Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20206N262 | 11 May 1999 | Application for Amend to License DPR-6 to Delete from Defueled Ts,Subsection 1.16,change Definition of Site & Other Associated Editorial Changes | |
ML20198K658 | 24 December 1998 | Amend 120 to License DPR-6,changing License DPR-6 & App a, TS to Reflect Permanetly Shutdown & Defueled Status of Plant | High Radiation Area Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Control of Heavy Loads Fire Protection Program |
ML20217F519 | 28 March 1998 | Application for Amend to License DPR-6,per 10CFR50.90 Re Security Plan.Encl Withheld | Fuel cladding |
ML20141J865 | 14 August 1997 | Amend 119 to License DPR-6,revising Plant License & TS to Reflect Company Name Change from CPC to Consumers Energy Co | Process Control Program Power change |
ML20138G196 | 30 April 1997 | Application for Amend to License DPR-6,requesting Name Change from Consumers Power Company to Consumers Energy Company, to Reflect Broader Scope of Energy Resources Available Through Company | Process Control Program Power change |
ML20138A906 | 22 April 1997 | Application for Amend to License DPR-6,requesting Change to TS to Withdraw Petition to Implement Option B Performance Based Requirements to App J of 10CFR50 | Offsite Dose Calculation Manual |
ML20137J932 | 2 April 1997 | Amend 118 to License DPR-6,revising TS 4.2.9,to Add Additional Air Compressor | |
ML20134H628 | 7 November 1996 | Application for Amend to License DPR-6,adding New Air Compressor to Svc Air Segment of Svc & Instrument Air Sys | |
ML20129C461 | 15 October 1996 | Application for Amend to License DPR-3,implementing Option B to Allow Use of Type a Test (Containment) Type B Test (Pneumatic Tests to Detect & Measure Local Leakage Rates Across Pressure Retaining Boundaries) & Type C Test | High Radiation Area Offsite Dose Calculation Manual Process Control Program |
ML20058A151 | 15 November 1993 | Amend 112 to License DPR-6,changing TS to Implement Reorganization of Plant Staff | |
ML20057E195 | 5 October 1993 | Amend 111 to License DPR-6,changing Reporting Requirements for Effluent Releases from Semiannual to Annual | |
ML20056G381 | 24 August 1993 | Application for Amend to License DPR-6,revising 930719 Original Change,Reflects Revision to 10CFR50.36(a)(2) Re Changing Reporting Requirement for Effluent Releases from Semiannual to Annual | |
ML20056E165 | 16 August 1993 | Amend 110 to License DPR-6,clarifying TS Re Undervoltage Breakers in RPS | |
ML20128D708 | 29 January 1993 | Application for Amend to License DPR-6,revising TS to Reflect Administrative Changes in Engineering,Offsite Review & QA Organization | |
ML20059A209 | 14 August 1990 | Application for Amend to License DPR-6,reflecting Administrative & Organizational Changes | |
ML20246D235 | 16 August 1989 | Amend 100 to License DPR-6,revising Tech Specs to Provide for New Organizational Unit Entitled Nuclear Safety Svcs Dept to Discharge Offsite Safety Review Functions Instead of Nuclear Safety Board | Offsite Dose Calculation Manual Process Control Program Fire Protection Program |
ML20245H834 | 28 July 1989 | Amend 98 to License DPR-6,requiring Compliance W/Amended Physical Security Plan | |
ML20248C057 | 31 May 1989 | Amend 97 to License DPR-6,adding Operability & Surveillance Requirements for Alternate Shutdown Sys to Tech Spec Sections 11 & 12 & Including Tech Specs for Active Fire Barriers & Fire Detection Instrumentation | Offsite Dose Calculation Manual Fire Barrier Process Control Program Continuous fire watch Fire Protection Program Fire Watch |
ML20247L089 | 25 May 1989 | Application for Amend to License DPR-6,to Align Specs to 10CFR50,App J Requirements That Permit Removal of 24 H Duration Restriction on Integrated Leak Rate Test | |
ML20246L819 | 2 May 1989 | Amend 96 to License DPR-6,revising OL to Allow for Increase in Amount of Byproduct Matl Plant May Possess & Use from 10.5 to 45 Ci Cs-137,as Sealed Sources | |
ML20245F825 | 14 April 1989 | Amend 95 to License DPR-6,changing Tech Specs to Include Second Vent & Second Drain Valve to Scram Dump Tank | Shutdown Margin |
ML20235J023 | 15 February 1989 | Amend 94 to License DPR-6,revising Station Battery Surveillance Test Time from 8 to 2 H | |
ML20205S124 | 4 November 1988 | Amend 93 to License DPR-6,modifying Tech Specs by Replacing Requirements to partial-stroke Test Reactor Depressurization Sys Depressurizing Valves Quarterly W/Requirement to full- Stroke Test for Depressurizing Valves Each Outage | |
ML20205P623 | 24 October 1988 | Application for Amend to License DPR-6,deleting Tech Spec Requirements to Calibr Portable Gamma & Neutron dose-rate Measuring Instruments at Least Once Every 3 Months & Instead Follow ANSI N323-1978 | |
ML20154S637 | 22 September 1988 | Application for Amend to License DPR-6,allowing Independent Review & Audit Functions by Independent Organizational Unit Rather than Standing Committee.Changes Consistent W/Bwr STS, ANSI N18.7-1976 & ANS 3.1-1987.Fee Paid | Offsite Dose Calculation Manual Process Control Program Fire Protection Program |
ML20154P211 | 21 September 1988 | Application for Amend to License DPR-6,revising Tech Specs to Provide Clarification & Consistency by Reflecting Administrative & Editorial Corrections.Fee Paid | |
ML20154G108 | 14 September 1988 | Amend 92 to License DPR-6,modifying Paragraph 2.C.(5) of License Re Physical Security | |
ML20154D476 | 8 September 1988 | Application for Amend to License DPR-6,proposing Removal of Organization Charts from Tech Specs & Informing NRC of Onsite Organizational Changes.Fee Paid | |
ML20150C783 | 5 July 1988 | Application for Amend to License DPR-6,changing Tech Specs Re Reactor Depressurization Sys (Rds) Surveillance Testing, Eliminating Quarterly Partial Stroke Exercising of Rds Depressurizing Valves | |
ML20154J187 | 17 May 1988 | Amend 91 to License DPR-6,changing Tech Specs to Reflect Features & Terminology Used W/New out-of-core Power Range Instrumentation | |
ML20154H525 | 17 May 1988 | Amend 90 to License DPR-6,allowing Inclusion of All Reloads of I Fuel Design in Tech Specs | |
ML20148H627 | 22 March 1988 | Application for Amend to License DPR-6,changing Tech Specs Re Frequency of Reactor Depressurization Sys Depressurizing Valve Testing | Stroke time |
ML20237B966 | 14 December 1987 | Application for Amend to License DPR-6,removing Numerical Designator from I-type Fuel for Fuel Operating Cycle.Fee Paid | |
ML20236N502 | 9 November 1987 | Application for Amend to License DPR-6,changing Tech Specs Administratively to Reflect Features & Terminology Used W/ New out-of-core Power Range Nuclear Instrumentation | |
ML20236B322 | 23 July 1987 | Application for Amend to License DPR-6,consisting of Accumulated Administrative Changes | |
ML20211P132 | 19 February 1987 | Amend 89 to License DPR-6,revising Tech Spec Section 5.2.1.b to Add Table of Uncertainty Factors Re Analysis of Core Thermal Hydraulic Parameters for Reload I-2 Fuel & to Provide Footnotes Delineating Use of Values | |
ML20211N518 | 17 February 1987 | Amend 88 to License DPR-6,revising Tech Spec Section 5.1 to Reflect Use of New Nucom,Inc Hybrid Control Rods in Cycle 22 Core | Fuel cladding |
ML20210C596 | 4 February 1987 | Application for Amend to License DPR-6,changing Tech Spec Section 5.2.1.b by Adding Table of Uncertainty Factors Associated W/Analysis of Core thermal-hydraulic Parameters Heat Flux,Maplhgr & Max Bundle Power | |
ML20209H048 | 28 January 1987 | Amend 87 to License DPR-6,changing Tech Specs to Reflect Features & Terminology Used in Conjunction W/Installation of New source-range Monitoring Instrumentation | Shutdown Margin |
ML20212F030 | 30 December 1986 | Application for Amend to License DPR-6,changing Tech Specs to Include Second Scram Dump Tank Vent & Drain Valve | |
ML20207C954 | 22 December 1986 | Application to Amend License DPR-6,revising Tech Specs to Reduce Station Battery Design Time Interval from 8 to 2 H. Fee Paid | Battery sizing |
ML20215F994 | 17 December 1986 | Application for Amend to License DPR-6,changing Tech Specs to Add Operability & Surveillance Requirements for Alternate Shutdown Sys Installed Per 10CFR50,App R & Generic Ltr 81-12.Request Supersedes 860421 Application | Safe Shutdown Fire Barrier Fire Protection Program |
ML20210E514 | 17 December 1986 | Application for Amend to License DPR-6,adding Operability & Surveillance Requirements for Alternate Shutdown Sys & Revising Tech Specs for Active Fire Barriers & Fire Detection Instrumentation for Auxiliary Shutdown Bldg | Safe Shutdown Fire Barrier Fire Protection Program |
ML20215C721 | 5 December 1986 | Application to Amend License DPR-6,revising Tech Specs to Reflect Use of New Hybrid Control Rods Mfg by Nucom,Inc & to Include Reload I-2 Fuel.Fee Paid | |
ML20206M508 | 15 August 1986 | Application for Amend to License DPR-6,changing Tech Specs to Reflect Features & Terminology Used W/New out-of-core source-range Nuclear Instrumentation | Shutdown Margin |
ML20211P375 | 11 July 1986 | Amend 86 to License DPR-6,adding Tech Spec Table Sentence Establishing Min Requirements for Shift Crew Composition During Various Operating Conditions | |
ML20198A380 | 12 May 1986 | Amend 85 to License DPR-6,adding Definition for Reportable Event & Deleting Reporting Requirements Included in 10CFR50.72 & 50.73 | Annual Radiological Environmental Operating Report |
ML20210P165 | 6 May 1986 | Amend 84 to License DPR-6,adding Condition to CRD Surveillance Testing Requiring Testing Prior to Startup Following Outages of More than 120 Days | Squib |
ML20203P802 | 1 May 1986 | Application for Amend to License DPR-6,revising Tech Specs to Ensure Consistency w/831230 Exemption from Requirement to Have Two Senior Reactor Operators on Shift | Fire Protection Program |
ML20203F646 | 21 April 1986 | Application for Amend to License DPR-6,changing Tech Specs Re Alternate Shutdown Battery Sys Operability & Surveillance Requirements | Safe Shutdown Fire Barrier Fire Protection Program |