ML20216J436

From kanterella
Revision as of 17:51, 5 March 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of 970918 Meeting W/Util in Rockville,Md to Discuss Changes to EOP to Reflect TSs Change Request Re Mitigation of Small Break LOCAs & Associated Design Basis Changes
ML20216J436
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/10/1997
From: Raghavan L
NRC (Affiliation Not Assigned)
To: Hebdon F
NRC (Affiliation Not Assigned)
References
NUDOCS 9709170284
Download: ML20216J436 (4)


Text

- . - . _

September 10. 1997

~

MEMORANDUM-TO: Frederick J. _Hetidon. Director

-Project Directorate 11-3 Division _ of Reactor Projects - I/II FROM: L. Raghavan. Project Manager Original Project Directorate 11-3 signed by-Division of Reactor Projects - I/II

SUBJECT:

MEETING WITH FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DATE & TIME: September- 18, 1997 1:00 PM LOCATION: USNRC, Two White Flint North 11545 Rockville Pike-Rockville. Maryland Room 0 1F05

-PURPOSE: Licensee's prenetation of proposed changes to the emergency o)eraing procedures to reflect its technical specifications clange request relating to mitigation of small break loss of ccolant accidents and associated design basis changes.

  • PARTICIPANTS: tg Florida Power Corocration J. Bongarra J. Holden, et al.

J. Jaudon K. Landis C. Christensen F. Hebdon L. Raghavan  ;

F. Orr .h.fa 1

Docket No. 50-302 i{O cc: See next page CONTACT: L. Raghavan 301/415-1471

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy " 59 Federal Reaister 48344, 9/20/94.

Document Name: G:\ CRYSTAL \970918.not Office PM:PDII-3 LA:PDII-3 PD:PDII-3 Name LRaghavan b BClayton FHebdon4l-Date .09/10/97 09/10/97 09/10/97 Copy h/No Yes/No hes)No 0FFICIAL RECORD COPY iM"In Mika NE FILE CENTER COPY

  1. lll!!I,11,11ll

l

, ;p5** *'%

-p '4 UNITED STATES k -0* j 2

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30666 4 001

  • %, .....} September 10. 1997 MEMORANDUM T0: Frederick J. Hebdon. Director Project Directorate 11-3 Division of Reactor Projects - I/II FROM: L. Raghavan. Project Manager ,[

ProjectDirectorate11-3 /

Division of Reactor Projects - I/II

SUBJECT:

MEETING WITH FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DATE & TIME: September 18, 1997 1:00 PM LOCATION: USNRC. Two White Flint North 11545 Rockville Pike Rockville. Maryland Room 0-1F05-PURPOSE: Licensee's prenetation of proposed changes to the emergency o)eraing procedures to reflect its technical specifications clange request relating to mitigation of small break loss of coolant accidents and asscciated design basis changes.

  • PARTICIPANTS: BRC Florida Power Corocration J. Bongarra J. Holden, et al.

J. Jaudon K. Landis C. Christensen F, Hebdon L. Raghavan F. Orr Docket No. 50-302 cc: See next page CONTACT: L. Raghavan.-NRR 301/415-1471

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy." 59 Federal Reaister 48344. 9/20/94.

j

l . .

Florida Power Corporation CRYSTAL RIVER UNIT NO. 3 i GENERATING PLANT cc:

Mr. R.~ Alexander Glenn Senior Resident Inspector I Corporate Counsel Crystal River Unit 3 Florida Power Corporation U.S. Nuclear Regulatory Commission MAC-ASA 6745 N. Tallahassee Road P.O. Box 14042 Crystal River, Florida 34428 St. Petersburg, Florida 33733-4042 Mr. James S. Baumstark Mr. Bruce J. Hickle, Director Director, Quality Programs (SA2C)

Nuclear Plant Operations (NA2C) Florida Power Corporation Florida Power Corporation Crystal River Energy Complex Crystal River Energy Complex 15760 W. Power Line Street 15760 W. Power Line Street Crystal River, Florida 34428-6708 Crystal River, Florida 34428-6708 Regional Administrator, Region II Mr. Robert B. Borsum U.S. Nuclear Regulatory Commission B&W Nuclear Technologies 61 Forsyth Street, SW., Suite 23T85 1700 Rockville Pike, Suite 525 Atlanta, GA 30303-3415 Rockville, Maryland 20852 Mr. John P. Cowan Mr. Bill Pastetti Vice President - Nuclear Production Office of Radiation Control (NA2E)

Department of Health and Florida Power Corporation Rehabilitative Services Crystal River Energy Complex 1317 Winewood Blvd. 15760 W. Power Line Street Tallahassee, Florida 32399-0700 Crystal River, Florida 34428-6708 l Attorney General Mr. Roy A. Anderson Department of Legal Affairs Senior Vice President, The Capitol Ncclear Operations Tallahassee, Florida 32304 Florida Power Corporation ATTN: Manager, Nuclear Licensing Mr. Joe Myers, Director Crystal River Energy Complex (SA2A)

Division of Emergency Preparedness 15760 W. Power Line Street Department of Community Affairs Crystal Rfier, Florida 34428-6708 2740 Centerview Drive Tallahassee, Florida 32399-2100 Mr. Kerry Landis l U.S. Nuclear Regulatory Commission Chairman 61 Forsyth Street, SW., Suite 23T85 Board of County Commissioners Atlanta, GA 30303-3415 Citrus County 110 North Apopka Avenue Iverness, Florida 34450-4245 Mr. Robert E. Grazio, Director Nuclear Regulatory Affairs (SA2A)

Florida Power Corporation <

Crystal River Energy Complex 15760 W. Power Line Street )

Crystal River, Florida 34428-6708 i

.=_

. g.

DISTRIBUTION FOR MEETING NOTICE DATED: September 10. 1997 E-Mail S. Collins /F. Mira911a R. Zimmerman (RPZ)

8. Boger (BAB2)

J. Zwolinski (JAZ)

F. Hebdon (FJH)

L. Raghavan (LXR1)

B. Clayton (BAC2)

D. Ross (SAM)

OPA (0PA)

T. Martin (TTM)

K. Landis (KDL)

J. Johnson (JRJ)

J. Jaudon (JPJ)

S. Cahill (SJC2)

C. Christensen (H0C)

K. Clark (KMC2). Region II F. Orr (FR0)

J. Bongarra (JXB)

PMNS Hard Cooy

-: Docket > Filer

.PUBLIC"~"

Crystal River Rdg.

0GC ACRS Receptionist

/

t

_ _ . _ -