ML17266A372

From kanterella
Revision as of 06:33, 24 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 80-043/03L-0:on 800821,During Normal Operation,Cedm 39 Failed,Dropping CEA to Full Insertion.Cause of Failure Undetermined.Power Supply Unit Replaced.Cedm 39 Returned to Normal Operations
ML17266A372
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/18/1980
Revision: 0
From: PACE P L
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17209A417 List:
References
LER-80-043-03L, LER-80-43-3L, NUDOCS 8012100407
Download: ML17266A372 (1)