ML20199M380

From kanterella
Revision as of 01:40, 10 April 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Tennessee Valley Authority - Radiological Emergency Plan Revision
ML20199M380
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 07/17/2020
From: Jerrica Johnson
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
CNL-20-060
Download: ML20199M380 (2)


Text

Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-20-060 July 17, 2020 10 CFR 50.54(q) 10 CFR 72.44(f)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License Nos. NPF-90 and NPF-96 NRC Docket Nos. 50-390, 50-391, and 72-1048

Subject:

TENNESSEE VALLEY AUTHORITY - RADIOLOGICAL EMERGENCY PLAN REVISION In accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.54(q) and 10 CFR 72.44(f), Tennessee Valley Authority (TVA) is submitting a description of changes to the TVA Radiological Emergency Plan (REP). The affected document is the REP Appendix C.

Document Revision Title Effective Date REP Appendix C 114 Watts Bar Nuclear Plant 7/2/2020 Radiological Emergency Plan Description of Changes and Summary of Analysis REP Appendix C TVA revised this REP as follows:

  • Changed EMTs to EMT to note that only one Emergency Medical Technician (EMT) is required 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day.

The above changes were evaluated in accordance with 10 CFR 50.54(q)(3) and 10 CFR 72.44(f). TVA determined that the changes did not reduce the effectiveness of the TVA REP. The TVA REP, as revised, continues to meet the requirements in Appendix E to 10 CFR 50 and the planning standards of 10 CFR 50.47(b).

U.S. Nuclear Regulatory Commission CNL-20-060 Page 2 July 17, 2020 There are no new regulatory commitments associated with this submittal. If you have any questions regarding this information, please contact Gordon Williams, Senior Manager, Fleet Licensing (Acting) at (423) 751-2687.

Respectfully, Jonathan T. Johnson Director, Nuclear Regulatory Affairs (Acting) cc:

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Watts Bar Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant NRC Director - Division of Spent Fuel Management, NMSS