. <W FEB 2 71967 s
\\
ENCLOSURE 2 NOTICE OF DEVIATION Florida Power Corporation Docket No. 50-302 Crystal River Unit 3 License No. DPR-72 The following deviation was identified during a Nuclear Regulatory Commission (NRC) inspection conducted on January 8 - February 5, 1987.
A letter to the Nuclear Regulatory Commission from Florida Power Corporation dated October 17, 1986, responded to violation 86-23-02 identified in NRC Inspection Report 50-302/86-23 and stated, in part, that a retest of the containment hydrogen monitoring system would be performed "...during the next cold shutdown of sufficient duration or prior to start up from the next refueling outage, whichever comes first". This response further stated that the test could only be conducted while the plant was in operational Modes 5 or 6.
Contrary to the above, as of February 5, 1987, this retesting had not been performed even though the plant was in a cold shutdown of sufficient duration during the periods of November 14-21, 1986 (a period of 7 days) and November 22 - December 23, 1986 (a period of 31 days).
Please provide in writing within 30 days of the date of this Notice, a descrip-tion of corrective actions regarding this deviation, actions to avoid further deviations, and the dates when these actions were or will be completed.
FOR THE NUCLEAR REGULATORY COMMISSION Original Signed by Luis A. Reyes Luis A. Reyes, Director Division of Reactor Projects Dated at Atlanta, Georgia this day of 19 8703230525 E70227 PDR ADOCK 05000302 O
.