Letter Sequence Request |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML20318A339, ML21021A182, ML21253A001, ML21302A097, ML21302A103, ML21302A107, ML21316A033, ML21316A036, ML21316A037, ML21316A038, ML22067A246
|
MONTHYEARML20318A3482020-11-10010 November 2020 Enclosure 4 - Proposed Revision of Affected Technical Specifications Project stage: Request ML20318A3492020-11-10010 November 2020 Enclosure 5 - Affidavit for Proprietary Information Project stage: Request ML20318A3392020-11-10010 November 2020 Afrri LAR for Digital I&C Upgrade Project stage: Other ML20318A3402020-11-10010 November 2020 Explanation of Enclosures Project stage: Request ML20318A3432020-11-10010 November 2020 Enclosure 1c - License Amendment Request for the Upgrade of the Instrumentation and Control System for the Armed Forces Radiobiology Research Institute Triga Reactor - Redacted Project stage: Request ML20318A3462020-11-10010 November 2020 Enclosure 2c - Revised FSAR Chapter 7 - Instrumentation and Control Systems Project stage: Request ML20318A3472020-11-10010 November 2020 Enclosure 3 - Proposed Technical Specifications Changes Project stage: Request ML21021A1822021-01-0808 January 2021 AFRRI-Digital Instrumentation and Control License Amendment Request Non-Acceptance with Opportunity to Supplement Project stage: Other ML21036A3012021-02-0404 February 2021 Enclosure 4: General Atomics - Affidavit Project stage: Request ML21036A3002021-02-0505 February 2021 Enclosure 3: Supplemental Information for the License Amendment Request for the Upgrade of the Instrumentation and Control System for the Armed Forces Radiobiology Research Institute Triga Reactor Project stage: Supplement ML21036A2972021-02-0505 February 2021 Response to NRC 01/08/2021 Letter Re License Amendment Request for Facility Operating License No. R-84 for the Afrri Triga Reactor Docket No. 50-170 Project stage: Request ML21042B8412021-02-11011 February 2021 Transmittal of Proposed Changes to the Technical Specifications in Support of the License Amendment Request for the Digital Instrumentation and Control Upgrade for the Afrri Triga Reactor Project stage: Request ML21042B8422021-02-11011 February 2021 Enclosuproposed Changes to the Technical Specifications in Support of the License Amendment Request for the Digital Instrumentation and Control Upgrade for the Afrri Triga Reactor Project stage: Request ML21053A2672021-02-25025 February 2021 Armed Forces Radiobiology Research Institute Acceptance of the Application for a Llicense Amendment Digital Instrumentation and Control Upgrade Project stage: Acceptance Review ML21316A0372021-04-27027 April 2021 Enclosure 4 - Affidavit for Proprietary Information Project stage: Other ML21253A0012021-09-13013 September 2021 Us Department of Defense Armed Forces Radiology Research Institute - Regulatory Audit Plan for Digital Instrumentation and Control System Upgrade Project stage: Other ML21302A1072021-10-15015 October 2021 Enclosure 4 - Affidavit for Proprietary Information Project stage: Other ML21302A0962021-10-15015 October 2021, 28 October 2021 Afrri LAR for the Digital Instrumentation and Control Upgrade Revision 1 Project stage: Request ML21302A0972021-10-28028 October 2021 Afrri LAR for the Digital Instrumentation and Control Upgrade Revision 1 Project stage: Other ML21302A1032021-10-28028 October 2021 Enclosure 2c - Revision 1 of the Revised FSAR Chapter 7 - Instrumentation and Control Systems - Redacted Project stage: Other ML21302A1062021-10-28028 October 2021 Enclosure 3c - Revision 1 of the Supplemental Information for the License Amendment Request for the Upgrade of the Instrumentation and Control System for the Armed Forces Radiobiology Research Institute Triga Reactor - Redacted Project stage: Supplement ML21302A1002021-10-28028 October 2021 Enclosure 1c - Revision 1 of the License Amendment Request for the Upgrade of the Instrumentation and Control System for the Armed Forces Radiobiology Research Institute Triga Reactor - Redacted Project stage: Request ML21316A0382021-11-0808 November 2021 Enclosure 5 - Errata for Usuhs/Afrri Triga Reactor Control System Functional Requirements Specification (Conceptual) - T3S990001-FRS Rev a Project stage: Other ML21316A0362021-11-0808 November 2021 Enclosure 3 - Usuhs/Afrri Triga Reactor Control System Functional Requirements Specification (Conceptual) - T3S990001-FRS Rev a, Redacted Project stage: Other ML21316A0332021-11-0808 November 2021 Afrri - LAR - Digital IC - Functional Requirement Specification Project stage: Other ML22007A2642022-01-0707 January 2022 Us Dept. of Defense, Uniformed Services Univ. of the Health Sciences - the Armed Forces Radiobiology Research Institute (Afrri) Is Submitting a Supplement to the License Amendment Request for the Digital Instrumentation and Control Upgrade Project stage: Supplement ML22007A2652022-01-0707 January 2022 Armed Forces Radiobiology Research Institute, Responses to Open Items Related to the License Amendment Request for the Upgrade of the Instrumentation and Control System Project stage: Request ML22007A2632022-01-0707 January 2022 Us Dept. of Defense, Uniformed Services Univ. of the Health Sciences - the Armed Forces Radiobiology Research Institute (Afrri) Is Submitting a Supplement to the License Amendment Request for the Digital Instrumentation and Control Upgrade Project stage: Request ML22007A2662022-01-0707 January 2022 Armed Forces Radiobiology Research Institute, Proposed Changes to the Technical Specifications Related to the License Amendment Request for the Upgrade of the Instrumentation and Control System Project stage: Request ML22067A2462022-03-29029 March 2022 Armed Forces Radiobiology Research Institute (Afrri) Digital Instrumentation and Control (I&C) Audit Report Project stage: Other ML22096A2812022-04-0404 April 2022 Uniformed Services Univ. of the Health Sciences, Armed Forces Radiobiology Research Institute (Afrri), Proposed Changes to the Technical Specifications Related to the License Amendment Request for the Upgrade of the Instrumentation and Cont Project stage: Request ML22096A2792022-04-0404 April 2022 Uniformed Services Univ. of the Health Sciences, Armed Forces Radiobiology Research Institute (Afrri), Submittal of Supplement to License Amendment Request for the Digital Instrumentation and Control Upgrade Project stage: Request ML22096A2802022-04-0404 April 2022 Uniformed Services Univ. of the Health Sciences, Armed Forces Radiobiology Research Institute (Afrri), Submittal of Supplement to License Amendment Request for the Digital Instrumentation and Control Upgrade Project stage: Supplement ML22118A8682022-04-28028 April 2022 Armed Forces Radiobiology Research Institute (Afrri) - Supplement to the License Amendment Request for the Digital Instrumentation and Control Upgrade Project stage: Supplement ML22118A8672022-04-28028 April 2022 Armed Forces Radiobiology Research Institute (Afrri) - Supplement to the License Amendment Request for the Digital Instrumentation and Control Upgrade Project stage: Request ML22118A8692022-04-28028 April 2022 Supplemental Information to the License Amendment Request for the Upgrade of the Instrumentation and Control System for the Armed Forces Radiobiology Research Institute Triga Reactor Project stage: Supplement ML22131A3712022-06-27027 June 2022 Armed Forces Radiobiology Research Institute - Issuance of Amendment No. 26 to Renewed Facility Operating License No. R-84 Project stage: Approval 2021-02-04
[Table View] |
|
---|
Category:Technical Specification
MONTHYEARML22096A2812022-04-0404 April 2022 Uniformed Services Univ. of the Health Sciences, Armed Forces Radiobiology Research Institute (Afrri), Proposed Changes to the Technical Specifications Related to the License Amendment Request for the Upgrade of the Instrumentation and Cont ML22007A2662022-01-0707 January 2022 Armed Forces Radiobiology Research Institute, Proposed Changes to the Technical Specifications Related to the License Amendment Request for the Upgrade of the Instrumentation and Control System ML21042B8422021-02-11011 February 2021 Enclosuproposed Changes to the Technical Specifications in Support of the License Amendment Request for the Digital Instrumentation and Control Upgrade for the Afrri Triga Reactor ML20318A3482020-11-10010 November 2020 Enclosure 4 - Proposed Revision of Affected Technical Specifications ML20318A3472020-11-10010 November 2020 Enclosure 3 - Proposed Technical Specifications Changes ML19101A1932019-02-27027 February 2019 Armed Forces Radiobiology Research Institute (Afrri) - License Amendment Request (LAR) for Reactor Facility Director (Rfd) Qualification Tech Spec, Operations Minimum Staff Tech Spec, and Audit Function Tech Spec, Docket No. 50-170, License ML18276A0772018-09-25025 September 2018 Armed Forces Radiobiology Research Institute Reactor Facility Request to Amend the Technical Specifications for License R-84 2022-04-04
[Table view] Category:Amendment
MONTHYEARML20318A3482020-11-10010 November 2020 Enclosure 4 - Proposed Revision of Affected Technical Specifications ML19101A1932019-02-27027 February 2019 Armed Forces Radiobiology Research Institute (Afrri) - License Amendment Request (LAR) for Reactor Facility Director (Rfd) Qualification Tech Spec, Operations Minimum Staff Tech Spec, and Audit Function Tech Spec, Docket No. 50-170, License ML18276A0772018-09-25025 September 2018 Armed Forces Radiobiology Research Institute Reactor Facility Request to Amend the Technical Specifications for License R-84 2020-11-10
[Table view] |
Text
Enclosure 4 - Available to the Public Proposed Revision of affected Technical Specifications
Table 2. Minimum Reactor Safety System Scrams Channel Maximum Set Point Effective Mode Steady State Pulse Fuel Temperature 600°C 2 2 Percent Power, High Flux 1.1 MW 2 0 Console Manual Scram Button Closure switch 1 1 High Voltage Loss to Safety Channel 20% Loss 2 1 Pulse Time 15 seconds 0 1 Emergency Stop Closure switch 3 3 (1 in each exposure room, 1 on console) 14 feet from the top of Pool Water Level the core 1 1 Watchdogs (UIT and CCS) On digital console 1 1 Bases The fuel temperature and power level scrams provide protection to ensure that the reactor can be shut down before the fuel temperature safety limit is exceeded. The manual scram allows the operator to shut down the system at any time if an unsafe or abnormal condition occurs. In the event of failure of the power supply for the safety channels, operation of the reactor without adequate instrumentation is prevented. The preset pulse timer ensures that the reactor power level will return to a low level after pulsing. The emergency stop allows personnel trapped in a potentially hazardous exposure room, or the reactor operator, to scram the reactor through the facility interlock system. The pool water level ensures that a loss of biological shielding would result in a reactor scram. The watchdog scram ensures reliable communication between the User Interface Terminal (UIT) and the Console Computer System (CCS).
14
4.2.2. REACTOR SAFETY SYSTEMS Applicability These specifications apply to the surveillance requirements for measurement, test, and calibration of the reactor safety systems.
Objective The objective is to verify the performance and operability of the systems and components that are directly related to reactor safety.
Specifications
- a. A channel test of the scram function of the high-flux safety channels shall be made each day that reactor operations are planned.
- b. A channel test of each of each of the reactor safety system channels for the intended mode of operation shall be performed weekly, whenever operations are planned.
- c. Channel calibration shall be made of the NP, NPP, NLW, NMP or any other console instrumentation designated to provide direct power level information to the operator, annually not to exceed 15 months.
- d. A thermal power calibration shall be completed annually not to exceed 15 months.
- e. The emergency stop scram shall be tested annually, not to exceed 15 months.
- f. The low pool water scram shall be tested weekly not to exceed 10 days whenever operations are planned.
- g. The console manual scram button shall be tested weekly not to exceed 10 days whenever operations are planned.
Bases TRIGA system components have proven operational reliability. Daily tests ensure reliable scram functions and ensure the detection of channel drift or other possible deterioration of operating characteristics. The channel checks ensure that the safety system channel scrams are operable on a daily basis or prior to an extended run. The power level channel calibration will ensure that the reactor is operated within the authorized power levels.
28