Forwards Application for Amend to License DPR-59,changing Tech Spec 4.12.F.1.a to Provide 3-month Extension Until 920515 to Complete Fire Barrier Penetration Seal Visual Insp
ML20086Q413
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/19/1991
From: Ralph Beedle
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086Q416 List:
References
JPN-91-069, JPN-91-69, NUDOCS 9112300179
Download: ML20086Q413 (2)


Text

__

w ..a,  !

wente Pia,nt f ev wn619001 1

  • 914 (.bl 684ti o

i

, #> NewYorkPower n.in u a.... 1 i 4sf Authority M3:M % r "' i' December 19,1991 JPN 91009 i

U. S. Nuclear Regulatory Commission 1 ATTN: Document Control Desk Mall Station P1137 Washington. D.C. 20555 ,

i St>BJECT: James A. FitzPatrick Nuclear Power Plant  ;

a Docket No. 50 333  :

Proposed Changes to the Technical Specifications Onetime Extension of Fire Barrier Penetration Surveillanceinterval(JPTS 91030)

REFERENCE:

1. NYPA lotter, R.E. Boedle to U.S. NRC, dated September 13,1991, (JPN 91050), regarding i schedule for long term fire protection actions.  !

f 4

Dear Sir:

T This application for an amendment to the James A. FitzPatrick Technical Spochications requests an extension to the fire barrier penetration surveillance interval.

Technical Specification 4.12.F.1.a requires that fire barrier penetration' seals be visually ,

inspected once every 18 months. The Authority is requestirip a 3 month extension until -

May 15,1992 to completo these fire banler inspections. This would_bo a onetimo extonslon for the current interval only, At an August 2,1991 meeting with the NRC's Region I staff, the New York Power  :

Authoilty committed to complete a full baseline ber'or seal inspection not later than 30 '

days after startup from the 1993 refuel outage (Reic49nce 1). The Authority accelerated -

its baseline irspection schedule by 18 months to run concurrently with the fire barrier -

ponotration seal Inspections required by Technical Specifications 4.12.F.1.a. Each of -  ;

those inspections takes longer because the baseline inspection requirements are moro

~

detalled than those previously employed at FitzPatrick. The first fire barrier penetration soal was inspected on November 8,1991. .-

Enclosed for filing is the signed original of a document entitled." Application for Amondment to Operating Ucense," with Attachments I and ll thereto, comprising a - ,

statomont of the proposed change to the Technical Specifications and the associated Safety Evaluation. '

f 9112300179 911219 Ih ['

PDR- ADOCK 0500o333 r' PDR

(

-MY

\)P l g

. , , ~ . . - - , , - - . . , _ . . . . _ . , , , , , , , _ _ . _ , - ~ . .,....,_%._.~ -

in acxrdance with 10 CFR 50.91, a copy of this application and tho associated attachmonts aro boing providod to tho designated Now York Stato official.

Should you or your staff have any questions rogarding the proposod changes, pleaso contact Mr. J. A. Gray, Jr.

Vory tr yours.,

h -

Ralph E. Bo [dlo'[/

M Exocutivo Vibe-Prosident Nuclear Gonoration att: as stated cc: Roglonel Administrator U. S. Nucloar Rogulatory Commission 475 Allondalo Road King of Prussia, PA 19406 Offico of the Resident inspoctor U. S. Nuclear Rogulatory Commission P. O. Box 130 Lycoming, NY 13093 Mr. Brian C. McCabo Project Diroctorato 11 Division of Reactbr Piojects 1/11 U. S. Nucioar Regulatory Commission Mall Stop 14 02 Washington, D.C. 20555 Ms. Donna Ross Now York Stato Enorgy Offico 2 Empiro Stato Pla'a 16thFloor Albany, NY 12223 1