ML20092M927

From kanterella
Revision as of 02:03, 25 September 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Proprietary and non-proprietary WCAP-13221 & WCAP-13222,respectively, Steam Generator Tube Alternate Plugging Criteria Presentation Matls. WCAP-13221 Withheld
ML20092M927
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/24/1992
From: Woodward J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20034D266 List:
References
NUDOCS 9202280232
Download: ML20092M927 (2)


Text

Som>them Nxvav Operatng Company Post O*ce Das 12n 8,rangham. Alabama 35001 Te:ephone 205 8SS 5086 n

J.o. woodard Southem Nudear Operating Company

@M$f February 24, 1992 **""**W'"

Docket No. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Joseph M. Farley Nuciear Plant Steam Generator Tuh support Plate Alternate Pluaqina Criteria

Dear Sirs:

In a letter dated January 29, 1992, the NRC Staff indicated to Southern Nuclear Operating Company that the stuam generator tube support plate alternate plugging criteria amendment would not be approved prior to the upcoming Unit 2 Spring 1992 outage. At that time, the Staff indicated that a more conservative submittal might be approved on a one cycle basis. On February 6, 1992, Southern Nuclear met with the NRC Staff to discuss a proposed interim plugging criteria and to respond to Staff questions concerning the alternate plugging criteria.

Attached are copies of Westinghouse slides used in presentations at that meeting. These copies are provided as:

1. WCAP-13221 - Steam Generator Tube Alternate Pluggiag Criteria Presentation Materials (Proprietary).
2. WCAP-13222 - Steam Generator Tute Alternate Plugging Criteria Presentation Materials (Non-Proprietary).

As the Staff requested, the voltage / burst and voltage / leakage correlations for 3/4 inch tubes are being compiled into a separate WCAP. Included in that WCAP is one method which could be used to combine the 3/4 inch and 7/8 inch tube data. This methodology is not necessarily the most correct manner to combine the data.

Unfortunately, time constraints have precluded further evaluation of the data. This WCAP will be forwarded to the NRC Staff separately as soon as-it is received from Westinghouse.

Also enclosed are a Westinghouse authorization letter, CAW-92-272, accompanying affidavit, Proprietary Information Notice, and Copyright Notice. As Item 1 contains information proprietary to Westinghouse Electric Corporation, it is supported by an affidavit signed by I

,,b \

~c0000,( .

(

9202280232 920224 ., ,

l.d f $,td I.

DR ADOCK 0500 B lj,

  • k'L$ /b/l -

/ if' A'Al& I /Al

t U.S. Nuclear-Regulatory Commission- Page_2 Westinghouse, the owner of the information. - The affidavit sets forth the basis on which the information may be withheld from public

' disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of Section 2.790 of the Commission's-regulations.

Accordingly,-it is respectfully requested that the information which  ;

is proprietary to Westinghouse be withheld from public disclosure in accordance with 10 CFR Section 2.790 of the Commission's regulations.

Correspondence with respect to the copyright or_ proprietary aspects of the items listed above or the supporting Westinghouse Affidavit should reference CAW-92-272 and should be addressed to R. P. DiPiazza, Manager of Nuclear Safety Licensing, Westinghouse Electric Corporation,_P. O. Box 355, Pittsburgh, Pennsylvania 15230-0355.

If there are any questions, please advise.

Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY

, D.b

.~Woodard re-t - k '

JDW/ REM: map Attachments cc: Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell 1

~'

, , , - . - , - - , . , . . , - - , , , , , - - -