Letter Transmitting Draft SE of Traveler TSTF-582, Revision 0, RPV WIC Enhancements
ML20133J883
Person / Time
Site: Technical Specifications Task Force
Issue date: 07/29/2020
From: Victor Cusumano
NRC/NRR/DSS/STSB
To:
Technical Specifications Task Force
Honcharik, M., NRR/DSS, 301-415-1774
Shared Package
ML20133J884 List:
References
EPID L-2019-PMP-0199
Download: ML20133J883 (3)


Text

July 29, 2020 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852

SUBJECT:

DRAFT SAFETY EVALUATION OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-582, REVISION 0, RPV WIC ENHANCEMENTS (EPID L-2019-PMP-0199)

Dear Members of the Technical Specifications Task Force:

By letter dated August 28, 2109 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19240A260), the Technical Specifications Task Force (TSTF) submitted to the U.S. Nuclear Regulatory Commission (NRC) for review and approval Traveler TSTF-582, Revision 0, RPV [Reactor Pressure Vessel] WIC [Water Inventory Control]

Enhancements. The NRC staffs draft safety evaluation (SE) of the traveler is enclosed; the model SE will be issued at a later date.

Two weeks are provided for you to comment on any factual errors or clarity concerns contained in the enclosed draft SE. The final SE will be issued by August 28, 2020, after making any necessary changes. To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft SE showing proposed changes and provide a summary table of the proposed changes.

If you have any questions, please contact Michelle Honcharik at 301-415-1774 or via e-mail at Michelle.Honcharik@nrc.gov.

Sincerely, Digitally signed by Victor Victor Cusumano Date: 2020.07.29 Cusumano 11:30:22 -04'00' Victor G. Cusumano, Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753

Enclosure:

Draft Traveler SE cc: See next page

Technical Specifications Task Force Project No. 753 cc:

Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.

Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 E-mail: jmiksa@entergy.com Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 E-mail: jordan.vaughan@duke-energy.com Ryan M. Joyce Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-274-EC Birmingham, AL 35243 E-mail: rmjoyce@southernco.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 E-mail: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-226-EC Birmingham, AL 35242 E-mail: wasparkm@southernco.com

Package: ML20133J884, Cover letter: ML20133J883, Draft traveler SE: ML19318G482, *via e-mail NRR-106 OFFICE NRR/DORL/LSPB/LA* NRR/DSS/SCPB/BC* NRR/DE/EICB/BC*

NAME JBurkhardt BWittick MWaters DATE 5/4/2020 5/12/2020 5/22/2020 OFFICE NRR/DSS/SNPB/BC* NRR/DSS/SFNB/BC* NRR/DE/EEOB/BC*

NAME SKrepel RLukes BTitus DATE 5/12/2020 5/13/2020 5/13/2020 OFFICE NRR/DORL/LPL3/BC* NRR/DSS/STSB/PM* NRR/DSS/STSB/BC*

NAME NSalgado MHoncharik VCusumano DATE 5/20/2020 7/28/2020 7/29/2020 OFFICE OGC/NLO* OGC/NLO*

NAME MYoung JWachutka DATE 7/24/2020 7/28/2020