ML20054K364

From kanterella
Revision as of 07:17, 14 November 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notice of Deviation from Insp on 811024-1202
ML20054K364
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/29/1982
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20054K339 List:
References
50-302-81-23, NUDOCS 8207010477
Download: ML20054K364 (1)


Text

- - . - _ . ._ - . .

l APPENDIX B NOTICE OF DEVIATION 4

Based on the results of an NRC inspection conducted during the period October 24 to December 2,1981, it appears that one of your activities was not conducted in 1 conformance with your commitments to the commission as indicated below:

Final Safety Analysis Report (FSAR) section 7.1.2.2.3 specifies that the total worst case error produced in the reactor ' outlet temperature trip channel, which includes sensor, processing equipment and trip bistable

errors, will not exceed i 1.0*F.

l Contrary to the above, the procedure used to calibrate the reactor outlet temperature trip channel allows acceptance of a total error of 13.065"F.

This total includes a sensor error of 10.065*F, a process error of 12.5 F, and a bistable error of + 0.5 F. In addition, the + 3.065 F does not include the readability error of the signal converter meter used to calibrate the process equipment.

i i

i F207010477 820618

PDR ADOCK 05000302 O PDR

.. . - . _ - _ . _ - . . . - . _ - - - - .-_ - . . _ _ _ .. . . . .