ML20058E428
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML20058E428 | |
Person / Time | |
---|---|
Site: | South Texas |
Issue date: | 12/31/1989 |
From: | Grover J, Henninger W, Rubin K WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
To: | |
Shared Package | |
ML20058E414 | List: |
References | |
WCAP-12477, NUDOCS 9011070167 | |
Download: ML20058E428 (61) | |
Similar Documents at South Texas | |
---|---|
Category:REPORTS-TOPICAL (BY MANUFACTURERS-VENDORS ETC)
MONTHYEARML20206U5411999-05-18018 May 1999
[Table view]Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept ML20154A4451998-06-30030 June 1998 Non-proprietary Rev 2,addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diameter Tube Feedring-Type & W Preheater SGs Generic Sleeving Rept ML20112J0421996-06-30030 June 1996 Non-proprietary WCAP-14654, Specific Application of Laser Welded Sleeves for South Texas Power Plant Sgs ML20117K6411996-05-31031 May 1996 Non-proprietary South Tx Project - Unit 1 Tube Repair Criteria for ODSCC at Tube Support Plates ML20100B8281996-01-0404 January 1996 Nonproprietary STP Tube Repair Criteria for ODSCC at Tube Support Plate ML20081E0711995-03-10010 March 1995 Nonproprietary STP Tube Repair Criteria for ODSCC at Tsps ML20080T4421995-02-28028 February 1995 Nonproprietary W E-Series F* Qualification Rept ML20096H0021995-02-22022 February 1995 Nonproprietary W E-Series F* Qualification Rept ML20064N3001994-02-28028 February 1994 Setpoint Program Determination for Westinghouse Cold Overpressure Mitigating Sys in Houston Lighting & Power South Tx Units 1 & 2,Rev 2 ML20058E5801993-11-30030 November 1993 Nonproprietary Suppl 1 to NRC Bulletin 88-008 Evaluation of Auxiliary Piping for South Texas Project Units 1 & 2 ML20097G2811992-03-31031 March 1992 Evaluation of PTS for South Texas Unit 1 ML20059K8161990-08-31031 August 1990 Analysis of Capsule U from South Texas Unit 1 Reactor Vessel Radiation Surveillance Program ML20062D6221990-05-31031 May 1990 Nonproprietary NRC Bulletin 88-008:Evaluation of Auxiliary Piping for South Texas Project Units 1 & 2 ML20012A3211990-02-28028 February 1990 Nonpropietary Rev 1,Suppl 2 to Reconciliation of Fatigue Crack Growth Results for South Texas Project Unit 1 Surge Line. ML20058E4281989-12-31031 December 1989 Spray Additive Elimination Analysis for South Texas Project ML20235G6771989-02-28028 February 1989 Rev 1 to Suppl 1 to WCAP-12087, Addl Info in Support of Evaluations for Thermal Stratification of Pressurizer Surge Lines of South Texas Project Units 1 & 2 Nuclear Power Plants ML20245F2471988-12-0101 December 1988 Nonproprietary, NRC Update Meeting South Texas Bmi Flux Thimble Wear,881201 ML20154S8401988-08-10010 August 1988 NRC Update Meeting South Texas Bmi Flux Thimble Wear ML20207D7431988-06-30030 June 1988 Technical Bases for Eliminating RHR Line Rupture from Structural Design Basis for South Texas Project Units 1 & 2 ML20154J9831988-04-30030 April 1988 RCS Flow Anomaly Investigation Rept ML20147B2941987-12-31031 December 1987 Responses to NRC Questions Re Fast Response Narrow Range, Thermowell Mounted Resistance Temp Detectors ML20235F3541987-09-30030 September 1987 Technical Bases for Eliminating Rupture of Accumulator Line & Attached RHR Piping from Structural Design Basis for South Texas Project Units 1 & 2 ML20215B0161987-06-0101 June 1987 Full-Flow Filter Recovery & Equipment Assessment ML20215K7031987-05-31031 May 1987 Nonproprietary WCAP-11488, Westinghouse Setpoint Methodology for Protection Sys,South Texas Project ML20214P2441987-05-31031 May 1987 Nonproprietary Addl Info in Support of Elimination of Postulated Pipe Ruptures in Accumulator Lines of South Texas Power Project Units 1 & 2 (WCAP-11383/11351)(10-Inch & 8-Inch RHR Piping Attached to Accumulator Line) ST-HL-AE-2207, Errata 1 to Proprietary Rev 1 to WCAP-11273 & Nonproprietary WCAP -11488, Setpoint Methodology for Protection Sys1987-05-29029 May 1987 Errata 1 to Proprietary Rev 1 to WCAP-11273 & Nonproprietary WCAP -11488, Setpoint Methodology for Protection Sys ML20207R8351987-03-31031 March 1987 Nonproprietary Technical Bases for Eliminating Accumulator Class 1 Low Pressure Line Rupture as Structural Design Basis for South Texas Project Units 1 & 2 ML20211H0991987-01-31031 January 1987 Nonproprietary Technical Bases for Eliminating Class 1 Accumulator Line Rupture as Structural Design Basis for South Texas Project,Units 1 & 2 ML20213D7261986-10-31031 October 1986 Nonproprietary Cumulative Usage Factor Criterion for Break Postulation for South Texas Units 1 & 2 ML20206S4301986-09-30030 September 1986 Nonproprietary Addl Info in Support of Elimination of Postulated Pipe Ruptures in Pressurizer Surge Lines of South Texas Project Units 1 & 2 ST-HL-AE-1767, Comparison of Treat & Notrump Small Break LOCA Transient Results1986-09-22022 September 1986 Comparison of Treat & Notrump Small Break LOCA Transient Results ST-HL-AE-1681, Nonproprietary South Texas Project Leak-Before-Break Screening Criteria for High Energy Auxiliary Piping Sys1985-12-31031 December 1985 Nonproprietary South Texas Project Leak-Before-Break Screening Criteria for High Energy Auxiliary Piping Sys ML20129J7431985-06-30030 June 1985 Nonproprietary South Texas Plant (Tgx) Reactor Internals Flow-Induced Vibration Assessment ML20140A4651984-02-28028 February 1984 Technical Bases for Eliminating Pressurizer Surge Line Ruptures as Structural Design Basis for South Texas Project. Addl Info Encl ML20080B4951983-07-29029 July 1983 Nonproprietary Version of Independent Evaluation of Proposed Mods to Westinghouse D4,D5 & E Steam Generators ML20128Q0581978-06-30030 June 1978 Nonproprietary Addendum 1 to Analytical Rept for South Texas Project 1,Houston Lighting & Power Co ML20128Q0811977-10-31031 October 1977 Nonproprietary Analytical Rept for South Texas Project 1, Houston Lighting & Power Co ML20128Q1071977-07-31031 July 1977 Nonproprietary Vol 1, Analysis of Reactor Coolant Loop Piping, to Structural Analysis of Reactor Coolant Loop for South Texas Project Units 1 & 2 ML20128Q0721974-12-31031 December 1974 Nonproprietary Roto-Lok Closure Sys Development 1999-05-18 Category:TEXT-SAFETY REPORT MONTHYEARML20217K9441999-10-15015 October 1999
[Table view]SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With ML20217D0531999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20217D0481999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20212E5191999-08-31031 August 1999 Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 ML20210C9411999-07-31031 July 1999 Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With1999-07-15015 July 1999 LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With1999-06-28028 June 1999 LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With ML20196G5821999-06-23023 June 1999 LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with ML20206U5411999-05-18018 May 1999 Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept ML20206A7721999-04-30030 April 1999 STP Electric Generating Station Unit 1 Cycle 9 Colr NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with ML20205H0321999-03-31031 March 1999 Change QA-040 to Rev 13 of Operations QA Plan NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with ML20205A3781999-03-22022 March 1999 STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2 ML20204B2711999-03-15015 March 1999 Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With ML20207D1101999-02-24024 February 1999 Change QA-039 to Rev 13 of Operations QA Plan, for STP ML20203H8361999-02-17017 February 1999 Safety Evaluation Supporting Request for Relief from ASME Code Requirements for Class 3 Piping for Plant ML20202H9621999-02-0303 February 1999 SER Accepting Change to EALs Used in Classification of Emergency Conditions ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20216G2011999-01-31031 January 1999 City Public Svc of San Antonio Annual Rept 1998-1999 ML20199G5961999-01-31031 January 1999 Cycle 7 Voltage-Based Repair Criteria Rept for Jan 1999 ML20199K7711999-01-21021 January 1999 Safety Evaluation Accepting ISI Program Request for Relief for ASME Cose Repair Requirements for Code Class 3 Piping ML20199G8161999-01-19019 January 1999 SER Accepting Util 970707 Response to NRC 970509 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. NRC Finds No Significant Safety Hazards Based on Application of Util Ampacity Derating Methodology ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20216G2171998-12-31031 December 1998 Houston Industries 1998 Annual Rept. App a 1998 Financial Statements & Us Securities & Exchange Commission Form 10-K Encl NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With ML20216G1521998-12-31031 December 1998 Central & South West Corp 1998 Summary Annual Rept & Securities & Exchange Commission Form 10-K ML20198M3431998-12-28028 December 1998 SER Accepting Util Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping for South Texas Project,Unit 2 1999-09-09 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20058E428&oldid=3625721"