380-5124
1 O CFR 50.55(a)
GNRO2024-00023
June 11, 2024
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
2024 lnservice Inspection Summary Report
Grand Gulf Nuclear Station, Unit 1 Docket Number 50-416 License Number NPF-29
Grand Gulf Nuclear Station, Unit 1 is submitting the lnservice Inspection Summary Report, OAR-1-00017, as required by Section XI of the American Society of Mechanical Engineers (ASME) Code. The report was prepared and submitted in accordance with the requirements of ASME Code Case N-532-5 as authorized by the Nuclear Regulatory Commission (NRC). The attached report contains an overall summary of lnservice Inspections performed from July 2022 to May 2024 which encompasses the Second Period of the Fourth Interval. The Second Period of the Fourth Interval began in December of 2020 and ends in November of 2024.
There are no commitments contained in this submittal. If you have any questions or need additional information, please contact Jeff Hardy, at 802-380-5124.
Sin9A i\\y,
JAH/ram
Attachment:
lnservice Inspection Summary Report OAR-1-00017 GNRO2024-00023 Page 2 of 2
cc: NRC Region IV - Regional Administrator NRC Senior Resident Inspector, Grand Gulf Nuclear Station State Health Officer, Mississippi Department of Health NRR Project Manager REPORT NUMBER OAR-1-00017
INSERVICE INSPECTION
SUMMARY
REPORT
FOR
GRAND GULF NUCLEAR STATION UNIT 1
BALD HILL ROAD
PORT GIBSON, MS. 39150
COMMERCIAL OPERATION DATE: JULY I, 1985
OWNER/OPERATOR
ENTERGY OPERATIONS, INC.
ECHELON ONE
P.O. BOX 31995
JACKSON, MS. 39286-1995
PREPARED BY
RESPONSIBLE ENGINEER ANII INSPECTOR
DOCUMENT COMPLETION FORM OAR-1 OWNER'S ACTIVITY REPORT
Report Number_---..:::O:c.:A...=;Ra..::.......a-l:....--=-00=0::..:1:....a7 ________________________ _
Plant_--"'G=-=-r=an=d=---=G=u=lf'-'. N'"-'--t=-1c=l=e=ai'---'* S=t=a=ti=o=n -=B=a=lcc=....l =--=H=i l"--I -=-R=o-=a=d,,....,P:....0=1-=-t -=G=i b=s=--=o=n,.,_. =M-=-=S=----=3::....::9_,1=5-=-0 ________ _
Unit No. ____ Commercial Service Date July l. 1985 Refueling Outage No._1,1 Current Inspection Interval _________ 4.,_1h ___________________ _
Current Inspection Period _________ 2="-d ___________________ _
Edition and Addenda of Section XI applicable to the inspection plans 2007 Edition/ 2008 Addenda
Date and revision of Inspection plans SEP-ISI-GGN-001, Rev. 12, Effective Date 12/8/2022: SEP-CISl-102, Rev. 6 Effective Date 6/7/2021.
Edition and Addenda of Section XI applicable to the repair/replacement activities, if different than the inspection plans
N/A Code Cases used: -'N'--'-'-5"-'3"-=2=--=5 ____________________________ _
CERTIFICATE OF CONFORMANCE
I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of RF24 conform to the requirements of Section XI.
R/R Coordinator: -~~---~~-~~----- Date: b-6-Vf
CERTIFICATE OF INSERVICE INSPECTION
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by Hartford Steam Boiler Insurance and Inspection of Hartford, CT, have inspected the items described in this Owners Activity Report and state that, to the best of my knowledge and belief, the Owner has performed all the activities represented by this report in accordance with the requirements of Section XI..
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or co~nected ~s inspection.
ANII Signature:~.../4..r~"Yz4/?. (Inspectors Signature)
Commissions: ltzs-(' ~11.if (National Board and Endorsement)
Date: t/t/zl/ '
TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE
Examination Category and Item Number Item Descrip tion Evaluation Descrip tion
No n e None None TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE
Date Repair/Replacement Code Class Item Description Description of Work ComP-leted Plan Number
None None None. None Non e