Category:Letter
MONTHYEARIR 05000361/20240052024-10-0404 October 2024 NRC Inspection Report 05000361/2024005 and 05000362/2024005 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 07200041/20244012024-08-16016 August 2024 San Onofe Nuclear Generating Station, Security Baseline Inspection Report 07200041/2024401 IR 05000361/20240042024-08-0909 August 2024 NRC Inspection Report 05000361/2024004 and 05000362/2024004 ML24191A2472024-07-0202 July 2024 (Songs), Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation - Revision to the ISFSI-Only Emergency Plan and Associated Changes to Emergency Plan Implementing Procedures ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24141A0802024-05-15015 May 2024 (Songs), Units 1, 2 and 3 and Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Operating Report IR 05000361/20240022024-04-0101 April 2024 – NRC Inspection Report 050-00361/2024-002 and 050-00362/2024-002 ML24094A0642024-03-27027 March 2024 Independent Spent Fuel Storage Installation, Decommissioning Funding Status Report 2023 ML24065A0152024-02-28028 February 2024 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation 2023 ML24044A0812024-02-14014 February 2024 LTR-24-0008: NRC Response to Paul Blanch Email Safety of Spent Nuclear Fuel at SONGS ISFSI IR 05000361/20240012024-02-13013 February 2024 NRC Inspection Report 050-00361/2024-001 and 050-00362/2024-001 (1) ML24037A0542024-01-30030 January 2024 (Songs), Units 2 and 3, Submittal of Annual Corporate Financial Reports ML24022A1492024-01-17017 January 2024 Independent Spent Fuel Storage Installation, Revision 4 to the Physical Security Plan ML24017A2432024-01-15015 January 2024 LTR-24-0008 Paul Blanch, E-mails Request for Formal Response to Requests for Meeting to Discuss Safety Issues with NRC Staff IR 05000361/20230062023-11-29029 November 2023 NRC Inspection Report 05000361/2023-006 and 05000362/2023-006 ML23333A0682023-11-22022 November 2023 (SONGS) Units 1, 2, 3 and Independent Spent Fuel Storage Installation - Notification of Change in Nuclear Officer IR 05000361/20230052023-10-11011 October 2023 NRC Inspection Report 05000361/2023005 and 05000362/2023005 ML23276A5942023-09-28028 September 2023 and Independent Spent Fuel Storage Installation - Supplement to Decommissioning Funding Status Reports ML23268A0922023-09-20020 September 2023 Generation Station, Units 1, 2 and 3, and the Independent Spent Fuel Storage Facility (ISFSI) - Re-Registration of Dry Fuel Storage Casks for Amended Certificate of Compliance No. 1040 IR 05000361/20230012023-09-13013 September 2023 NRC Inspection Report 05000361 2023-001 and 05000362 2023-004 ML23240A5372023-08-18018 August 2023 Confirmatory Survey Activities Summary and Results for the Unit 2 and 3 Intake Structures at the San Onofre Nuclear Generating Station San Clemente CA ML23129A1802023-06-14014 June 2023 Cover Letter to State of CA on Draft EA Regarding San Onofre ISFSI Updated DFPs IR 05000361/20230032023-05-31031 May 2023 NRC Inspection Report 05000361/2023003 and 05000362/2023003 IR 05000361/20230022023-05-23023 May 2023 NRC Inspection Report 05000361/2023-002 and 05000362/2023-002 ML23137A1032023-05-11011 May 2023 (Songs), Units 1, 2 and 3, and Independent Spent Fuel Storage Installation - 2022 Annual Radiological Environmental Operating Report ML23123A0932023-04-28028 April 2023 (Songs), Units 1, 2 and 3, Submittal of Annual Radioactive Effluent Release Report - 2022 ML23230A0882023-04-10010 April 2023 Independent Spent Fuel Storage Installation - Decommissioning Quality Assurance Plan ML23094A1272023-03-29029 March 2023 Independent Spent Fuel Storage Installation - 10 CFR 50.82(a)(8)(v and VII) and 10 CFR 72.30(c) Decommissioning Funding Status Report 2021 ML23094A1332023-03-29029 March 2023 Nuclear Property Insurance ML23062A1172023-02-28028 February 2023 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2022 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23059A2812023-02-22022 February 2023 (Songs), Units 1, 2 and 3, 2022 Annual Turtle Incidental Take Report ML23046A3792023-02-22022 February 2023 NRC Inspection Report 050-00361/2023-001 and 050-00362/2023-001 ML23045A2022023-02-0909 February 2023 Submittal of Annual Corporate Financial Reports for San Onofre Nuclear Generating Station (SONGS) Units 2 and 3 for Fy Ending June 30, 2022 ML22287A1352023-01-0505 January 2023 Issuance of Exemption from Title 10 of the Code of Federal Regulations Part 72.106(B), Independent Spent Fuel Storage Installation Controlled Area Boundary (L-2021-LLE-0056) ML22348A0622023-01-0404 January 2023 NRC to SCE, Transmittal of the National Marine Fisheries Service'S December 12, 2022, Letter of Concurrence for Decommissioning of San Onofre Nuclear Generating Statiion, Units 2 and 3 IR 05000206/20220062022-12-15015 December 2022 NRC Inspection Report 05000206/2022006, 05000361/2022-006, and 05000362/2022-006 ML22347A2122022-12-12012 December 2022 NMFS to NRC, Endangered Species Act Section 7(a)(2) Concurrence Letter for Decommissioning of the San Onofre Nuclear Generating Station ML22340A6652022-12-0505 December 2022 Letter from John Fassell, Chief; Re., State of California Department of Public Health Review and Comments on SONGS Draft Environmental Assessment ML22333A8192022-11-21021 November 2022 Submittal of San Onofre Nuclear Generating Station, Units 2 and 3, Defueled Safety Analysis Report, Revised November 2022 IR 05000361/20220052022-11-17017 November 2022 NRC Inspection Report 05000361/2022-005 and 05000362/2022-005 ML22301A1462022-10-20020 October 2022 Report of Violations of the National Pollutant Discharge Elimination System Permit San Onofre Nuclear Generating Station (Songs), Units 2 and 3 ML22277A0162022-09-29029 September 2022 Independent Spent Fuel Storage Installation Response to Request for Additional Information Regarding Request for Exemption from 10 CFR 72.106(b) IR 05000361/20220042022-09-26026 September 2022 NRC Inspection Report 05000361/2022-004 and 05000362/2022-004 ML22238A0552022-08-29029 August 2022 U.S. Nuclear Regulatory Commission'S Analysis of Southern California Edison'S Decommissioning Funding Status Report for San Onofre Nuclear Generating Station, Units 1, 2, and 3 ML22234A1602022-07-31031 July 2022 Final Report Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 18CLVS431 ML22207B8612022-07-26026 July 2022 NRC (Public) Inspection Report 05000361/2022003; 05000362/2022003 IR 05000361/20220032022-07-26026 July 2022 NRC Inspection Report (Public) 05000361-2022003 and 05000362-2022003 (002) IR 05000361/20220022022-05-12012 May 2022 NRC Inspection Report 05000361/2022-002 and 05000362/2022-002 2024-09-18
[Table view] |
Text
r.!f!!!!!~~,
~*-*~
1 ELECTRIC POWER RESEARCH INSTITUTE Date: April 21, 2021 To: Anna Bradford, Director of the Division of New and Renewed Licenses
Subject:
San Onofre Nuclear Generating Station Lessons Learned
Reference:
Nuclear Regulatory Commission Letter to Eric Larson, Executive Chairman of the Steam Generator Management Program (SGMP), dated August 13, 2014, "San Onofre Nuclear Generating Station Lessons Learned, ML14206A841" (copy attached)
Purpose:
The purpose of this letter is to inform the NRC that SGMP' s work regarding in-plane fluid-elastic instability (IP-FED is complete.
Dear Director Bradford:
After the event at San Onofre, the SGMP began a test program to investigate the onset ofIP-FEI.
As requested in the reference letter, the SGMP provided updates to the NRC technical staff as the testing progressed. The latest update, provided October 28, 2020, contains the conclusions of the test program. No US operating steam generator is considered susceptible to IP FEI, and learnings from the tests are being incorporated into our guideline documents. SGMP also participated on an ASME Code committee to incorporate guidance in Section III, Appendix N for new SO designs.
If you have further questions, please contact me at michael.classe@duke-energy.com or (704) 719-0136.
Sincerely, Michael Classe, Director of Fleet Engineering Components - Duke Energy EPRI Steam Generator Management Program Executive Sponsor cc: Steve Bloom Attachment Together . .. Shaping the Future of Electricity CHARLOfflOPl'ICI 1300 WMt W.T. Hanis Boulevard, Charlotte, NC 28262-8550 USA* 70.4.595.2000
- Fax 70.4.595.2860 Cuslo~ Service 800.313.377.4
August 13, 2014 Eric Larson, Executive Chairman Steam Generator Management Program First Energy Nuclear Operating Company PO Box4 Shippingport, PA 15077-0004
Subject:
San Onofre Nuclear Generating Station Lessons Learned Mr. Larson:
The steam generator tubes at San Onofre Nuclear Generating Station (SONGS), Unit 3, became susceptible to in-plane fluid-elastic instability during the first cycle of normal operation.
This phenomenon resulted in the steam generator tubes impacting each other in the U-bend region and causing tube wear. As a result of this wear, eight tubes failed to meet the steam generator performance criteria specified in the plant's technical specifications. The susceptibility of the tubes to fluid-elastic instability was attributed to aggressive thermal hydraulic conditions coupled with the ineffectiveness of the anti-vibration bars in mitigating in-plane motion of the U-bends. The anti-vibration bars are intended to provide out-of-plane support to the U-bend region of the tubes, although friction between the tube and the anti-vibration bar may provide some resistance to in-plane motion.
In a memorandum to the U.S. Nuclear Regulatory Commission (NRC) staff dated March 20, 2014 (ADAMS Accession No. ML14028A028), the Executive Director of Operations (EDO) tasked the NRC staff with performing an evaluation of the lessons learned from the SONGS tube degradation event. One of the eight topical areas of review outlined in the EDO memorandum was a steam generator (SG) technical review, which was to be perfonned by the Office of Nuclear Reactor Regulation. This letter addresses Item of Consideration (4) outlined under the SG Technical Review topical area of the EDO memorandum, which involves reviewing standards and criteria for SGs.
The events at San Onofre not only raise questions about industry standards for designing and fabricating steam generators, but also raise questions about the operation of existing steam generators. The issue could affect operating steam generators since steam generator secondary side thermal hydraulic conditions could change as a result of SG tube plugging, changes to reactor T hot or T _,, power uprates, and buildup of deposits on the secondary side of the steam generator. In addition, the support provided by anti-vibration bars may change (become ineffective) as a result of wear between the tubes and the anti-vibration bars, changing the tubes' susceptibility to fluid-elastic instability.
As a result of the steam generator event at San Onofre in 2012, the NRC staff is assessing whether any changes are needed to industry standards (e.g., Appendix N of Sectior:i Ill of the
ML14206A841 OFFICE NRR/DE NRR/DE NRR/DE/ESGB NRR/DE NAME KKarwoski KManoly GKulesa PHiland DATE 07/ 30 /2014 07/31/2014 08/ 13 /2014 08 / 13 /2014