|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20206N2621999-05-11011 May 1999 Application for Amend to License DPR-6 to Delete from Defueled Ts,Subsection 1.16,change Definition of Site & Other Associated Editorial Changes ML20217F5191998-03-28028 March 1998 Application for Amend to License DPR-6,per 10CFR50.90 Re Security Plan.Encl Withheld ML20138G1961997-04-30030 April 1997 Application for Amend to License DPR-6,requesting Name Change from Consumers Power Company to Consumers Energy Company, to Reflect Broader Scope of Energy Resources Available Through Company ML20138A9061997-04-22022 April 1997 Application for Amend to License DPR-6,requesting Change to TS to Withdraw Petition to Implement Option B Performance Based Requirements to App J of 10CFR50 ML20134H6281996-11-0707 November 1996 Application for Amend to License DPR-6,adding New Air Compressor to Svc Air Segment of Svc & Instrument Air Sys ML20129C4611996-10-15015 October 1996 Application for Amend to License DPR-3,implementing Option B to Allow Use of Type a Test (Containment) Type B Test (Pneumatic Tests to Detect & Measure Local Leakage Rates Across Pressure Retaining Boundaries) & Type C Test ML20056G3811993-08-24024 August 1993 Application for Amend to License DPR-6,revising 930719 Original Change,Reflects Revision to 10CFR50.36(a)(2) Re Changing Reporting Requirement for Effluent Releases from Semiannual to Annual ML20128D7081993-01-29029 January 1993 Application for Amend to License DPR-6,revising TS to Reflect Administrative Changes in Engineering,Offsite Review & QA Organization ML20059A2091990-08-14014 August 1990 Application for Amend to License DPR-6,reflecting Administrative & Organizational Changes ML20247L0891989-05-25025 May 1989 Application for Amend to License DPR-6,to Align Specs to 10CFR50,App J Requirements That Permit Removal of 24 H Duration Restriction on Integrated Leak Rate Test ML20205P6231988-10-24024 October 1988 Application for Amend to License DPR-6,deleting Tech Spec Requirements to Calibr Portable Gamma & Neutron dose-rate Measuring Instruments at Least Once Every 3 Months & Instead Follow ANSI N323-1978 ML20154S6371988-09-22022 September 1988 Application for Amend to License DPR-6,allowing Independent Review & Audit Functions by Independent Organizational Unit Rather than Standing Committee.Changes Consistent W/Bwr STS, ANSI N18.7-1976 & ANS 3.1-1987.Fee Paid ML20154P2111988-09-21021 September 1988 Application for Amend to License DPR-6,revising Tech Specs to Provide Clarification & Consistency by Reflecting Administrative & Editorial Corrections.Fee Paid ML20154D4761988-09-0808 September 1988 Application for Amend to License DPR-6,proposing Removal of Organization Charts from Tech Specs & Informing NRC of Onsite Organizational Changes.Fee Paid ML20150C7831988-07-0505 July 1988 Application for Amend to License DPR-6,changing Tech Specs Re Reactor Depressurization Sys (Rds) Surveillance Testing, Eliminating Quarterly Partial Stroke Exercising of Rds Depressurizing Valves ML20148H6271988-03-22022 March 1988 Application for Amend to License DPR-6,changing Tech Specs Re Frequency of Reactor Depressurization Sys Depressurizing Valve Testing ML20237B9661987-12-14014 December 1987 Application for Amend to License DPR-6,removing Numerical Designator from I-type Fuel for Fuel Operating Cycle.Fee Paid ML20236N5021987-11-0909 November 1987 Application for Amend to License DPR-6,changing Tech Specs Administratively to Reflect Features & Terminology Used W/ New out-of-core Power Range Nuclear Instrumentation ML20236B3221987-07-23023 July 1987 Application for Amend to License DPR-6,consisting of Accumulated Administrative Changes ML20210C5961987-02-0404 February 1987 Application for Amend to License DPR-6,changing Tech Spec Section 5.2.1.b by Adding Table of Uncertainty Factors Associated W/Analysis of Core thermal-hydraulic Parameters Heat Flux,Maplhgr & Max Bundle Power ML20212F0301986-12-30030 December 1986 Application for Amend to License DPR-6,changing Tech Specs to Include Second Scram Dump Tank Vent & Drain Valve ML20207C9541986-12-22022 December 1986 Application to Amend License DPR-6,revising Tech Specs to Reduce Station Battery Design Time Interval from 8 to 2 H. Fee Paid ML20215F9941986-12-17017 December 1986 Application for Amend to License DPR-6,changing Tech Specs to Add Operability & Surveillance Requirements for Alternate Shutdown Sys Installed Per 10CFR50,App R & Generic Ltr 81-12.Request Supersedes 860421 Application ML20210E5141986-12-17017 December 1986 Application for Amend to License DPR-6,adding Operability & Surveillance Requirements for Alternate Shutdown Sys & Revising Tech Specs for Active Fire Barriers & Fire Detection Instrumentation for Auxiliary Shutdown Bldg ML20215C7211986-12-0505 December 1986 Application to Amend License DPR-6,revising Tech Specs to Reflect Use of New Hybrid Control Rods Mfg by Nucom,Inc & to Include Reload I-2 Fuel.Fee Paid ML20206M5081986-08-15015 August 1986 Application for Amend to License DPR-6,changing Tech Specs to Reflect Features & Terminology Used W/New out-of-core source-range Nuclear Instrumentation ML20203P8021986-05-0101 May 1986 Application for Amend to License DPR-6,revising Tech Specs to Ensure Consistency w/831230 Exemption from Requirement to Have Two Senior Reactor Operators on Shift ML20203F6461986-04-21021 April 1986 Application for Amend to License DPR-6,changing Tech Specs Re Alternate Shutdown Battery Sys Operability & Surveillance Requirements ML20154K0181986-03-0404 March 1986 Application for Amend to License DPR-6,changing Tech Specs by Adding Operability & Surveillance Requirements for Alternate Shutdown Sys Installed Per 10CFR50,App R ML20137V9621985-09-30030 September 1985 Application for Amend to License DPR-6,adding Operability & Surveillance Requirements for Components of Alternate Shutdown Sys Installed in Accordance w/10CFR50,App R ML20132F4561985-09-24024 September 1985 Revised Application for Amend to License DPR-6,changing I1 Fuel MAPLHGR Limits,Per 850816 Request,In Order to Implement Operating Limits for Reload Il Fuel ML20135B7971985-09-0303 September 1985 Application for Amend to License DPR-6,supplementing 741101 Proposed Tech Spec Change to Eliminate Min Control Rod Withdrawal Rate Limit ML20134E3011985-08-16016 August 1985 Application for Amend to License DPR-6,changing Tech Specs to Implement Reactor Operating Limits for Reload I1 Fuel ML20133M1131985-08-0505 August 1985 Application for Amend to License DPR-6,changing Tech Specs to Implement Staff Reorganization ML20132B7311985-07-19019 July 1985 Revised Application for Amend to License DPR-6,providing Tech Specs for Containment Pressure Monitor & Containment Water Level Monitor,Per NUREG-0737,Item II.F.1 ML20128B9131985-06-27027 June 1985 Application for Amend to License DPR-6,changing Tech Specs to Allow Operation of Plant Between Refueling Shutdowns W/O Potential of Requiring Surveillance Test to Be Performed.Fee Paid ML20126A0521985-06-0707 June 1985 Application for Amend to License DPR-6,incorporating Requirement to Adhere to Encl Plan for Big Rock Point Integrated Assessment. Fee Paid ML20128E4931985-05-24024 May 1985 Revised Application for Amend to License DPR-6,revising 840730 Tech Spec Change Request by Renumbering Definition Section 1.2.8 to 1.2.14 Re Administrative Controls ML20058E4011982-07-20020 July 1982 Application to Amend License DPR-6,changing Tech Specs Re Safety Mgt Function ML20058E3881982-07-20020 July 1982 Application to Amend License DPR-20,revising Tech Specs Re Safety Mgt Function ML20054J7321982-06-25025 June 1982 Application to Amend License DPR-6,changing Tech Specs to Change Technical Advisor from Shift to 24-h on-call Schedule 1999-05-11
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20206N2621999-05-11011 May 1999 Application for Amend to License DPR-6 to Delete from Defueled Ts,Subsection 1.16,change Definition of Site & Other Associated Editorial Changes ML20198K6581998-12-24024 December 1998 Amend 120 to License DPR-6,changing License DPR-6 & App a, TS to Reflect Permanetly Shutdown & Defueled Status of Plant ML20217F5191998-03-28028 March 1998 Application for Amend to License DPR-6,per 10CFR50.90 Re Security Plan.Encl Withheld ML20141J8651997-08-14014 August 1997 Amend 119 to License DPR-6,revising Plant License & TS to Reflect Company Name Change from CPC to Consumers Energy Co ML20138G1961997-04-30030 April 1997 Application for Amend to License DPR-6,requesting Name Change from Consumers Power Company to Consumers Energy Company, to Reflect Broader Scope of Energy Resources Available Through Company ML20138A9061997-04-22022 April 1997 Application for Amend to License DPR-6,requesting Change to TS to Withdraw Petition to Implement Option B Performance Based Requirements to App J of 10CFR50 ML20137J9321997-04-0202 April 1997 Amend 118 to License DPR-6,revising TS 4.2.9,to Add Additional Air Compressor ML20134H6281996-11-0707 November 1996 Application for Amend to License DPR-6,adding New Air Compressor to Svc Air Segment of Svc & Instrument Air Sys ML20129C4611996-10-15015 October 1996 Application for Amend to License DPR-3,implementing Option B to Allow Use of Type a Test (Containment) Type B Test (Pneumatic Tests to Detect & Measure Local Leakage Rates Across Pressure Retaining Boundaries) & Type C Test ML20058A1511993-11-15015 November 1993 Amend 112 to License DPR-6,changing TS to Implement Reorganization of Plant Staff ML20057E1951993-10-0505 October 1993 Amend 111 to License DPR-6,changing Reporting Requirements for Effluent Releases from Semiannual to Annual ML20056G3811993-08-24024 August 1993 Application for Amend to License DPR-6,revising 930719 Original Change,Reflects Revision to 10CFR50.36(a)(2) Re Changing Reporting Requirement for Effluent Releases from Semiannual to Annual ML20056E1651993-08-16016 August 1993 Amend 110 to License DPR-6,clarifying TS Re Undervoltage Breakers in RPS ML20128D7081993-01-29029 January 1993 Application for Amend to License DPR-6,revising TS to Reflect Administrative Changes in Engineering,Offsite Review & QA Organization ML20059A2091990-08-14014 August 1990 Application for Amend to License DPR-6,reflecting Administrative & Organizational Changes ML20246D2351989-08-16016 August 1989 Amend 100 to License DPR-6,revising Tech Specs to Provide for New Organizational Unit Entitled Nuclear Safety Svcs Dept to Discharge Offsite Safety Review Functions Instead of Nuclear Safety Board ML20245H8341989-07-28028 July 1989 Amend 98 to License DPR-6,requiring Compliance W/Amended Physical Security Plan ML20248C0571989-05-31031 May 1989 Amend 97 to License DPR-6,adding Operability & Surveillance Requirements for Alternate Shutdown Sys to Tech Spec Sections 11 & 12 & Including Tech Specs for Active Fire Barriers & Fire Detection Instrumentation ML20247L0891989-05-25025 May 1989 Application for Amend to License DPR-6,to Align Specs to 10CFR50,App J Requirements That Permit Removal of 24 H Duration Restriction on Integrated Leak Rate Test ML20246L8191989-05-0202 May 1989 Amend 96 to License DPR-6,revising OL to Allow for Increase in Amount of Byproduct Matl Plant May Possess & Use from 10.5 to 45 Ci Cs-137,as Sealed Sources ML20245F8251989-04-14014 April 1989 Amend 95 to License DPR-6,changing Tech Specs to Include Second Vent & Second Drain Valve to Scram Dump Tank ML20235J0231989-02-15015 February 1989 Amend 94 to License DPR-6,revising Station Battery Surveillance Test Time from 8 to 2 H ML20205S1241988-11-0404 November 1988 Amend 93 to License DPR-6,modifying Tech Specs by Replacing Requirements to partial-stroke Test Reactor Depressurization Sys Depressurizing Valves Quarterly W/Requirement to full- Stroke Test for Depressurizing Valves Each Outage ML20205P6231988-10-24024 October 1988 Application for Amend to License DPR-6,deleting Tech Spec Requirements to Calibr Portable Gamma & Neutron dose-rate Measuring Instruments at Least Once Every 3 Months & Instead Follow ANSI N323-1978 ML20154S6371988-09-22022 September 1988 Application for Amend to License DPR-6,allowing Independent Review & Audit Functions by Independent Organizational Unit Rather than Standing Committee.Changes Consistent W/Bwr STS, ANSI N18.7-1976 & ANS 3.1-1987.Fee Paid ML20154P2111988-09-21021 September 1988 Application for Amend to License DPR-6,revising Tech Specs to Provide Clarification & Consistency by Reflecting Administrative & Editorial Corrections.Fee Paid ML20154G1081988-09-14014 September 1988 Amend 92 to License DPR-6,modifying Paragraph 2.C.(5) of License Re Physical Security ML20154D4761988-09-0808 September 1988 Application for Amend to License DPR-6,proposing Removal of Organization Charts from Tech Specs & Informing NRC of Onsite Organizational Changes.Fee Paid ML20150C7831988-07-0505 July 1988 Application for Amend to License DPR-6,changing Tech Specs Re Reactor Depressurization Sys (Rds) Surveillance Testing, Eliminating Quarterly Partial Stroke Exercising of Rds Depressurizing Valves ML20154J1871988-05-17017 May 1988 Amend 91 to License DPR-6,changing Tech Specs to Reflect Features & Terminology Used W/New out-of-core Power Range Instrumentation ML20154H5251988-05-17017 May 1988 Amend 90 to License DPR-6,allowing Inclusion of All Reloads of I Fuel Design in Tech Specs ML20148H6271988-03-22022 March 1988 Application for Amend to License DPR-6,changing Tech Specs Re Frequency of Reactor Depressurization Sys Depressurizing Valve Testing ML20237B9661987-12-14014 December 1987 Application for Amend to License DPR-6,removing Numerical Designator from I-type Fuel for Fuel Operating Cycle.Fee Paid ML20236N5021987-11-0909 November 1987 Application for Amend to License DPR-6,changing Tech Specs Administratively to Reflect Features & Terminology Used W/ New out-of-core Power Range Nuclear Instrumentation ML20236B3221987-07-23023 July 1987 Application for Amend to License DPR-6,consisting of Accumulated Administrative Changes ML20211P1321987-02-19019 February 1987 Amend 89 to License DPR-6,revising Tech Spec Section 5.2.1.b to Add Table of Uncertainty Factors Re Analysis of Core Thermal Hydraulic Parameters for Reload I-2 Fuel & to Provide Footnotes Delineating Use of Values ML20211N5181987-02-17017 February 1987 Amend 88 to License DPR-6,revising Tech Spec Section 5.1 to Reflect Use of New Nucom,Inc Hybrid Control Rods in Cycle 22 Core ML20210C5961987-02-0404 February 1987 Application for Amend to License DPR-6,changing Tech Spec Section 5.2.1.b by Adding Table of Uncertainty Factors Associated W/Analysis of Core thermal-hydraulic Parameters Heat Flux,Maplhgr & Max Bundle Power ML20209H0481987-01-28028 January 1987 Amend 87 to License DPR-6,changing Tech Specs to Reflect Features & Terminology Used in Conjunction W/Installation of New source-range Monitoring Instrumentation ML20212F0301986-12-30030 December 1986 Application for Amend to License DPR-6,changing Tech Specs to Include Second Scram Dump Tank Vent & Drain Valve ML20207C9541986-12-22022 December 1986 Application to Amend License DPR-6,revising Tech Specs to Reduce Station Battery Design Time Interval from 8 to 2 H. Fee Paid ML20215F9941986-12-17017 December 1986 Application for Amend to License DPR-6,changing Tech Specs to Add Operability & Surveillance Requirements for Alternate Shutdown Sys Installed Per 10CFR50,App R & Generic Ltr 81-12.Request Supersedes 860421 Application ML20210E5141986-12-17017 December 1986 Application for Amend to License DPR-6,adding Operability & Surveillance Requirements for Alternate Shutdown Sys & Revising Tech Specs for Active Fire Barriers & Fire Detection Instrumentation for Auxiliary Shutdown Bldg ML20215C7211986-12-0505 December 1986 Application to Amend License DPR-6,revising Tech Specs to Reflect Use of New Hybrid Control Rods Mfg by Nucom,Inc & to Include Reload I-2 Fuel.Fee Paid ML20206M5081986-08-15015 August 1986 Application for Amend to License DPR-6,changing Tech Specs to Reflect Features & Terminology Used W/New out-of-core source-range Nuclear Instrumentation ML20211P3751986-07-11011 July 1986 Amend 86 to License DPR-6,adding Tech Spec Table Sentence Establishing Min Requirements for Shift Crew Composition During Various Operating Conditions ML20198A3801986-05-12012 May 1986 Amend 85 to License DPR-6,adding Definition for Reportable Event & Deleting Reporting Requirements Included in 10CFR50.72 & 50.73 ML20210P1651986-05-0606 May 1986 Amend 84 to License DPR-6,adding Condition to CRD Surveillance Testing Requiring Testing Prior to Startup Following Outages of More than 120 Days ML20203P8021986-05-0101 May 1986 Application for Amend to License DPR-6,revising Tech Specs to Ensure Consistency w/831230 Exemption from Requirement to Have Two Senior Reactor Operators on Shift ML20203F6461986-04-21021 April 1986 Application for Amend to License DPR-6,changing Tech Specs Re Alternate Shutdown Battery Sys Operability & Surveillance Requirements 1999-05-11
[Table view] |
Text
-
CONSUMERS POWER COMPANY Docket 50-155 Request for Change to the Technical Specifications License DPR-6 For the reasons hereinafter set forth, it is requested that the Technical Specifications contained in.the Facility Operating License DPR-6, Docket 50-155, issued to Consumers Power Company on May 1, 1964, for the Big Rock Point Plant be changed as described in Section I below:
I. Changes A. Change specification 6.1.2.1 to read as follows:
" Source Range Monitor Channel - Channels.6 and 7 shall provide logarithmic neutron flux level and period information from source level to seven decades above source level, without moving detectors
-10 to 10-3% of rated power). The principal (approximately 10 components in each channel shall be a neutron detector, current pulse amplifier, source range monitor instrument, log count rate meter, log count rate recorder and period meter. Gas-filled Boron-10 lined proportional counters with a sensitivity of approximately 12 counts /nv shall be used as detectors. Provisions shall be made for remotely positioning the detectors. By moving the detectors away from the midplane of the core, their effective range may be extended. A short period on either channel shall be annunciated in the control room."
B. Change specification 6.1.5(c) to read as follows:
"Both source range monitor channels shall be OPERABLE and measuring <
flux from the core during reactor start-ups, prior to the power level at which the intermediate or power range channels become operative. However, if one of the two source range monitor channels become inoperative during the course of start-up and prior to the power level at which the intermediate or power range channels become operative, then it will be permissible to hold the i control rod pattern and power level attained until both channels i are again OPERABLE."
C. Change specification 6.1.5(f) to read as follows:
"During POWER OPERATION in-core flux monitors shall be operating to e insure that local heat flux limits specified in Section 5.2.1 are i not exceeded."
D. Change specification 6.1.5(h) to read as follows:
" Minimum .aclear instrumentation in operation during SHUTDOWN operation shall be tha same as that required for REFUELING 8605210239 86091S
! PDR ADOCK 05000155 p PDR
- TSOB0786-0123-NLO4
2 OPERATION, except that only one source range monitor channel shall be required."
E. Change the first paragraph of specification 7.3.2(d) to read as follows:
"The source range monitor shall indicate a minimum of three counts per second with a eignal-to-noise ratio of 3 to 1. This will be accomplished by withdrawing the proportional counter to a region of lower flux and observing ti.e reduction in count rate."
F. Change the first sentence of specification 7.3.2(d)(i).to read as follows:
" Prior to the first start-up after development of the low source strength condition, a critical approach (es) with the reactor vessel head off shall be performed to evaluata the source range monitor response and the control rod withdrawal sequence."
G. Change specification 7.3.2(d)(ii) to read as follows:
" Evaluation of source range monitor responses during the head-off critical approach (es) shall demonstrate that, by the time the estimated k of the core reaches 0.995, each source range monitor isreadingIbleast3cpswitha3to1 signal-to-noiseratio."
H. Change the last sentence of specification 7.3.2(d)(iii) to read as follows:
" Normal start-up may continue any time source range monitor count rate is at least 3 counts per second with a minimum signal-to-noise ratio of 3 to 1."
-I. Change the first two sentences of specification 7.3.2(e) to read as follows:
" Critical approaches shall be monitored using source range monitors. The start-up rate shall be restricted to demonstrate that the CIC picosameters overlap the source range monitors at about 10-5% indicated full power on the picoammeters is normal and satisfactory for control and safety purposes before continuing further into the power range."
l J. Change the first sentence in specification 7.3.5(e) to read as follows:
"A minimum of one source range monitor channel and one power range l channel shall be left in operation."
K. Change specification 7.4(a) to read as follows:
i
! " Detailed written procedures shall be available prior to each refueling outage."
TS0B0786-0125-NLO4 2
3 l L. Change specification 7.4(b)(iii) and the paragraph following it to read as follows:
(iii) " Insertion of new bundles in vacant positions as desired.
Shutdown margin verifications and subcriticality checks shall be made as required by Section 5.2.5. Assembly replacement shall proceed as described above until the desired number of fuel
, assemblies have been changed."
M. Change the third paragraph of specification 7.4(c) to read as follows:
"In addition, both source range monitor channels shall be in service and measuring neutron flux during all REFUELING OPERATIONS."
II. Discussion Consumers Power Company is replacing the source range out-of-core neutron monitoring instrumentation during the next scheduled refueling outage at Big Rock Point. This instrumentation is being replaced because of the limited availability of replacement parts and the high expenditure of maintenance hours to keep the existing equipment in operation.
The new instrumentation is a member of the General Electric Company's NUMAC series of microprocessor based instrumentation. The Nuclear Regulatory Commission has been previously requested to review this series of instrumentation as a standard design on the lacrosse docket (No. 50-409) by their February 6, 1986 letter.
This instrumentation is functionally equivalent to the existing instrumentation. A system description and block diagram of the instrumentation is enclosed as attachments 2 and 3 respectively. This changeout will include replacement of the entire source range monitoring system with the exception of the detector. Consumers Power Company has performed a 10CFR50.59 review of this modification and has determined it not to be an unreviewed safety question.
As a result of this modification administrative type technical specification changes are required to reflect the features and terminology used with the new instrumentation. All of the proposed changes requested are in this category except proposed changes C., K.
and L. Proposed change C. corrects the reference to the section where local heat flux limits are specified. Proposed change K. replaces the word operation with the word outage to more explicitly identify when procedures are to be available. Proposed change L. deletes the redundant statement of the requirement to perform shutdown margin checks. Also, in all proposed changes where technical specification definitions have been used they have been capitalized as is the practice i in standard technical specifications.
i TS0B0786-0125-NLO4 l
l I
4 III. Analysis of No Significant Hazards Consideration All of these proposed changes are administrative in nature and neither add new requirements nor delete existing requirements. Most of these changes are being requested to reflect the features and terminology used because of the change out of existing out-of-core source range neutron monitoring instrumentation with functionally equivalent equipment which exhibit improved operating characteristics and availability of spare parts. Two of the proposed changes correct typographical errors and one proposed change clarifies intent by more explicitly identifying when refueling procedures are required to be available.
Because they are administrative in nature, these proposed changes do not increase the previously evaluated probability of occurrence or consequences of an accident or malfunction of equipment important to safety, do not create the possibility of an accident or malfunction of a different type than those previously evaluated, and do not reduce the margin of safety as defined in any technical specification basis.
Therefore, these proposed changes do not involve a significant hazards consideration.
IV. Conclusion The Big Rock Point Plant Review Committee has reviewed th's Technical Specification Change Request and has determined that this change does not involve an unreviewed safety question and therefore involves no significant hazards consideration. This change has also been reviewed under the cognizance of the Nuclear Safety Board. A copy of this Technical Specification Change Request has been sent to the State of Michigan official designated to receive such Amendments to the Operating License.
CONSUMERS POWER COMPANY l
By .
RMeWlt't,'Vice President Energy Supply Services r
Sworn and subscribed to before me this 15th day of August 1986.
Y Elaine E Buehrer,\ Notary Public l Jackson County, Michigan
! My commission expires October 31, 1989 l