ML17229A173

From kanterella
Revision as of 08:29, 24 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 96-005-00:on 961206,Determined That Independent Operability of Trip Coils Had Not Been Adequately Tested. Caused by Inadequate Surveillance Procedure.Performed Testing of Coils & Revised Procedures.W/961220 Ltr
ML17229A173
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 12/20/1996
Revision: 0
From: BENKEN E J, STALL J A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-337, LER-96-005-02, LER-96-5-2, NUDOCS 9612260012
Download: ML17229A173 (9)