ML17266A259

From kanterella
Revision as of 04:55, 26 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
LER 80-036/03L-0:on 800805,During Full Power Operation, Control Element Assembly 23 Dropped to Full Insertion.Caused by Failure in Core Element Assembly Core Power Programmer 15-volt Power Supply.Power Supply Replaced
ML17266A259
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/03/1980
From: PACE P L
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17208A984 List:
References
LER-80-036-03L, LER-80-36-3L, NUDOCS 8009150290
Download: ML17266A259 (1)