ML22131A371
ML22131A371 | |
Person / Time | |
---|---|
Site: | Armed Forces Radiobiology Research Institute |
Issue date: | 06/27/2022 |
From: | Joshua Borromeo NRC/NRR/DANU/UNPL |
To: | Cook A US Dept of Defense, Armed Forces Radiobiology Research Institute |
Montgomery C | |
Shared Package | |
ML22131A373 | List: |
References | |
EPID L-2020-NFA-0012 | |
Download: ML22131A371 (13) | |
Text
June 27, 2022 Mr. Andrew Cook Interim Reactor Facility Director Radiation Sciences Department Armed Forces Radiobiology Research Institute 4301 Jones Bridge Road, Building 42 Bethesda, MD 20889-5648
SUBJECT:
ARMED FORCES RADIOBIOLOGY RESEARCH INSTITUTE - ISSUANCE OF AMENDMENT NO. 26 TO RENEWED FACILITY OPERATING LICENSE NO.
R-84, FOR THE ARMED FORCES RADIOBIOLOGY RESEARCH INSTITUTE TRIGA-MARK F TANK-TYPE NUCLEAR REACTOR FACILITY TO UPGRADE THE DIGITAL INSTRUMENTATION AND CONTROL SYSTEM (EPID L-2020-NFA-0012)
Dear Mr. Cook:
The U.S. Nuclear Regulatory Commission (NRC) has issued the enclosed Amendment No. 26 to Armed Forces Radiobiology Research Institute (AFRRI) for the Armed Forces Radiobiology Research Institute TRIGA-Mark F tank-type nuclear reactor facility. This amendment authorizes AFRRI to upgrade the digital instrumentation and control systems for the AFRRI TRIGA reactor and authorizes changes to the renewed facility operating license and technical specifications.
This amendment is issued in response to the application for an amendment to Facility Operating License No. R-84 for the AFRRI TRIGA-Mark F reactor facility, filed by letter dated November 10, 2020 (Agencywide Documents Access and Management System (ADAMS)
Package Accession No. ML20318A338), as supplemented by letters dated February 5, 2021 (ADAMS Accession No. ML21036A297), February 11, 2021 (ADAMS Accession No. ML21042B841), October 28, 2021 (ADAMS Accession No. ML21302A096),
November 8, 2021 (ADAMS Accession No. ML21316A032), January 7, 2022 (ADAMS Accession No. ML22007A263), April 4, 2022 (ADAMS Accession No. ML22096A279), and April 28, 2022 (ADAMS Accession No. ML22118A867).
A. Cook 2 A copy of the NRC staffs safety evaluation is also enclosed. If you have any questions, please contact me at (301) 415-3398 or by electronic mail at Cindy.Montgomery@nrc.gov.
Sincerely, Boyle, Patrick signing on behalf of Montgomery, Cynthia on 06/27/22 Cindy Montgomery, Project Manager Non-Power Production and Utilization Facility Licensing Branch Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Docket No. 50-170 License No. R-84
Enclosures:
- 1. Amendment No. 26 to Facility Operating License No. R-84
- 2. Safety Evaluation Report cc w/enclosures: See next page
Armed Forces Radiobiology Research Institute Docket No 50-170 cc:
Director, Maryland Office of Planning 301 West Preston Street Baltimore, MD 21201 Montgomery County Executive 101 Monroe Street, 2nd Floor Rockville, MD 20850 Environmental Program Manager III Radiological Health Program Air & Radiation Management Adm.
Maryland Dept of the Environment 1800 Washington Blvd., Suite 750 Baltimore, MD 21230-1724 Director Air & Radiation Management Adm.
Maryland Dept of the Environment 1800 Washington Blvd., Suite 710 Baltimore, MD 21230 Manager Nuclear Programs Maryland Department of Natural Resources Tawes B-3 Annapolis, MD 21401 Colonel Mohammad Naeem, Director Armed Forces Radiobiology Research Institute 4301 Jones Bridge Road, Building 42 Bethesda, MD 20889-5648 Test, Research and Training Reactor Newsletter Attention: Amber Johnson Dept of Materials Science and Engineering University of Maryland 4418 Stadium Drive College Park, MD 20742-2115
ML22131A373 NRR-058 OFFICE NRR/DANU/UNPL/PM NRR/DANU/UNPL/LA OGC/NLO NAME CMontgomery NParker STurk DATE 5/11/2022 5/20/2022 6/22/2022 OFFICE NRR/DANU/UNPL/BC* NRR/DANU/UNPL/PM NAME JBorromeo CMontgomery DATE 6/24/2022 6/27/2022 ARMED FORCES RADIOBIOLOGY RESEARCH INSTITUTE DOCKET NO 50-170 ARMED FORCES RADIOBIOLOGY RESEARCH INSTITUTE TRIGA-MARK F TANK-TYPE NUCLEAR REACTOR FACILITY AMENDMENT TO FACILITY OPERATING LICENSE NO. R-84 Amendment No. 26 License No. R-84
- 1. The U.S. Nuclear Regulatory Commission (the Commission) has found that:
A. The application for an amendment to Facility Operating License No. R-84, filed by the Armed Forces Radiobiology Research Institute on November 10, 2020, as supplemented by letters dated February 5, 2021, February 11, 2021, October 28, 2021, November 8, 2021, January 7, 2022, April 4, 2022, and April 28, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commissions rules and regulations set forth in Title 10 of the Code of Federal Regulations (10 CFR) Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance that (i) the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; E. The issuance of this amendment is in accordance with 10 CFR Part 51, Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions, of the Commissions regulations and all applicable requirements have been satisfied; and F. Prior notice of this amendment was not required by 10 CFR 2.105, Notice of proposed action, and publication of a notice of issuance for this amendment is not required by 10 CFR 2.106, Notice of issuance.
Enclosure 1
- 2. Accordingly, the license is amended as described in Attachment 1 to this license amendment and by changes to the Technical Specifications as indicated in Attachment 2. Paragraph 2.C.2. of Facility Operating License No. R-84 is hereby amended to read as follows:
- 2. Technical Specifications The Technical Specifications contained in Appendix A, as revised by Amendment No. 26 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Joshua M. Digitally signed by Borromeo Joshua M. Borromeo Joshua M. Borromeo, Chief Non-Power Production and Utilization Facility Licensing Branch Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation Attachments:
- 1. Changes to Facility Operating License No. R-84
- 2. Changes to Appendix A, Technical Specifications Date of Issuance: June 27, 2022
ATTACHMENT TO LICENSE AMENDMENT NO. 26 FACILITY OPERATING LICENSE NO. R-84 DOCKET NO 50-170 Replace the following page of Facility Operating License No. R-84 with the attached revised page. The revised page is identified by amendment number and contains lines in the margin indicating the areas of change.
Facility Operating License No. R-84 Remove Insert 3 3 Attachment 1
- b. to receive, possess, and use, but not separate, in connection with the operation of the facility, up to 100 grams total of special nuclear material, of any enrichment, in the form of detectors, fission plates, foils, and solutions; and
- c. to receive, possess, and use, but not separate, in connection with the operation of the facility, such special nuclear material as may be produced by the operation of the facility.
- 3. Pursuant to the Act and 10 CFR Part 30, the following activities are included:
- a. to receive, possess, and use, in connection with the operation of the facility, a sealed 3-curie americium-beryllium neutron source; and,
- b. to receive, possess, and use, in connection with operation of the facility, such byproduct material as may be produced by operation of the reactor, which cannot be separated except for byproduct material produced in non-fueled reactor experiments.
- 4. Pursuant to the Act and 10 CFR Part 40, Domestic Licensing of Source Material, to receive, possess, and use, in connection with the operation of the facility, not more than 5.0 kilograms of source material.
C. This license shall be deemed to contain, and is subject to the conditions specified 10 CFR Parts 20, 30, 40, 50, 51, 55, 70, and 73 of the Commissions regulations; is subject to all provisions of the Act, and to the rules, regulations and orders of the Commission now or hereafter in effect, and is subject to the additional conditions specified or incorporated below:
- 1. Maximum Power Level The licensee is authorized to operate the reactor at a steady-state power level up to a maximum of 1.1 megawatts (thermal) and to pulse the reactor in accordance with the limitations in the Technical Specifications.
- 2. Technical Specifications The Technical Specifications contained in Appendix A, as revised by Amendment No. 26 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
Amendment No. 26 June 27, 2022
ATTACHMENT TO LICENSE AMENDMENT NO. 26 FACILITY OPERATING LICENSE NO. R-84 DOCKET NO 50-170 Replace the following pages of Appendix A, Technical Specifications, with the attached revised pages. The revised pages is identified by amendment number and contains vertical lines in the margin to indicate the areas of change.
Technical Specifications Remove Insert 14 14 15 15 28 28 30 30 Attachment 2
Table 2. Minimum Reactor Safety System Scrams Channel Maximum Set Point Effective Mode Steady State Pulse Fuel Temperature 600°C 2 2 Percent Power, High Flux 1.1 MW 2 0 Console Manual Scram Button Closure switch 1 1 High Voltage Loss to Safety Channel 20% Loss 2 1 Pulse Time 15 seconds 0 1 Emergency Stop Closure switch 3 3 (1 in each exposure room, 1 on console) 14 feet from the top of Pool Water Level the core 1 1 Watchdogs (UIT and CCS) 15 seconds 2 2 AC Power Loss 15 seconds 1 1 Bases The fuel temperature and power level scrams provide protection to ensure that the reactor can be shut down before the fuel temperature safety limit is exceeded. The manual scram allows the operator to shut down the system at any time if an unsafe or abnormal condition occurs. In the event of failure of the power supply for the safety channels, operation of the reactor without adequate instrumentation is prevented. The preset pulse timer ensures that the reactor power level will return to a low level after pulsing. The emergency stop allows personnel trapped in a potentially hazardous exposure room, or the reactor operator, to scram the reactor through the facility interlock system. The pool water level ensures that a loss of biological shielding would result in a reactor scram. The watchdog scram ensures reliable communication between the User Interface Terminal (UIT) and the Console Computer System (CCS).
The AC power loss scram ensures that a loss of AC power to the uninterruptible power supply (UPS) for the reactor control console will result in a scram.
14 Amendment No. 26 June 27, 2022
Table 3. Minimum Reactor Safety System Interlocks Effective Mode Action Prevented Steady State Pulse Pulse initiation at power levels greater than 1 kW X Withdrawal of any control rod except transient X Any rod withdrawal with power level below 1 x 10-5 watts as measured by the Linear Power Channel (NMP-1100) X X Simultaneous manual withdrawal of two standard rods X Any rod withdrawal if high voltage is lost to the Log Power Channel (NLW-1000) X X Withdrawal of any control rod if reactor period is less than 3 seconds X Application of air if the transient rod drive is not fully down. This interlock is not required in square wave mode. X
- Reactor safety system interlocks shall be tested daily whenever operations involving these functions are planned Bases The interlock preventing the initiation of a pulse at a power level above 1 kW ensures that the pulse magnitude will not allow the fuel element temperature to exceed the safety limit. The interlock that prevents movement of standard control rods in pulse mode will prevent the inadvertent increase in steady state reactor power prior to initiation of a pulse. Requiring a minimum power level to be measured by the Linear Power Channel ensures sufficient source neutrons to bring the reactor critical under controlled conditions. The interlock that prevents the simultaneous manual withdrawal of two standard control rods limits the amount of reactivity added per unit time. Correct high voltage to the Log Power Channel ensures accurate power indications. Preventing the withdrawal of any control rod if the period is less than 3 seconds minimizes the possibility of exceeding the maximum permissible power level or the fuel temperature safety limit.
15 Amendment No. 26 June 27, 2022
4.2.2. REACTOR SAFETY SYSTEMS Applicability These specifications apply to the surveillance requirements for measurement, test, and calibration of the reactor safety systems.
Objective The objective is to verify the performance and operability of the systems and components that are directly related to reactor safety.
Specifications
- a. A channel test of the scram function of the high-flux safety channels shall be made each day that reactor operations are planned.
- b. A channel test of each of the reactor safety system channels in Table 2 and Table 3 with the exception of the exposure room emergency stop and AC power loss scrams for the intended mode of operation shall be performed weekly, whenever operations are planned.
- c. Channel calibration, including verification of the setpoints for the high voltage loss to safety channel scrams, shall be made of the NP, NPP, NLW, NMP or any other console instrumentation designated to provide direct power level information to the operator, annually not to exceed 15 months.
- d. A thermal power calibration shall be completed annually not to exceed 15 months.
- e. The exposure room emergency stop and AC Power Loss scrams shall be tested annually, not to exceed 15 months.
- f. The low pool water scram shall be tested weekly not to exceed 10 days whenever operations are planned.
- g. The console manual scram button shall be tested weekly not to exceed 10 days whenever operations are planned.
Bases TRIGA system components have proven operational reliability. Daily tests ensure reliable scram functions and ensure the detection of channel drift or other possible deterioration of operating characteristics. The channel checks ensure that the safety system channel scrams are operable on a daily basis or prior to an extended run. The power level channel calibration will ensure that the reactor is operated within the authorized power levels.
28 Amendment No. 26 June 27, 2022
4.2.4. FACILITY INTERLOCK SYSTEM Applicability This specification applies to the surveillance requirements that ensure the integrity of the facility interlock system.
Objective The objective is to ensure performance and operability of the facility interlock system.
Specifications Functional checks shall be made annually, not to exceed 15 months, to ensure the following:
- a. With the lead shield doors open, neither exposure room plug door can be electrically opened.
- b. The core dolly cannot be moved in region 2 with the lead shield doors closed except during the use of the core dolly interlock override switch.
- c. The lead shield doors cannot be opened to allow movement into the exposure room projection unless a warning horn has sounded in that exposure room, or unless two licensed reactor operators have visually inspected the room to ensure that no personnel remain in the room prior to securing the plug door.
Bases These functional checks will verify operation of the interlock system.
Experience at AFRRI indicates that this is adequate to ensure operability.
30 Amendment No. 26 June 27, 2022