ML20059G545

From kanterella
Revision as of 07:00, 2 June 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of Significant Licensee Meeting W/Util on 940118 in Atlanta,Ga to Conduct Enforcement Conference on EOPs (Revised Date)
ML20059G545
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/12/1994
From: Landis K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 9401240222
Download: ML20059G545 (3)


Text

.-

, l JAN 121994 NOTICE OF SIGNIFICANT MEETING Name of Licensee: Florida Power Corporation Name of Facility: Crystal River 3 Docket Number: 50-302 Date and Time of Meeting: January 18, 1994, at 1:00 p.m.

Location of Meeting: NRC Region II Office, Atlanta, GA Purpose of Meeting: Enforcement Conference to Discuss Emergency Operating 1 Procedures (Revised Date)

RII Cognizant Division: Division of Reactor Safety NRC Attendees:

S. D. Ebneter, Regional Administrator, Region II (RII)

L. A. Reyes, Deputy Regional Administrator, RII A. F. Gibson, Director, Division of Reactor Safety (DRS), RII J. P. Jaudon, Deputy Director, DRS, RII E. W. Merschoff, Director, Division of Reactor Projects (DRP), RII J. R. Johnson, Deputy Director, DRP, RII H. N. Berkow, Director, Project Directorate 11-2, DRP-I/II, Office of Nuclear Reactor Regulation (NRR)

T. A. Peebles, Chief, Operations Branch, DRS, RII L. L. Lawyer, Chief, Operator Licensing Section 1 (0LS1), DRS, RII H. V. Sinkule, Chief, Reactor Projects Branch 2, DRP, RII K. D. Landis, Chief, Reactor Projects Section 2B (RP28), DRP, RII B. Uryc, Acting Director, Enforement and Investigation Coordination Staff, RII C. F. Evans, Regional Counsel, RIT H. Silver, Project Manager, Project Directorate 11-2, NRR G. T. Hopper, Reactor Engineer, OLSI, DRS, RII J. H. Bartley, Reactor Engineer, OLSI, DRS, RII A. R. Long, Project Engineer, RP2B, DRP, RII Licensee Attendees:

P. Beard, Jr., Senior Vice President, Nuclear Operations G. Boldt, Vice President, Nuclear Production B. Hickle, Director, Nuclear Plant Operations L. Kelly, Director. of Tr'aining K. Wilson, Manager, Nuclear Licensing G. Halnon, Manager, Nuclear Plant Operations R. Tyrie, Assistant Nuclear Shift Supervisor 9401240222 940112 T \

PDR ADOCK 05000302 p PDR "

TFN$

i i

, e*

Notice of Significant Meeting 2 JAN I 21994 NOTE: Attendance by NRC personnel at this meeting should be made known by l 4:00 p.m., January 14, 1994, via telephone call to K. D. Landis, (404) J 331-5509.

Approved by: MhM Q mL g

K.,p. Landis, Chjef Reactor Projecti Section 2B Division of Reactor Projects Distribution: T. E. Murley, Director, Office of Nuclear Reactor Regulation (NRR)

J. H. Sniezek, Deputy Executive Director for Nuclear Reactor ,

Regulation, Regional Operations and Research J. Lieberman, Director, Office of Enforcement L. J. Chandler, Assistant General Counsel for Hearings and Enforcement H. L. Thompson, Jr., Deputy Executive Director for Nuclear Materials Safety, Safeguards and Operations Support L. J. Callan, Associate Director for Projects, NRR S. A. Varga, Director, Division of Reactor Projects I/II, NRR H. N. Berkow, Director, Project Directorate II-2, NRR H. Silver, Project Manager, Crystal River, NRR L. R. Plisco, Regional Coordinator, ED0 bec: S. D. Ebneter .R. C. Butcher, SRI, Crystal River L. A. Reyes A. R. Long A. F. Gibson C. F. Evans J. P. Stohr R. J. Maley E. W. Herschoff G. R. Jenkins J. R. Johnson K. M. Clark M. V. Sinkule All NRC Attendees K. D. Landis Docket File

  • SEE PREVIOUS CONCURRENCE PAGE FOR SIGNATURES.
  • RII:DRP
  • RII:DRP
  • RII:DRP II:D P
  • RII:DRS RII:DR S Along Klandis MSinkule lho AGibson JJ hr 01/ /94 01/ /94 01/ /94 -

4 01/ /94 01 /94

  • RII:EICS
  • RII:0RA Buryc CEvans  ;

01/ /94 01/ /94

/

Notice of Significant Meeting 2 NOTE: Attendance by NRC personnel at this meeting should be made known by 4:00 p.m., January 14, 1994, via telephone call to K. D. Landis, (404) 331-5509.

Approved by:

K. D. Landis, Chief Reactor Projects Section 2 Division of Reactor Pro ts ,

Distribution: T. E. Murley, Director, Office of Nu ear Reactor Regulation (NRR)

J. H. Sniezek, Deputy Executiv irector for Nuclear Reactor Regulation, Regional Op ions and Research J. Lieberman, Director, fice of Enforcement L. J. Chandler, Assi nt General Counsel for Hearings and Enforcement H. L. Thompson r., Deputy Executive Director for Nuclear Material afety, Safeguards and Operations Support

,T. E. Mu y, Director, Office of Nuclear Reactor Regulation

'd . Pa d obb. Associate Director for Projects, NRR

' car-Varga7 Director, Division of Reactor Projects I/II, NRR H. N. Berkow, Director, Project Directorate 11-2, NRR H. Silver, Project Manager, Crystal River, NRR L. R. Plisco, Regional Coordinator, EDO cc: S. D. Ebneter R. C. Butcher, SRI, Crystal River  :

L. A. Reyes A. R. Long ,

A. F. Gibson C. F. Evans J. P. Stohr R. J. Maley E. W. Herschoff G. R. Jenkins J. R. Johnson K. M. Clark M. V. Sinkule All NRC Attendees K. D. Landis Docket File RII:DRP RII:DRP RII:DRP RII:DRP RII: S RII:DRSS I

mtt g@

Along Klandis MSinkule EMerochof JStohr 01/-) /94 01/10 /94 01/(p/94 Olf /94, ; % i son 01/ /94 Olft/94

/ i MSBpyc

"[jl "^

CEvans w/gt/94 01/11/94 i

t m..