MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station ML20148K4161997-05-31031 May 1997 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20141B9631997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Pilgrim Nuclear Power Station ML20137T5631997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Pilgrim Nuclear Power Station ML20136G7791997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Pilgrim Nuclear Power Station ML20138K5811997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Pilgrim Nuclear Power Station ML20133G5831996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Pilgrim Nuclear Power Station BECO-96-106, Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-097, Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Pilgrim Nuclear Power Station ML20128N2611996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-083, Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr1996-08-31031 August 1996 Monthly Operating Rept for Pilgrim Nuclear Power Station for Aug 1996 Ltr ML20116L0841996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-066, Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-056, Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Pilgrim Nuclear Power Station ML20117E0961996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-034, Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-023, Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-008, Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Pilgrim Nuclear Power Station BECO-LTR-96-004, Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Pilgrim Nuclear Power Station ML20095E7351995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Pilgrim Nuclear Power Station Unit 1 BECO-LTR-95-116, Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Pilgrim Nuclear Power Station ML20093F5221995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-097, Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-081, Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Pilgrim Nuclear Power Station BECO-LTR-95-071, Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant1995-06-30030 June 1995 Monthly Operating Rept for June 1995 for Pilgrim Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20212C2921999-09-16016 September 1999 SER Accepting Licensee Request for Relief from ASME Code Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Pilgrim Nuclear Power Station ML20216F3511999-09-0808 September 1999 ISI Summary Rept for Refuel Outage 12 at Pnps ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209C4731999-07-0707 July 1999 Addendum to SE on Proposed Transfer of Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generation Co ML20209H8251999-07-0101 July 1999 Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20196H2451999-06-29029 June 1999 SER Denying Licensee Proposed Alternative in Relief Request PRR-13,rev 2.Staff Determined That Proposed Alternative Provides Insufficient Info to Determine Adequacy of Scope of Implementation ML20209A8901999-06-28028 June 1999 SER Accepting Licensee Proposed Alternative to Use Code Case N-573 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209B9861999-06-23023 June 1999 Rev 13A to Pilgrim Nuclear Power Station COLR for Cycle 13 ML20217N9061999-06-21021 June 1999 Rept of Changes,Tests & Experiments for Period of 970422-990621 ML20195K3431999-06-15015 June 1999 Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water System Piping for Plant ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20207E7471999-05-27027 May 1999 Safety Evaluation Granting Request Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of HWC to License DPR-35 ML20206M1971999-05-11011 May 1999 SER Accepting Request for Approval to Repair Flaws in ASME Code Class 3 Salt Svc Water Piping at Plant ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207J5471999-03-0909 March 1999 Training Simulator,1999 4-Yr Certification Rept ML20207F9401999-03-0101 March 1999 Long Term Program Semi-Annual Rept for Pilgrim Nuclear Power Station ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20196E2151998-12-31031 December 1998 1998 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20153D3901998-09-22022 September 1998 Safety Evaluation Granting 970707 Request to Use Guidance in GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Pilgrim Nuclear Power Station ML20197C5011998-09-0404 September 1998 Rev 12C,Pages 4 & 5 to Pilgrim Nuclear Power Station Colr ML20197C5471998-08-31031 August 1998 Rev 12C to Pilgrim Nuclear Power Station Colr ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237E2251998-08-26026 August 1998 Suppl & Revs to SE for Amend 173 for Pigrim Nuclear Power Station ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236U8201998-07-13013 July 1998 Rev 12B to Pilgrim Nuclear Power Station COLR (Cycle 12) ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20207B7601998-03-31031 March 1998 Final Rept, Pilgrim Nuclear Power Station Site-Specific Offsite Radiological Emergency Preparedenss Prompt Alert & Notification System Quality Assurance Verification, Prepared for FEMA ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20216J3741998-03-19019 March 1998 Safety Evaluation Accepting Licensee Request to Evaluate Elevated Tailpipe Temp on Safety Relief Valve SRV 203-3B ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20236M8511997-12-31031 December 1997 1997 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station ML20202D5761997-11-0808 November 1997 1997 Evaluated Exercise BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217D6431997-10-0101 October 1997 Safety Evaluation Granting Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Class 3 SSW Piping for Pilgrim ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station 1999-09-08
[Table view] |
Text
. . . . . - . . - . . - . .
's , -
Tech. Spic. 6.9.A.2 s
Boston Edison Pilgnm Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360 L J. Olivier !
Vice President Nuclear Operations July 11, 1996 ;
and Staton Director BECo Ltr. #96- 066 ,
i
[
. U.S. Nuclear Regulatory Commission ;
Attention: Document Control Desk '
Washington, DC 20555 i Docket No. 50-293 +
License No. DPR-35 i f
JUNE 1996 MONTHLY REPORT l
In accordance with Pilgrim Nuclear Power Station Technical Specification 6.9.A.2, a copy of the :
Operational Status Summary for Pilgrim Nuclear Power Station is attached for your information and .
planning. Should you have any questions concerning this report, please contact me directly.
Law l
. J. Olivier i
- RLC/dmc/9458 )
Attachment cc: Mr. Thomas T. Martin Regional Administrator, Region i U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector I
)
I i
i t
9607150229 960630 l PDR ADOCK 05000293
- R PDR i
$$ {
l I
OPERATING DATA REPORT DOCKET NO. 50-293 NAME: Pilarim COMPLETED BY: R.L. Cannon TELEPHONE: (508) 830-8321 REPORT MONTH June 19%
OPERATING STATUS NOTES
- 1. Unit Name Pilgrim 1
- 2. Reporting Period June 1996
- 3. Licensed Thermal Power (MWt) 1998
- 4. Nameplate Rating (Gross MWe) 678
- 5. Design Electrical Rating (Net MWe) 655
- 6. Maximum Dependable Capacity (Gross MWe) 6_96,
- 7. Maximum Dependable Capacity (Net MWe) 670 G. If Changes Occur in Capacity Ratings (Item Number 3 Through 7) Since Last Report, Give Reasons:
No Chanaes
- 9. Power Level To Which Restricted, if Any (Net MWe): None
- 10. Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 720.0 4367.0 206519.0
- 12. Hours Reactor Critical 720.0 4252.5 130518.6
- 13. Hours Reactor Reserve Shutdown 0.0 0.0 0.0
- 14. Hours Generator On-Line 720.0 4233.9 126057.8
- 15. Hours Unit Reserve Shutdown 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1397769.0 8249008.0 224551178.0
- 17. Gross Electrical Energy Generated (MWH) 472680.0 2829760.0 76107084.0
- 18. Net Electrical Energy Generated (MWH) 454763.0 2727542.0 73171164.0
- 19. Unit Service Factor 100.0 97.0 61.0
- 20. Unit Availability Factor 100.0 97.0 61.0 ,
- 21. Unit Capacity Factor (Using MDC Net) 94.3 93.2 52.9
- 22. Unit Capacity Factor (Using DER Net) 96.4 95.4 54.1
- 23. Unit Forced Outage Rate 0.0 0.0 11.6 i
- 24. Shutdowns Scheduled Over Next 6 Months I (Type, Date, and Duration of Each)- NONE PLANNED J
- 25. If Shutdown at End of Report Period, l Estimated Date of Startup - UNIT OPERATING l l
l I
4e AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-293 NAME: Pilarim COMPLETED BY: R.L. Cannon TELEPHONE: (508) 830-8321 REPORT MONTH June 19%
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 654 17 652 2 654 18 650 3 654 19 651 4 655 20 651 ;
5 656 21 646 6 654 22 650 'i 7 6'- 23 651 1
8 655 24 650 9 655 25 652 10 654 26 648 11 653 27 650 12 655 28 643 13 655 29 612 14 624 30 564 15 298 16 550 This format lists the average daily unit power level in MWe-Net for each day in the reporting month, computed to the nearest whole megawatt.
OPERATIONAL
SUMMARY
DOCKET NO. 50-293 NAME: Pilorim COMPLETED BY: R.L. Cannon TELEPHONE: (508) 830-8321 REPORT MONTH June 1996 Tha unit started the reporting period at 100% core thermal power (CTP) where it was maintained until 2002 hours0.0232 days <br />0.556 hours <br />0.00331 weeks <br />7.61761e-4 months <br /> on June 14,1996. At thet time, reactor power was reduced to approximately 50% CTP in support of a backwash of the main condenser and rod scram testing. At 0320 hours0.0037 days <br />0.0889 hours <br />5.291005e-4 weeks <br />1.2176e-4 months <br /> on June 16,1996, power ascension to 100% CTP commenced. At 1122 hours0.013 days <br />0.312 hours <br />0.00186 weeks <br />4.26921e-4 months <br /> on June 16, 1996, 100 % CTP was achieved. The unit was maintained at approximately 100% CTP until 2130 hours0.0247 days <br />0.592 hours <br />0.00352 weeks <br />8.10465e-4 months <br /> on June 29, 1996, when the unit power was reduced to approximately 50% CTP to support back washing of the main condenser. At 0130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> on June 30, 1996, 50 % CTP was achieved. At 0227 hours0.00263 days <br />0.0631 hours <br />3.753307e-4 weeks <br />8.63735e-5 months <br /> on June 30,1996, the main condenser backwash was complete. At 0236 hours0.00273 days <br />0.0656 hours <br />3.902116e-4 weeks <br />8.9798e-5 months <br />, on June 30,1996, power ascension began. At 0831 hours0.00962 days <br />0.231 hours <br />0.00137 weeks <br />3.161955e-4 months <br /> on June 30,1996, 100% core thermal power was achieved.
SAFETY RELIEF VALVE CHALLENGES MONTH OF JUNE 1996 Requirement: NUREG-0737 T.A.P. II.K.3.3 Thnre were no safety relief valve challenges during the reporting period.
An SRV challenge is defined as anytime an SRV has received a signal to operate via reactor pressure signal (ADS) or control switch (manual). Reference BECo Ltr. #81-01 dated January 5,1981.
1 l
l !
j i
i k j l
I
\
REFUELING INFORMATION ,
DOCKET NO. 50-293 NAME: Pilarim i COMPLETED BY: R.L. Cannon TELEPHONE: (508)830-8321 !
REPORT MONTH June 1996 i Tha following refueling information is included in the Monthly Report as requested in an NRC letter to BECo, dit:d January 18,1978:
l For your convenience, the information supplied has been enumerated so that each number corresponds to ;
equivalent notation utilized in the request. i
- 1. The name of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.
l
- 2. Scheduled date for next re'aeling shutdown: February 1,1997.
- 3. Scheduled date for restart following next refueling: March 14,1997.
- 4. Due to their similarity, requests 4, 5, & 6 are responded to collectively under #6.
t 5.' See #6.
l 6. The new fuel loaded during the 1995 refueling outage (RFO-10) is of a different design than that j loaded in the previous refueling outage and consists of 136 riew fuel assemblies. '
- 7. (a) There are 580 fuel assemblies in the core.
~
(b) There are 1765 fuel assemblies in the spent fuel pool.
- 8. (a) The station is presently licensed to store 3859 spent fuel assemblies. The spent fuel storage i i capacity is 2891 fuel assemblies. However,23 spent fuel locations cannot be used due to !
refuel bridge limitations. ,
(b) The planned spent fuel storage capacity is 3859 fuel assemblies. l
- 9. With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 1103 fuel assemblies.
t i
i
- : y PILGRIM NUCLEAR POWER STATION MAJOR SAFETY RELATED MAINTENANCE !
4 DOCKET NO. '50-293 :
NAME: Pilarim COMPLETED BY: R.L. Cannon TELEPHONE: (508) 830-8321 ,
REPORT MONTH June 1996 >
- SYSTEM COMPONENT MALFUNCTION CAUSE MAINTENANCE CORRECTIVE ASSOCIATED '
ACTION TO LER ,
i
~
PREVENT' RECURRENCE j No major safety related maintenance was completed during this reporting period. ;
a s I
i )
I l
t i
t w s- -a-_ - e- awu e e m+www-4 gwwe w,w-m e > tw', w =ee- -i -ero we se-um -- == tem re e- atw-e . -w e e+'ae-ee,-<*aww e- so- + esp-9a wwee v-e+--W,sp s+ se-e---v -smS- e- emr mi me-?- en v v 4e %-a. --*~e--w-,-m-,-+---s= -- a
- +
UNIT SHUTDOWNS' AND POWER REDUCTIONS DOCKET NO. 50-293 NAME: Pilarim COMPLETED BY: R.L. Cannon TELEPHONE: (508) 830-8321 REPORT MONTH June 1996 l METHOD OF LICENSE SYSTEM COMPONENT CAUSE & CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO PREVENT NO. DATE 1 (HOURS) 2 REACTOR REPORT 4 5 RECURRENCE 15 06/14/96 S 0.0 B N/A N/A N/A N/A Planned down power to conduct a main condenser back wash and surveillance testing.
16 06/29/96 F 0.0 B N/A N/A N/A N/A Unplanned down power to conduct main condenser back wash.
i 1 2 3 4&5 F-Forced A-Equip Failure 1-Manual Exhibit F & H S-Sched B-Main or Test 2-Manual Scram instructions for C-Refueling 3-Auto Scram Preparations of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Ucensee Event Report
& License Examination 9-Other (LER) File (NUREG-1022)
F-Admin G-Operator Error H-Other