Forwards Weekly Status Rept for 860703-09
ML20211C010
Person / Time
Site: Pilgrim
Issue date: 07/10/1986
From: Strosnider J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Kister H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20210F497 List:
References
FOIA-87-10 NUDOCS 8702190670
Download: ML20211C010 (3)


Text

-D

. 2

[

R3.s1 s 'N 10 JUL s86 Docket No. 50-293 MEMORANDUM FOR: Harry Kister, Chief Projects Branch No. I FROM: Jack R. Strosnider, Chief Reactor Projects Section IB

SUBJECT:

PILGRIM STATUS REPORT FOR THE PERIOD JULY 3 - JULY 9, 1986 Enclosed is the Pilgrim weekly status report from the NRC Resident Office at Pilgrim. Three NRC Resident Insoectors monitored routine activities at the plant during the report pericd. Ir.e reactor remained in cold shutdown throughout the period for .Tainteaar.:e.

These status reports are interded tc, provide NRC management and the pubite with an overview of plant activities and NRC inspection activities.

Subsequent inspection reports wi!I address many of these topics in mare detail, ack R. Strosnider, Chief Reactor Projects Section IB F01 A - 9 1 * ' '

F/J.

V- W 8702190670 870213 PDR FOIA PDR TYE87-010

3 2

cc w/ encl:

T. Murley, NRC, RI R. Starostecki, ARR, RI S. Ebneter, NRC, ;I T. Martin, NRR, RI J. Partlow, NRC, IE W. Kane, NRR, RI J. Zwolinski, NRC, NRR J. Lydon, Chief Operating Officer, BECO L. Oxsen, Vice President, Nuclear Operations, BECO A. Pederson, Station Manager, BECO Paul Levy, Chair. man, Department of Public Utilities Chairman, Board of Selectmen J. D. Keyes Plymouth Civil Defense Director Senator Edward P. Kiroy S. M. Pollard Public Document Room (POR)

Local Public Document Room (LPOR)

Nuclear Safety Ir. formation Center (NSIC)

NRC Resident Instector Commonwealtn of Massacnusetts (2) bcc w/ encl:

Region I Docket Rcom (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Sec+ inn Chie,f W. Raymond, SRI, Vermont Yankee T. Shedlosky, SRI, Millstone 1&2 H. Eichenholz, SRI, Yankee P. Leech, LPM, NRR PA0 (2)

ENCLOSURE PILGRIM STATUS REPORT FOR THE PERIOD JULY 3 - JULY 9, 1986 1.0 Plant Status As of 8:00 a.m. on July 3, 1986, the reactor was in cold shutdown with the reactor coolant temperature about 120 degrees Fahrenheight.

2.0 Facility Operations Summary The plant has been shut down for maintenance and to make program improvements since April 12, 1986. Boston Edison Company announced that planned inspections of all four (4) Residual Heat Removal pumps in the Emergency Core Cooling System, conduct of local leak rate testing and integrated leak rate testing will lengthen the current outage.

3.0 Items of Special Interest Containment Leakage Testing Since April 12, 1936, 62 containment penetrations have been tested with one failure. That failure was of the outside hatch of a drywell access penetration. The inside hatch in the penetration passed the leak rate test. Leakage tests on 43 containment isolation valves have been conducted with 11 tests exceeding acceptance criteria. Specific test failures identified during this week include an isolation valve on the supply line to the reactor water cleanup system. A redundant isolation valve on this line has been tested and showed an acceptable leakage rate.

4.0 NRC Staff Status during the Period Three NRC Resident Inspectors monitored plant activities between July 3 and July 9, 1986. Currently, the resident inspector staff at Pilgrim consists of the following:

Martin McBride, Pn.0. --- Senior Resident Inspector Jeffrey Lyash --- Resident Inspector Gregory Nejfelt --- Resident inspector l NRC inspection report 86-22, regarding the June 12, 1986 NRC management meeting with BECO, was issued en July 1,1986.

i E