ML20056E165
From kanterella
Jump to navigation
Jump to search
ML20056E165 | |
Person / Time | |
---|---|
Site: | Big Rock Point File:Consumers Energy icon.png |
Issue date: | 08/16/1993 |
From: | Bill Dean Office of Nuclear Reactor Regulation |
To: | |
Shared Package | |
ML20056E163 | List: |
References | |
NUDOCS 9308200158 | |
Download: ML20056E165 (4) | |
Similar Documents at Big Rock Point | |
---|---|
Category:OPERATING LICENSES & AMENDMENTS
MONTHYEARML20198K6581998-12-24024 December 1998
[Table view]Amend 120 to License DPR-6,changing License DPR-6 & App a, TS to Reflect Permanetly Shutdown & Defueled Status of Plant ML20141J8651997-08-14014 August 1997 Amend 119 to License DPR-6,revising Plant License & TS to Reflect Company Name Change from CPC to Consumers Energy Co ML20137J9321997-04-0202 April 1997 Amend 118 to License DPR-6,revising TS 4.2.9,to Add Additional Air Compressor ML20058A1511993-11-15015 November 1993 Amend 112 to License DPR-6,changing TS to Implement Reorganization of Plant Staff ML20057E1951993-10-0505 October 1993 Amend 111 to License DPR-6,changing Reporting Requirements for Effluent Releases from Semiannual to Annual ML20056E1651993-08-16016 August 1993 Amend 110 to License DPR-6,clarifying TS Re Undervoltage Breakers in RPS ML20246D2351989-08-16016 August 1989 Amend 100 to License DPR-6,revising Tech Specs to Provide for New Organizational Unit Entitled Nuclear Safety Svcs Dept to Discharge Offsite Safety Review Functions Instead of Nuclear Safety Board ML20245H8341989-07-28028 July 1989 Amend 98 to License DPR-6,requiring Compliance W/Amended Physical Security Plan ML20248C0571989-05-31031 May 1989 Amend 97 to License DPR-6,adding Operability & Surveillance Requirements for Alternate Shutdown Sys to Tech Spec Sections 11 & 12 & Including Tech Specs for Active Fire Barriers & Fire Detection Instrumentation ML20246L8191989-05-0202 May 1989 Amend 96 to License DPR-6,revising OL to Allow for Increase in Amount of Byproduct Matl Plant May Possess & Use from 10.5 to 45 Ci Cs-137,as Sealed Sources ML20245F8251989-04-14014 April 1989 Amend 95 to License DPR-6,changing Tech Specs to Include Second Vent & Second Drain Valve to Scram Dump Tank ML20235J0231989-02-15015 February 1989 Amend 94 to License DPR-6,revising Station Battery Surveillance Test Time from 8 to 2 H ML20205S1241988-11-0404 November 1988 Amend 93 to License DPR-6,modifying Tech Specs by Replacing Requirements to partial-stroke Test Reactor Depressurization Sys Depressurizing Valves Quarterly W/Requirement to full- Stroke Test for Depressurizing Valves Each Outage ML20154G1081988-09-14014 September 1988 Amend 92 to License DPR-6,modifying Paragraph 2.C.(5) of License Re Physical Security ML20154J1871988-05-17017 May 1988 Amend 91 to License DPR-6,changing Tech Specs to Reflect Features & Terminology Used W/New out-of-core Power Range Instrumentation ML20154H5251988-05-17017 May 1988 Amend 90 to License DPR-6,allowing Inclusion of All Reloads of I Fuel Design in Tech Specs ML20211P1321987-02-19019 February 1987 Amend 89 to License DPR-6,revising Tech Spec Section 5.2.1.b to Add Table of Uncertainty Factors Re Analysis of Core Thermal Hydraulic Parameters for Reload I-2 Fuel & to Provide Footnotes Delineating Use of Values ML20211N5181987-02-17017 February 1987 Amend 88 to License DPR-6,revising Tech Spec Section 5.1 to Reflect Use of New Nucom,Inc Hybrid Control Rods in Cycle 22 Core ML20209H0481987-01-28028 January 1987 Amend 87 to License DPR-6,changing Tech Specs to Reflect Features & Terminology Used in Conjunction W/Installation of New source-range Monitoring Instrumentation ML20211P3751986-07-11011 July 1986 Amend 86 to License DPR-6,adding Tech Spec Table Sentence Establishing Min Requirements for Shift Crew Composition During Various Operating Conditions ML20198A3801986-05-12012 May 1986 Amend 85 to License DPR-6,adding Definition for Reportable Event & Deleting Reporting Requirements Included in 10CFR50.72 & 50.73 ML20210P1651986-05-0606 May 1986 Amend 84 to License DPR-6,adding Condition to CRD Surveillance Testing Requiring Testing Prior to Startup Following Outages of More than 120 Days ML20141N6561986-03-10010 March 1986 Amend 83 to License DPR-6,revising Tech Specs to Incorporate Name Change & Revised Staff Organization Chart & to Correct Typo ML20154A0781986-02-12012 February 1986 Amend 82 to License DPR-6,incorporating Requirement to Adhere to Plan for Big Rock Point Integrated Assessment & Terms for Implementing Changes to Plan Contents ML20205F6001985-11-0101 November 1985 Amend 81 to License DPR-6,revising Tech Specs Re Reload I1 Fuel MAPLHGR Limits & Min Critical Power Ratio to Support Fuel Reloading ML20133N3881985-10-22022 October 1985 Amend 79 to License DPR-6,re Changes to Several Tech Spec Surveillance Frequencies to Provide for Operation Between Refueling Shutdowns W/O Potential Surveillance Test Performance Interruptions ML20137W3101985-10-0202 October 1985 Amend 78 to License DPR-6,modifying Tech Specs by Implementing Definition of Operability & Incorporating Limiting Conditions for Operation for Redundant Safety Sys ML20134K1891985-08-26026 August 1985 Amend 77 to License DPR-6,incorporating Radiological Effluent Tech Specs Which Meet Requirements of 10CFR50,App I & Including Administrative Changes Which Relocate & Reformat Tech Specs ML20128H8151985-07-0101 July 1985 Amend 76 to License DPR-6,approving Administrative Control Tech Spec Changes Re Offsite Corporate Reorganizations of Util QA & Nuclear Activities Plant Organizations ML20126A4331985-06-10010 June 1985 Amend 75 to License DPR-6,incorporating Description of & Operating Requirements for New Stack Gas Monitoring Sys ML20126E7001985-06-0707 June 1985 Amend 74 to License DPR-6,modifying Tech Specs to Include Modified Reactor Encl Treated Waste Line Isolation Valve in List of Local Leak Rate Tested Automatic Containment Isolation Valves ML20126E1851974-11-0505 November 1974 Amend 8 to License DPR-6,adding Interim Surveillance Requirements Pending Completion of High Energy Fluid Piping Sys Mods ML20126E1111974-07-18018 July 1974 Amend 6 to License DPR-6,permitting Removal of Four Lower Rollers on Each Remaining 15 Peripheral Control Rods 1998-12-24 Category:TEXT-LICENSE APPLICATIONS & PERMITS MONTHYEARML20206N2621999-05-11011 May 1999
[Table view]Application for Amend to License DPR-6 to Delete from Defueled Ts,Subsection 1.16,change Definition of Site & Other Associated Editorial Changes ML20198K6581998-12-24024 December 1998 Amend 120 to License DPR-6,changing License DPR-6 & App a, TS to Reflect Permanetly Shutdown & Defueled Status of Plant ML20217F5191998-03-28028 March 1998 Application for Amend to License DPR-6,per 10CFR50.90 Re Security Plan.Encl Withheld ML20141J8651997-08-14014 August 1997 Amend 119 to License DPR-6,revising Plant License & TS to Reflect Company Name Change from CPC to Consumers Energy Co ML20138G1961997-04-30030 April 1997 Application for Amend to License DPR-6,requesting Name Change from Consumers Power Company to Consumers Energy Company, to Reflect Broader Scope of Energy Resources Available Through Company ML20138A9061997-04-22022 April 1997 Application for Amend to License DPR-6,requesting Change to TS to Withdraw Petition to Implement Option B Performance Based Requirements to App J of 10CFR50 ML20137J9321997-04-0202 April 1997 Amend 118 to License DPR-6,revising TS 4.2.9,to Add Additional Air Compressor ML20134H6281996-11-0707 November 1996 Application for Amend to License DPR-6,adding New Air Compressor to Svc Air Segment of Svc & Instrument Air Sys ML20129C4611996-10-15015 October 1996 Application for Amend to License DPR-3,implementing Option B to Allow Use of Type a Test (Containment) Type B Test (Pneumatic Tests to Detect & Measure Local Leakage Rates Across Pressure Retaining Boundaries) & Type C Test ML20058A1511993-11-15015 November 1993 Amend 112 to License DPR-6,changing TS to Implement Reorganization of Plant Staff ML20057E1951993-10-0505 October 1993 Amend 111 to License DPR-6,changing Reporting Requirements for Effluent Releases from Semiannual to Annual ML20056G3811993-08-24024 August 1993 Application for Amend to License DPR-6,revising 930719 Original Change,Reflects Revision to 10CFR50.36(a)(2) Re Changing Reporting Requirement for Effluent Releases from Semiannual to Annual ML20056E1651993-08-16016 August 1993 Amend 110 to License DPR-6,clarifying TS Re Undervoltage Breakers in RPS ML20128D7081993-01-29029 January 1993 Application for Amend to License DPR-6,revising TS to Reflect Administrative Changes in Engineering,Offsite Review & QA Organization ML20059A2091990-08-14014 August 1990 Application for Amend to License DPR-6,reflecting Administrative & Organizational Changes ML20246D2351989-08-16016 August 1989 Amend 100 to License DPR-6,revising Tech Specs to Provide for New Organizational Unit Entitled Nuclear Safety Svcs Dept to Discharge Offsite Safety Review Functions Instead of Nuclear Safety Board ML20245H8341989-07-28028 July 1989 Amend 98 to License DPR-6,requiring Compliance W/Amended Physical Security Plan ML20248C0571989-05-31031 May 1989 Amend 97 to License DPR-6,adding Operability & Surveillance Requirements for Alternate Shutdown Sys to Tech Spec Sections 11 & 12 & Including Tech Specs for Active Fire Barriers & Fire Detection Instrumentation ML20247L0891989-05-25025 May 1989 Application for Amend to License DPR-6,to Align Specs to 10CFR50,App J Requirements That Permit Removal of 24 H Duration Restriction on Integrated Leak Rate Test ML20246L8191989-05-0202 May 1989 Amend 96 to License DPR-6,revising OL to Allow for Increase in Amount of Byproduct Matl Plant May Possess & Use from 10.5 to 45 Ci Cs-137,as Sealed Sources ML20245F8251989-04-14014 April 1989 Amend 95 to License DPR-6,changing Tech Specs to Include Second Vent & Second Drain Valve to Scram Dump Tank ML20235J0231989-02-15015 February 1989 Amend 94 to License DPR-6,revising Station Battery Surveillance Test Time from 8 to 2 H ML20205S1241988-11-0404 November 1988 Amend 93 to License DPR-6,modifying Tech Specs by Replacing Requirements to partial-stroke Test Reactor Depressurization Sys Depressurizing Valves Quarterly W/Requirement to full- Stroke Test for Depressurizing Valves Each Outage ML20205P6231988-10-24024 October 1988 Application for Amend to License DPR-6,deleting Tech Spec Requirements to Calibr Portable Gamma & Neutron dose-rate Measuring Instruments at Least Once Every 3 Months & Instead Follow ANSI N323-1978 ML20154S6371988-09-22022 September 1988 Application for Amend to License DPR-6,allowing Independent Review & Audit Functions by Independent Organizational Unit Rather than Standing Committee.Changes Consistent W/Bwr STS, ANSI N18.7-1976 & ANS 3.1-1987.Fee Paid ML20154P2111988-09-21021 September 1988 Application for Amend to License DPR-6,revising Tech Specs to Provide Clarification & Consistency by Reflecting Administrative & Editorial Corrections.Fee Paid ML20154G1081988-09-14014 September 1988 Amend 92 to License DPR-6,modifying Paragraph 2.C.(5) of License Re Physical Security ML20154D4761988-09-0808 September 1988 Application for Amend to License DPR-6,proposing Removal of Organization Charts from Tech Specs & Informing NRC of Onsite Organizational Changes.Fee Paid ML20150C7831988-07-0505 July 1988 Application for Amend to License DPR-6,changing Tech Specs Re Reactor Depressurization Sys (Rds) Surveillance Testing, Eliminating Quarterly Partial Stroke Exercising of Rds Depressurizing Valves ML20154J1871988-05-17017 May 1988 Amend 91 to License DPR-6,changing Tech Specs to Reflect Features & Terminology Used W/New out-of-core Power Range Instrumentation ML20154H5251988-05-17017 May 1988 Amend 90 to License DPR-6,allowing Inclusion of All Reloads of I Fuel Design in Tech Specs ML20148H6271988-03-22022 March 1988 Application for Amend to License DPR-6,changing Tech Specs Re Frequency of Reactor Depressurization Sys Depressurizing Valve Testing ML20237B9661987-12-14014 December 1987 Application for Amend to License DPR-6,removing Numerical Designator from I-type Fuel for Fuel Operating Cycle.Fee Paid ML20236N5021987-11-0909 November 1987 Application for Amend to License DPR-6,changing Tech Specs Administratively to Reflect Features & Terminology Used W/ New out-of-core Power Range Nuclear Instrumentation ML20236B3221987-07-23023 July 1987 Application for Amend to License DPR-6,consisting of Accumulated Administrative Changes ML20211P1321987-02-19019 February 1987 Amend 89 to License DPR-6,revising Tech Spec Section 5.2.1.b to Add Table of Uncertainty Factors Re Analysis of Core Thermal Hydraulic Parameters for Reload I-2 Fuel & to Provide Footnotes Delineating Use of Values ML20211N5181987-02-17017 February 1987 Amend 88 to License DPR-6,revising Tech Spec Section 5.1 to Reflect Use of New Nucom,Inc Hybrid Control Rods in Cycle 22 Core ML20210C5961987-02-0404 February 1987 Application for Amend to License DPR-6,changing Tech Spec Section 5.2.1.b by Adding Table of Uncertainty Factors Associated W/Analysis of Core thermal-hydraulic Parameters Heat Flux,Maplhgr & Max Bundle Power ML20209H0481987-01-28028 January 1987 Amend 87 to License DPR-6,changing Tech Specs to Reflect Features & Terminology Used in Conjunction W/Installation of New source-range Monitoring Instrumentation ML20212F0301986-12-30030 December 1986 Application for Amend to License DPR-6,changing Tech Specs to Include Second Scram Dump Tank Vent & Drain Valve ML20207C9541986-12-22022 December 1986 Application to Amend License DPR-6,revising Tech Specs to Reduce Station Battery Design Time Interval from 8 to 2 H. Fee Paid ML20210E5141986-12-17017 December 1986 Application for Amend to License DPR-6,adding Operability & Surveillance Requirements for Alternate Shutdown Sys & Revising Tech Specs for Active Fire Barriers & Fire Detection Instrumentation for Auxiliary Shutdown Bldg ML20215F9941986-12-17017 December 1986 Application for Amend to License DPR-6,changing Tech Specs to Add Operability & Surveillance Requirements for Alternate Shutdown Sys Installed Per 10CFR50,App R & Generic Ltr 81-12.Request Supersedes 860421 Application ML20215C7211986-12-0505 December 1986 Application to Amend License DPR-6,revising Tech Specs to Reflect Use of New Hybrid Control Rods Mfg by Nucom,Inc & to Include Reload I-2 Fuel.Fee Paid ML20206M5081986-08-15015 August 1986 Application for Amend to License DPR-6,changing Tech Specs to Reflect Features & Terminology Used W/New out-of-core source-range Nuclear Instrumentation ML20211P3751986-07-11011 July 1986 Amend 86 to License DPR-6,adding Tech Spec Table Sentence Establishing Min Requirements for Shift Crew Composition During Various Operating Conditions ML20198A3801986-05-12012 May 1986 Amend 85 to License DPR-6,adding Definition for Reportable Event & Deleting Reporting Requirements Included in 10CFR50.72 & 50.73 ML20210P1651986-05-0606 May 1986 Amend 84 to License DPR-6,adding Condition to CRD Surveillance Testing Requiring Testing Prior to Startup Following Outages of More than 120 Days ML20203P8021986-05-0101 May 1986 Application for Amend to License DPR-6,revising Tech Specs to Ensure Consistency w/831230 Exemption from Requirement to Have Two Senior Reactor Operators on Shift ML20203F6461986-04-21021 April 1986 Application for Amend to License DPR-6,changing Tech Specs Re Alternate Shutdown Battery Sys Operability & Surveillance Requirements 1999-05-11 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20056E165&oldid=3633007"