ML20215C418

From kanterella
Revision as of 12:55, 3 May 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of License Meeting 86-115 on 861010 at Region I Ofc to Discuss SALP Board
ML20215C418
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/30/1986
From: Strosnider J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8610100272
Download: ML20215C418 (2)


Text

.r-.

.a -

SEP 3 01986 -

No.86-115 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Name of Licensee: Pennsylvania Power and Light Company Name of Facility: Susquehanna Steam Electric Station Docket No.: 50-387, 50-388 Time and Date of Meeting: 10:00 a.m., October 10, 1986 Location of Meeting: Region I Office, Executive Conference Room Purpose of Meeting: SALP Board I

NRC Attendees: W. F. Kane, Director, Division of Reactor Projects S. D. Ebneter, Director, Division of Reactor Safety T. T. Martin, Director, Division of Radiation Safety and Safeguards E. G. Adensam, Director, BWR Directorate #3, NRR H. B. Kister, Chief, Reactor Projects Branch No. 1, DRP J. R. Strosnider, Chief, Reactor Projects Section IB, DRP L. R. P11sco, Senior Resident Inspector M. J. Campagnone, Licensing Project Manager, NRR Note: Attendance by NRC personnel at this meeting should be made known by October 6,1986, via telephone call to J. Strosnider, Region I, at FTS 8-488-1128 or (215) 337-5128.

Original Signed Byr Prepared by:

J. R. Strosnider, Chief Reactor Projects Section 18

$Ik0ISD h G

OFFICIAL RECORD COPY 375FUHRMEISTERJ/29/86 - 0001.0.0 09/29/86 # oI (

'e i

L

s~ ,

2 Distribution:

Victor Stello, Jr., Executive Director for Operations James Sniezek, Deputy Executive Director for Regional Operations and Generic Requirements James M. Taylor, Director, Office of Inspection ard Enforcement James G. Partlow, Director, Division of Inspection Programs, IE Jane Axelrad, Director, Enforcement Staff, IE J. Lieberman, Assistant General Counsel for Enforcement, OGC R. M. Bernero, Director, Division of BWR Licensing, NRR E. G. Adensam, Director, BWR Project Directorate #3, NRR M. J. Campagnone, Licensing Project Manager, NRR Public Document Room (PDR) local Public Document Room (LPDR)

DRS Branch Chiefs DRSS Branch Chiefs bec:

Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Region I Receptionist -

PA0 DRMA files 0

RI: DRPH AI:DRP RI:DRP Fuhrmeister Strosnider Kister 9/30'86 9/30/86 9/ 7b/86 0FFICIAL RECORD COPY 375FUHRMEISTER9/29/86 - 0002.0.0 09/29/86