ML22055A087

From kanterella
Revision as of 22:41, 5 April 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3
ML22055A087
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/23/2022
From: Blake Purnell
Plant Licensing Branch III
To: Lashley P
FirstEnergy Nuclear Operating Co
References
L-2021-LLR-0072
Download: ML22055A087 (3)


Text

From: Purnell, Blake Sent: Wednesday, February 23, 2022 10:21 AM To: Lashley, Phil H (EH)

Cc: Nesser, Kathryn M; Nevins, Kathleen J; Salgado, Nancy

Subject:

Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 Attachments: RAI Davis-Besse Relief Request RP-3.pdf Mr. Lashley, By application dated September 20, 2021 (Agencywide Document Access and Management System (ADAMS) Accession Number ML21263A193), Energy Harbor Nuclear Corp. submitted relief request RP-3 for the fifth inservice testing (IST) interval at Davis-Besse Nuclear Power Station, Unit No. 1 (Davis-Besse). Specifically, in accordance with paragraph 50.55a(f)(5)(iii) of Title 10 of the Code of Federal Regulations (10 CFR), the application requests relief from certain IST requirements for two emergency diesel generator fuel oil transfer pumps on the basis that performing these tests is impractical. The requirements applicable to the fifth IST interval at Davis-Besse are in the 2017 Edition of the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants, as incorporated by reference in 10 CFR 50.55a, Codes and standards.

The NRC staff is reviewing the application and has determined that additional information is needed to complete the review. A response to the attached request for additional information is requested to be provided within 30 days of the date of this email. Please contact me if you have any questions.

Sincerely, Blake Purnell, Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Docket No. 50-346 EPID L-2021-LLR-0072 OFFICE NRR/DORL/LPL3/PM NRR/DEX/EMIB/BC(A) NRR/DORL/LPL3/BC NAME BPurnell ITseng NSalgado DATE 2/23/22 1/7/22 2/16/22

Hearing Identifier: NRR_DRMA Email Number: 1531 Mail Envelope Properties (BLAPR09MB6497025198287C1594A857E9E63C9)

Subject:

Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 Sent Date: 2/23/2022 10:21:12 AM Received Date: 2/23/2022 10:21:00 AM From: Purnell, Blake Created By: Blake.Purnell@nrc.gov Recipients:

"Nesser, Kathryn M" <kmnesser@energyharbor.com>

Tracking Status: None "Nevins, Kathleen J" <kjnevins@energyharbor.com>

Tracking Status: None "Salgado, Nancy" <Nancy.Salgado@nrc.gov>

Tracking Status: None "Lashley, Phil H (EH)" <phlashley@energyharbor.com>

Tracking Status: None Post Office: BLAPR09MB6497.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1584 2/23/2022 10:21:00 AM RAI Davis-Besse Relief Request RP-3.pdf 104113 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

DRAFT REQUEST FOR ADDITIONAL INFORMATION RELIEF REQUEST RP-3 REGARDING FUEL OIL TRANSFER PUMP TESTING ENERGY HARBOR NUCLEAR GENERATION LLC ENERGY HARBOR NUCLEAR CORP.

DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1 DOCKET NO. 50-346 By application dated September 20, 2021 (Agencywide Document Access and Management System (ADAMS) Accession Number ML21263A193), Energy Harbor Nuclear Corp. submitted relief request RP-3 for the fifth inservice testing (IST) interval at Davis-Besse Nuclear Power Station, Unit No. 1 (Davis-Besse). Specifically, in accordance with paragraph 50.55a(f)(5)(iii) of Title 10 of the Code of Federal Regulations (10 CFR), the application requests relief from certain IST requirements for two emergency diesel generator fuel oil transfer pumps on the basis that performing these tests is impractical. The requirements applicable to the fifth IST interval at Davis-Besse are in the 2017 Edition of the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants, as incorporated by reference in 10 CFR 50.55a, Codes and standards.

The NRC staff is reviewing the application and has determined that the additional information below is required to complete the review.

Request for Additional Information (RAI)-1 Describe the preventive maintenance performed on the fuel oil transfer pumps.

RAI-2

Provide a summary of the IST results for each fuel oil transfer pump for the past 10 years.

Discuss any failures of these pumps that have occurred.

RAI-3

Provide a comparison of the actual flow rates versus the licensed minimum flow rates for the fuel oil transfer pumps.