ML23362A057

From kanterella
Revision as of 18:25, 15 February 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRR E-mail Capture - Callaway Plant, Unit 1 - SUNSI Review of the Final Safety Analysis Report (FSAR) Revision OL-26
ML23362A057
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/28/2023
From: Mahesh Chawla
NRC/NRR/DORL/LPL4
To: Elwood T
Ameren Missouri
References
Download: ML23362A057 (2)


Text

From: Mahesh Chawla Sent: Thursday, December 28, 2023 10:06 AM To: Elwood, Thomas B

Subject:

Callaway Plant, Unit 1 - SUNSI Review of the FSAR Revision OL-26 By letter dated December 29, 2022 (Agencywide Documents Access and Management System Accession No. ML23067A139), Ameren Missouri (the licensee) submitted Revision OL-26 to the Callaway Plant, Unit 1 Final Safety Analysis Report (FSAR), as required by Title 10 of the Code of Federal Regulations, Section 50.71. The U.S. Nuclear Regulatory Commission (NRC) staff has performed a review of the FSAR to identify and remove sensitive, unclassified non-safeguards information (SUNSI) in accordance with agency policy for protecting SUNSI. The NRC staff reviewed information redacted by the licensee and has determined that the redactions do meet the criteria for SUNSI and will be withheld. However, during its review, the staff identified additional information that meets the SUNSI criteria and have redacted the following additional information:

Callaway Plant, Unit 1, Revision OL-26 to Final Safety Analysis Report, Chapter 1, Figures (slides 33 through 36, 38 through 45, and 47)

The above files with the additional redactions have been added to the ADAMS (ML23318A108) and will be made publicly available. The publicly available version of the Callaway Plant, Unit 1, FSAR Revision OL-26, can be located at ADAMS Accession No. ML23067A139 after NRC completes its review and processing steps.

If you have any questions about the additional redactions or the reasons for the redactions, please email me or call me.

Sincerely, Mahesh Chawla, Project Manager Licensing Branch, LPL4 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Phone: (301) 415-8371 Email: Mahesh.Chawla@nrc.gov

Hearing Identifier: NRR_DRMA Email Number: 2353 Mail Envelope Properties (SJ0PR09MB10405AB100C95E9D99B263DBBF19EA)

Subject:

Callaway Plant, Unit 1 - SUNSI Review of the FSAR Revision OL-26 Sent Date: 12/28/2023 10:05:33 AM Received Date: 12/28/2023 10:05:00 AM From: Mahesh Chawla Created By: Mahesh.Chawla@nrc.gov Recipients:

"Elwood, Thomas B" <TElwood@ameren.com>

Tracking Status: None Post Office: SJ0PR09MB10405.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1675 12/28/2023 10:05:00 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: