Letter Sequence Other |
---|
|
|
MONTHYEARML22322A1822022-11-18018 November 2022 Proposed Emergency Plan Revision - Relocation of the Technical Support Center Project stage: Request ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center Project stage: Other ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary Project stage: Request ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center Project stage: Other ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information Project stage: Response to RAI ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center Project stage: Approval ML24003A9022024-01-0303 January 2024 Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction Project stage: Request ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center Project stage: Approval 2023-05-31
[Table View] |
Similar Documents at Surry |
---|
Category:Audit Report
MONTHYEARML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23039A1822023-03-20020 March 2023 Tornado Classification of the Fuel Handling Trolley Support Structure Audit Summary ML22313A1592022-12-0202 December 2022 Regulatory Audit Summary Related to the License Amendment Request Turbine Building Wind Loading Basis Change ML22101A1522022-04-14014 April 2022 Regulatory Audit Report Regarding Request to Review Appendix E to Fleet Topical Report DOM-NAF-2 ML22089A0092022-04-13013 April 2022 Regulatory Audit Summary Related to the License Amendment Request to Change Loss-Of-Coolant Accident Chemical Buffer ML20272A2272020-10-23023 October 2020 Audit Summary: Proposed License Amendment Request for the Addition of Westinghouse Topical Report ML20058A0102020-03-0505 March 2020 Audit Proposed License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML20034F3302020-02-13013 February 2020 Regulatory Audit Report Regarding License Amendment Request for Small Break Loss of Coolant Accident Analysis Methodology ML19169A3292019-06-20020 June 2019 Report for the Site Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024) ML19128A0792019-05-30030 May 2019 Report for the in Office Regulatory Audit Regarding the Subsequent License Renewal Application Review (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024 ML19107A0212019-04-29029 April 2019 Summary of the Subsequent License Renewal Environmental Audit ML19107A0202019-04-16016 April 2019 Audit Need Update Tracking Spreadsheet ML19046A4332019-03-0404 March 2019 Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review (EPID: Nos. L-2018-RNW-0023 and L-2018-RNW-0024) ML16183A0212016-08-12012 August 2016 NRC Report for the Audit of Virginia Electric and Power Company'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1-Flooding for Surry Power Station, Units 1 and 2 ML15096A3912015-04-14014 April 2015 Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 ML14225A8002014-08-22022 August 2014 Audit of Virginia Electric and Power Company'S Management of Regulatory Commitments ML14002A1452014-02-19019 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML11355A0972012-01-23023 January 2012 Audit of Virginia Electric and Power Company'S Management of Regulatory Commitments ML0824000052008-09-25025 September 2008 Audit of Virginia Electric and Power Company'S Management of Regulatory Commitments ML0512303452005-04-25025 April 2005 Transmittal of Annual Radioactive Effluent Release Report for 2004 ML0511104892005-04-20020 April 2005 Audit of Virginia Electric and Power Company'S Management, April 20, 2005 2023-07-18
[Table view] Category:Letter
MONTHYEARML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20244032024-10-0303 October 2024 Cyber Security Inspection Report 05000280-2024403 and 05000281-2024403 Cover Letter (Public) IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure 2024-09-03
[Table view] |
Text
July 11, 2023 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
SURRY POWER STATION, UNITS 1 AND 2 - AUDIT
SUMMARY
FOR LICENSE AMENDMENT REQUEST - REVISION OF THE EMERGENCY PLAN TO SUPPORT RELOCATION OF THE TECHNICAL SUPPORT CENTER (EPID L-2022-LLA-0167)
Dear Mr. Stoddard:
By letters dated November 18, 2022 and May 31, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22322A182), and ML23167B007, respectively, Virginia Electric and Power Company (Dominion Energy Virginia, the licensee) submitted a license amendment request (LAR) to revise the Emergency Plan for Surry Power Station (SPS), Units 1 and 2. Specifically, the LAR proposed to relocate the Technical Support Center (TSC) from its current locations adjacent to the Main Control Room (MCR) to the building outside the Protected Area (PA) that were used previously as the site Local Emergency Operations Facility (LEOF).
To enhance the review of the licensees request, the U.S. Nuclear Regulatory Commission (NRC) staff conducted a site audit which was completed on June 14, 2023. The NRC staff performed the audit to examine the licensees non-docketed information, as needed, and the site configuration with the intent to gain a better understanding of the LAR, verify information, and to identify any information that may require docketing to support the NRCs basis for a licensing decision. A summary of the regulatory audit is enclosed. The audit was conducted in accordance with the audit plan that was provided to the licensee by letter dated May 10, 2023 (ML23117A095).
D. Stoddard If you have any questions, please contact me at (301) 415-5136 or via email at John.Klos@nrc.gov.
Sincerely,
/RA/
John Klos, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281
Enclosures:
- 1. Regulatory Audit Summary cc: Listserv
REGULATORY AUDIT
SUMMARY
TO SUPPORT REVIEW OF THE LICENSE AMENDMENT REQUEST TO SUPPORT RELOCATION OF THE TECHNICAL SUPPORT CENTER VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-280 AND 50-281
1.0 BACKGROUND
This audit was conducted with the intent to: (1) examine the plant configuration and evaluate any information not included in the submittal(s), (2) increase the U.S. Nuclear Regulatory Commission (NRC) staffs understanding of the license amendment request (LAR), and (3) identify any information that may require docketing to support the NRC staffs regulatory finding.
By letters dated November 18, 2022 and May 31, 2023 (Agencywide Documents Access and Management System Accession No. ML22322A182), and ML23167B007, respectively, Virginia Electric and Power Company (Dominion Energy Virginia, the licensee) submitted a license amendment request (LAR) for the Surry Power Station, Units 1 and 2 (Surry). The amendment proposed to relocate the Technical Support Center (TSC) from its current location adjacent to the Main Control Room (MCR) to the building outside the Protected Area (PA) that were used previously as the site Local Emergency Operations Facility (LEOF).
The NRC staff performed a preliminary review of the LAR and determined that a regulatory audit would assist in reviewing the licensees LAR and timely completion of the review. The regulatory audit was performed consistent with NRC Office of Nuclear Reactor Regulation Office Instruction LIC-111, Revision 1, Regulatory Audits, dated October 31, 2019 (ML19226A274).
2.0 AUDIT ACTIVITIES The NRC staff conducted a site audit and walkdown of the plant configuration to support the LAR on June 14, 2023. An audit plan was provided to the licensee by letter May 10, 2023 (ML23117A095) which contained the subject areas, an outlined schedule, logistics for the audit and a detailed checklist for the system/plant walkdown (Appendix A of the audit plan).
The list of documents that were examined by the audit team is provided in Section 4.0 below.
The audit activities were comprised of accessing the facilities for the staffs review and a walkdown of the existing TSC and the proposed TSC, with licensee representatives from operations, engineering, facilities, and emergency preparedness.
Enclosure
3.0 AUDIT TEAM The NRC audit team members:
Michael Norris, Team Leader and Senior Emergency Preparedness Specialist Kenneth Mott, Emergency Preparedness Specialist John Klos, Project Manager
4.0 DESCRIPTION
OF AUDIT ACTIVITES AND
SUMMARY
OF OBSERVATION Site Audit and Facility/System Walkdown On June 14, 2023, the NRC staff participated in a detailed discussion of the above topics in the audit plan and completed a walkdown of related facility/systems discussed in the LAR. The site walkdown was sufficient to support completing the NRC staff review. During the audit exit meeting, the NRC staff indicated that there will no requests for additional information (RAIs) related to the site audit. Detailed review of the LAR submittal and its supplement and supporting engineering and technical information is ongoing and may require RAIs.
5.0 AUDIT CONCLUSION The site audit was completed on June 14, 2023.
ML23173A060 *by email OFFICE NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NRR/DRO/IOLB/(A) BC NAME JKlos KGoldstein KMiller DATE 06/21/2023 06/23/2023 06/26/2023 OFFICE NSIR/RLB/(A)BC NRR/DORL/LPL2-1/BC NRR/DORL/LPL2-1/PM NAME MNorris for JQuichocho MMarkley JKlos DATE 06/26/2023 07/06/2023 07/11/2023