MONTHYEARML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20205L0301999-04-0909 April 1999 Notification of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generation Co in Rockville,Md to Discuss Sale & Transfer of Pilgrim Station from Boston Edison Co to Entergy Nuclear Generation Co ML20196J5801998-12-0707 December 1998 Notification of 981209 Meeting with Representatives of Beco & Entergy in Rockville,Md to Discuss Sale of Pilgrim Plant ML20196F3461998-12-0202 December 1998 Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 ML20196F5611998-12-0202 December 1998 Forwards Info Re OL Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids A070 ML20154D5091998-10-0202 October 1998 Notification of Meeting W/Beco on 981008 in Rockville,Md to Discuss Core Spray Piping Integrity ML20154G5141998-10-0202 October 1998 Notification of 981008 Meeting W/Beco in Rockville,Md to Discuss Core Spray Piping Integrity.Meeting Has Been Rescheduled to 981015 ML20247G2441998-04-15015 April 1998 Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191) ML20203E2781998-02-19019 February 1998 Notification of Significant Licensee Meeting 98-18 W/Util in King of Prussia,Pa on 980310 Re Plant Design Basis Project Discussion ML20199C7581997-10-31031 October 1997 Notification of Significant Licensee Meeting 97-112 W/Util on 971113 to Discuss NRC SALP ML20212D6201997-10-28028 October 1997 Notification of Licensee Meeting on 971121 W/Util in King of Prussia,Pa to Discuss Apparent Violations Identified During NRC Insp 50-293/97-05 ML20140F6151997-06-11011 June 1997 Notification of 970612 Meeting W/Util in Rockville,Md to Discuss Net Positive Suction Head for ECCS Pumps ML20137Q9761997-03-31031 March 1997 Informs That as-found LOCA & Life Testing & Analysis Does Not Provide Acceptable Approach for Demonstrating Qualification at Accident Temp Higher than 340F,per 970110 TAR ML20137B4781997-03-14014 March 1997 Undated Memo Discussing Beco Reorganization ML20141A7361997-03-12012 March 1997 Rcommends That Key RES Staff Attend Subcommittee Meetings to Address Any Questions,Arise in Discussions Among Members & to Answer Any Key Questions Posed in Advance by Subcommittee Chairmen ML20149M3291996-11-12012 November 1996 Forwards Input Re TIA on Plant Licensing Basis & Subsequent Mod Under 10CFR50.59 for Two Safety Significant Problems ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129D8331996-09-19019 September 1996 Notification of 961003 Predecisional Enforcement Conference 96-98 W/Util to Discuss Containment Penetration Protection. Meeting Closed to Public ML20134J7301996-07-26026 July 1996 Forwards Resolution of Spent Fuel Storage Pool Action Plan Issues Re Response to Two Postulated Event Sequences Involving SFP NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl IR 05000293/19930291993-11-23023 November 1993 Notification of Significant Licensee Meeting 93-156 W/Util on 931202 Re Three Recently Reported Design Issues in Insp Rept 50-293/93-29 ML20058C9711993-11-22022 November 1993 Notification of Significant Licensee Meeting 93-150 W/Util on 931217 Re Hpci/Rcic Reliability & Switchyard Betterment Status ML20059L9721993-11-12012 November 1993 Licensing Board Memorandum & Order Terminating Proceeding .* Informs That Time Provided by NRC Regulation to Review Decision of ASLB Terminating Proceeding in Docket Has Expired.W/Certificate of Svc.Served on 931112 ML20056C4721993-06-17017 June 1993 Discusses Util Assessment of Low Pressure Turbine Analysis. Licensee Retained Structural Integrity Assocs,Inc (SIA) to Evaluate Flaw Indications in 7GA Disk.Sia Anaylsis Reduce Some Obvious Conservatisms Used in GE Analysis ML20128F3911993-02-0303 February 1993 Requests Listed Instructions to Ensure That P Blanch of Northeast Utils & E Hadley of We the People Kept Promptly Informed of NRC Activities on BWR Water Level Indicators & Rosemount Transmitters ML20128E2181993-01-26026 January 1993 Notice of Significant Licensee Meeting 93-11 W/Licensee on 930225 in King of Prussia,Pa to Discuss Util Reorganization ML20059C1171992-11-20020 November 1992 Submits Status Rept on Reactor Water Level Spiking That Occurred on 921024.Related Info Encl ML20125D1161992-10-0707 October 1992 Notification of Significant Licensee Meeting 92-177 W/Util on 921217 to Discuss tie-in of New Security Computer ML20082B1581991-02-20020 February 1991 Summarizes Telcon W/R Murphy Re Mobilization Time for State of Ma Natl Guard Personnel Assigned to Respond to Wellesley, Ma Reception Ctr & State of Ma Civil Defense Agency Area II Headquarters in Event of Emergency at Facility ML20062H5361990-11-23023 November 1990 Forwards Info from Pilgrim Citizens Radiological Monitoring Network,Covering Rept Periods 900910-1017 ML20059P0861990-10-0101 October 1990 Notification of Significant Licensee Meeting 90-118 W/Util on 901016 to Discuss SALP ML20059L1541990-09-0707 September 1990 Notification of Significant Licensee Meeting 90-114 on 900912 at Region I Ofc to Discuss Corrective Actions & Restart Planning Re 900902 Manual Reactor Scram ML20059G4681990-08-0606 August 1990 Forwards Citizens Radiological Monitoring Network Weather Data Rept for Apr-Jul 1990 for Processing Through Nudocs Sys ML20127B4901990-08-0303 August 1990 Responds to 900726 Request for Recommendations for Appropriate Actions in Response to Inspector General Rept 90N-02 ML20127B4961990-08-0101 August 1990 Advises That Staff Did Not Conduct Thorough Review of Offsite Emergency Preparedness Which Resulted in Inaccurate Info Being Provided to Commission ML20058B4501990-06-28028 June 1990 Provides Status Rept Re Progress of off-site Emergency Preparedness Activities at Facility ML20055C2661990-02-0505 February 1990 Forwards Draft Ltr to Util Re Completion of Plant Power Ascension Program.Ltr Will Be Issued on 900209 Which Will Accept Util Completion of Power Ascension Program & Close Out Confirmatory Action Ltr CAL-86-10 ML20248C5841989-09-26026 September 1989 Notification of Significant Licensee Meeting 89-154 W/Util on 891006 in Plymouth,Ma to Discuss SALP Mgt ML20247N0121989-09-12012 September 1989 Forwards Plant Status Rept for 890826-0908.On 890830,reactor Automatically Scrammed Due to Fault on Main Generator Voltage Regulation Circuitry.On 890905,inadvertent Actuation LPCI Loop Select Logic Experienced ML20246N5751989-08-30030 August 1989 Forwards Plant Biweekly Status Rept for 890812-25 ML20245F6401989-08-0101 August 1989 Forwards Facility Biweekly Status Rept for 890715-28.NRC Restart Staff in Place & Onsite Monitoring Licensee Activities on Extended day-shift Basis During Reporting Period ML20247C0631989-07-19019 July 1989 Forwards Biweekly Status Rept for 890701-14.NRC Restart Staff in Place & Onsite & Monitoring Licensee Activities on around-the-clock Basis During Plant Startup & Power Ascension.Part 21 Related ML20247C1611989-07-14014 July 1989 Notification of Significant Licensee Meeting 89-112 W/Util on 890816 in King of Prussia,Pa to Discuss SALP ML20247E4531989-07-10010 July 1989 Forwards Plant Status Rept for 890617-30 Period.Rept Intended to Provide NRC Mgt & Public W/Overview of Plant Activities & NRC Restart Insp Activities ML20246K1141989-07-0303 July 1989 Notification of Significant Licensee Meeting 89-105/suppl Enforcement Conference Re Augmented Insp Team Findings Concerning 890412 Reactor Core Isolation Cooling Sys Overpressurization ML20245E6561989-06-22022 June 1989 Forwards Plant Biweekly Status Rept for 890603-16.On 890616, Reactor Operating at Approx 25% Power w/turbine-generator Synchronized to Grid.On 890612,util Commenced Controlled Reactor Shutdown to Perform Minor Mods,Maint & Testing ML20245F9581989-06-16016 June 1989 Notification of Significant Licensee Meeting 89-096 W/Util on 890619 in King of Prussia,Pa Re 890412 RCIC Sys ML20245A3311989-06-0909 June 1989 Notification of Significant Licensee Meeting 89-90 on 890627 W/Util in King of Prussia,Pa for Mgt Meeting to Discuss Status of Licensee Radiation Control Program ML20244E5081989-06-0707 June 1989 Forwards Biweekly Status Rept for 890520-0602.Rept Provides Overview of Plant Activities & NRC Restart Insp Activities. Part 21 Related 1999-08-18
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211A4361999-08-18018 August 1999 Notification of Significant Licensee Meeting 99-47 with Entergy Nuclear,Inc on 990831 to Discuss Results of NRC Plant Performance Review of Pilgrim Nuclear Power Station Issued on 990409 ML20212H7621999-06-22022 June 1999 Notification of 990701 Meeting with NEI & Entergy in Rockville,Md to Discuss Price-Anderson Issues Re Transfer of Pilgrim License from Beco to Entergy ML20205L0301999-04-0909 April 1999 Notification of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generation Co in Rockville,Md to Discuss Sale & Transfer of Pilgrim Station from Boston Edison Co to Entergy Nuclear Generation Co ML20196J5801998-12-0707 December 1998 Notification of 981209 Meeting with Representatives of Beco & Entergy in Rockville,Md to Discuss Sale of Pilgrim Plant ML20196F3461998-12-0202 December 1998 Forwards Info Re Operator Licensing Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids Code IE42 ML20196F5611998-12-0202 December 1998 Forwards Info Re OL Exam Administered on 981016-23 at Pilgrim Station,For Distribution Under Rids A070 ML20154G5141998-10-0202 October 1998 Notification of 981008 Meeting W/Beco in Rockville,Md to Discuss Core Spray Piping Integrity.Meeting Has Been Rescheduled to 981015 ML20154D5091998-10-0202 October 1998 Notification of Meeting W/Beco on 981008 in Rockville,Md to Discuss Core Spray Piping Integrity ML20247G2441998-04-15015 April 1998 Notification of Significant Licensee Meeting 98-34 W/Util on 980427 to Discuss Weaknesses in Licensee Alarm Assessment Program (EA 98-191) ML20203E2781998-02-19019 February 1998 Notification of Significant Licensee Meeting 98-18 W/Util in King of Prussia,Pa on 980310 Re Plant Design Basis Project Discussion ML20199C7581997-10-31031 October 1997 Notification of Significant Licensee Meeting 97-112 W/Util on 971113 to Discuss NRC SALP ML20212D6201997-10-28028 October 1997 Notification of Licensee Meeting on 971121 W/Util in King of Prussia,Pa to Discuss Apparent Violations Identified During NRC Insp 50-293/97-05 ML20140F6151997-06-11011 June 1997 Notification of 970612 Meeting W/Util in Rockville,Md to Discuss Net Positive Suction Head for ECCS Pumps ML20137Q9761997-03-31031 March 1997 Informs That as-found LOCA & Life Testing & Analysis Does Not Provide Acceptable Approach for Demonstrating Qualification at Accident Temp Higher than 340F,per 970110 TAR ML20137B4781997-03-14014 March 1997 Undated Memo Discussing Beco Reorganization ML20141A7361997-03-12012 March 1997 Rcommends That Key RES Staff Attend Subcommittee Meetings to Address Any Questions,Arise in Discussions Among Members & to Answer Any Key Questions Posed in Advance by Subcommittee Chairmen ML20149M3291996-11-12012 November 1996 Forwards Input Re TIA on Plant Licensing Basis & Subsequent Mod Under 10CFR50.59 for Two Safety Significant Problems ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129D8331996-09-19019 September 1996 Notification of 961003 Predecisional Enforcement Conference 96-98 W/Util to Discuss Containment Penetration Protection. Meeting Closed to Public ML20134J7301996-07-26026 July 1996 Forwards Resolution of Spent Fuel Storage Pool Action Plan Issues Re Response to Two Postulated Event Sequences Involving SFP NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl IR 05000293/19930291993-11-23023 November 1993 Notification of Significant Licensee Meeting 93-156 W/Util on 931202 Re Three Recently Reported Design Issues in Insp Rept 50-293/93-29 ML20058C9711993-11-22022 November 1993 Notification of Significant Licensee Meeting 93-150 W/Util on 931217 Re Hpci/Rcic Reliability & Switchyard Betterment Status ML20059L9721993-11-12012 November 1993 Licensing Board Memorandum & Order Terminating Proceeding .* Informs That Time Provided by NRC Regulation to Review Decision of ASLB Terminating Proceeding in Docket Has Expired.W/Certificate of Svc.Served on 931112 ML20056C4721993-06-17017 June 1993 Discusses Util Assessment of Low Pressure Turbine Analysis. Licensee Retained Structural Integrity Assocs,Inc (SIA) to Evaluate Flaw Indications in 7GA Disk.Sia Anaylsis Reduce Some Obvious Conservatisms Used in GE Analysis ML20128F3911993-02-0303 February 1993 Requests Listed Instructions to Ensure That P Blanch of Northeast Utils & E Hadley of We the People Kept Promptly Informed of NRC Activities on BWR Water Level Indicators & Rosemount Transmitters ML20128E2181993-01-26026 January 1993 Notice of Significant Licensee Meeting 93-11 W/Licensee on 930225 in King of Prussia,Pa to Discuss Util Reorganization ML20059C1171992-11-20020 November 1992 Submits Status Rept on Reactor Water Level Spiking That Occurred on 921024.Related Info Encl ML20125D1161992-10-0707 October 1992 Notification of Significant Licensee Meeting 92-177 W/Util on 921217 to Discuss tie-in of New Security Computer ML20082B1581991-02-20020 February 1991 Summarizes Telcon W/R Murphy Re Mobilization Time for State of Ma Natl Guard Personnel Assigned to Respond to Wellesley, Ma Reception Ctr & State of Ma Civil Defense Agency Area II Headquarters in Event of Emergency at Facility ML20062H5361990-11-23023 November 1990 Forwards Info from Pilgrim Citizens Radiological Monitoring Network,Covering Rept Periods 900910-1017 ML20059P0861990-10-0101 October 1990 Notification of Significant Licensee Meeting 90-118 W/Util on 901016 to Discuss SALP ML20059L1541990-09-0707 September 1990 Notification of Significant Licensee Meeting 90-114 on 900912 at Region I Ofc to Discuss Corrective Actions & Restart Planning Re 900902 Manual Reactor Scram ML20059G4681990-08-0606 August 1990 Forwards Citizens Radiological Monitoring Network Weather Data Rept for Apr-Jul 1990 for Processing Through Nudocs Sys ML20127B4901990-08-0303 August 1990 Responds to 900726 Request for Recommendations for Appropriate Actions in Response to Inspector General Rept 90N-02 ML20127B4961990-08-0101 August 1990 Advises That Staff Did Not Conduct Thorough Review of Offsite Emergency Preparedness Which Resulted in Inaccurate Info Being Provided to Commission ML20058B4501990-06-28028 June 1990 Provides Status Rept Re Progress of off-site Emergency Preparedness Activities at Facility ML20055C2661990-02-0505 February 1990 Forwards Draft Ltr to Util Re Completion of Plant Power Ascension Program.Ltr Will Be Issued on 900209 Which Will Accept Util Completion of Power Ascension Program & Close Out Confirmatory Action Ltr CAL-86-10 ML20248C5841989-09-26026 September 1989 Notification of Significant Licensee Meeting 89-154 W/Util on 891006 in Plymouth,Ma to Discuss SALP Mgt ML20247N0121989-09-12012 September 1989 Forwards Plant Status Rept for 890826-0908.On 890830,reactor Automatically Scrammed Due to Fault on Main Generator Voltage Regulation Circuitry.On 890905,inadvertent Actuation LPCI Loop Select Logic Experienced ML20246N5751989-08-30030 August 1989 Forwards Plant Biweekly Status Rept for 890812-25 ML20245F6401989-08-0101 August 1989 Forwards Facility Biweekly Status Rept for 890715-28.NRC Restart Staff in Place & Onsite Monitoring Licensee Activities on Extended day-shift Basis During Reporting Period ML20247C0631989-07-19019 July 1989 Forwards Biweekly Status Rept for 890701-14.NRC Restart Staff in Place & Onsite & Monitoring Licensee Activities on around-the-clock Basis During Plant Startup & Power Ascension.Part 21 Related ML20247C1611989-07-14014 July 1989 Notification of Significant Licensee Meeting 89-112 W/Util on 890816 in King of Prussia,Pa to Discuss SALP ML20247E4531989-07-10010 July 1989 Forwards Plant Status Rept for 890617-30 Period.Rept Intended to Provide NRC Mgt & Public W/Overview of Plant Activities & NRC Restart Insp Activities ML20246K1141989-07-0303 July 1989 Notification of Significant Licensee Meeting 89-105/suppl Enforcement Conference Re Augmented Insp Team Findings Concerning 890412 Reactor Core Isolation Cooling Sys Overpressurization ML20245E6561989-06-22022 June 1989 Forwards Plant Biweekly Status Rept for 890603-16.On 890616, Reactor Operating at Approx 25% Power w/turbine-generator Synchronized to Grid.On 890612,util Commenced Controlled Reactor Shutdown to Perform Minor Mods,Maint & Testing ML20245F9581989-06-16016 June 1989 Notification of Significant Licensee Meeting 89-096 W/Util on 890619 in King of Prussia,Pa Re 890412 RCIC Sys ML20245A3311989-06-0909 June 1989 Notification of Significant Licensee Meeting 89-90 on 890627 W/Util in King of Prussia,Pa for Mgt Meeting to Discuss Status of Licensee Radiation Control Program ML20244E5081989-06-0707 June 1989 Forwards Biweekly Status Rept for 890520-0602.Rept Provides Overview of Plant Activities & NRC Restart Insp Activities. Part 21 Related 1999-08-18
[Table view] |
Text
- ,' , ,
, ' 3 7.
- . w' ,
.k, .J-
~ '
=
^ FEB 2 N989: ,
am
_v .
)
O '
Docket No~. 50-293
, MEMORANDUM. FOR: James T. Wiggins, Chief L Reactor Projects Branch No..3.
Division of: Reactor Projects-s .FROM: A.-Randy Blough, Chief Reactor Projects Section No. 3B Division-of Reactor Projects SUBJECT': .' PILGRIM ' STATUS' REPORT FOR' THE PERIOD JA'NUARY. 29-FEBRUAR 10, .1989 -
Enclosed is. tSe' Pilgrim bi-weekly status report from the- NRC Resident Office.
atc Pilgrim. - The' NRC : Restart Staff is:. in place andLwas on-siteJ monitoring?
licensee activities on: an- extended shift basis while the . plant was shutdown -
during . this report--period. The' restart staff resumed monitoring licensee activities on an around-the-clock basis con February 8,1989, prior to ' plant startup.
The. Pilgrim bi-weekly status. report .is intended to: provide , NRC.' management and the public with an overview of splant activities and NRC- restart! inspection s _ activities. ' Subsequent inspectionlreports. will address many of these topics in more detail.
Original Signed by A. Randy Blough A. Randy Blough, Chie'f-
. Reactor Projects Section No. 38 .
Enclosure:
As stated-OFFICIAL' RECORD COPY PILGRIM STATUS 1/29-2/10/89 - 0001.0.0 g \.
02/18/89 8903060046 890221 d .75 1 PDR ADOCK 05000293 .'
m=___:JR____ 1_ _ PDC _
s
- , 3, . 35
.FEB 211989 ps Memorandum for. James T.. Wiggins 2
- l. .
lu 1
fcc:w/ enc 1:.. .
R. Bird,~, Senior'Vice President - Nuclear-LL. Gustin, Vice President - Corporate Relations
~0 K..Highfill, Station Director
'R. Anderson, Plant Manager
- F:' J. ' Keyes, Licensing Division Manager >
i E. Robinson,' Nuclear Information Manager: ,
.R._Swanson, Nuclear Engineering Department Manager-The Honorable Edward M. Kennedy TThe Honorable Edward J. Markey.
The' Honorable' Edward ~P. Kirby.-
'The Honorable Peter V. Forman Chairman, Board.of Selectmen,-Plymouth Chairman,-Boa'rd of Selectmen, Carver Chairman,: Board ofLSelectmen, Duxbury
- Chairman, Board of Selectmen, Marshfield
. Chairman, Board of. Selectmen,-Kingston Chairman, Board of Selectmen, Bridgewater
-Mayor, City of Taunton Plymouth Civil Defense Director.~ .
P. Agnes', Assistant Secretary of Public Safety, Commonwealth of Massachusetts 1 M. Ernst, Committee on Energy, Commonwealth of Massachusetts S.: Pollard,' Massachusetts Secretary of Energy Resources B.-McIntyre, Chairman,5 Department of Public Utilities
.N. Johnson', Chairman, Duxbury Nuclear Committee R. Shimshak', MASSPIRG
'R. Boulay-M. Conyngham M. .'Jeka' K. Anderson Public Document Room (PDR)
Local'Public Document Room (LPDR) .
Nuclear Safety Information Center (NSIC) .
NRC_ Resident Inspector Commonwealth of Massachusetts (2) 0FFICIAL RECORD COPY PILGRIM STATUS 1/29-2/10/89 - 0002.0.0 02/18/89
. . t Memorandum for James T. Wiggins 3 gg bec w/ encl:
Region I Docket Room (with concurrences)
J. Taylor, ED0 B. Clayton, EDO T. Murley,. NRR F. Miraglia, NRR S. Varga, NRR B. Boger, NRR D. Crutchfield, NRR J. Partlow, NRR
'C. Rossi, NRR F. Congel, NRR
.L. Shao, NRR R. Wessman, NRR D. Mcdonald, NRR E. Trottier, NRR
~J. Roe, NRR F. Akstulewicz, NRR L. Whitney, NRR P. Boehnert,'ACRS W. Russell, RI W. Kane, RI T. Martin, RI S. Ebneter, RI-S. Collins, RI R. Gallo, RI J. Durr, RI R. Bellamy, RI R. Blough, RI J. Johnson, RI E..McCabe, RI N. Blumberg, RI J. Lyash, RI M. Kohl, RI S. Juergens, RI M. J. DiDonato, RI (2)
M. Miller, RI K. Abraham, RI (2)
G. Lainas, NRR RP I:DRP RI:DRP -
CWarren/mjd RBlough JWiggins 2/2//89 2/11/89 2/).l/89 0FFICIAL RECORD COPY PILGRIM STATUS 1/29-2/10/89 - 0003.0.0 02/18/89 L____________--_ _ _ _ _ _
x ..
^
[ 3 V w-ENCLOSURE
- Pilgrim Status Report for the Period January 29 - February 10, 1989:
y 1.0 Plant' Status
' As of 10:00 a.m. on January 28,1959, the reastor was critical with the .
mode switch in startup with moderator' temperature about 180 degrees Fahrenheit.
2.0 Power-' Ascension Test Program Status 4
The ' licensee completed startup physics testing and testing of equipment up to a reactor pressure of 150 pounds per. square inch gage (psig) during-a ' previous report period. However, as previously reported, a problem involving a safety-related system has delayed the licensee's Power Ascen-sion Test . Program. The' plant remained in cold' shutdown . 'until February 10, 1989, while the licensee performed modifications and repairs to the vacuum breaker block valve ' air system. Further details are pro-vided below in Section 3.0.
Activities scheduled' for the next two weeks include raising reactor pressure through. various: plateaus to normal operating: pressure, testing .
of. reactor safety relief valves from the control . room, leak inspections of the drywell and the residual heat removal . system (RHR). This . will..
complete the licensee's test program at the 0 '- 5% power plateau. As specified in the licensee's 'NRC-accepted Power ' Ascension Program,. the licensee must obtain the NRC Region I Regional Administrator's agreement to proceed beyond the 5% NRC hold point to the. 25% power plateau. The program- includes NRC Regional Administrator hold points at 5%,. 25%, 50%
and 75% .of. full power, as well as beth a licensee written report and NRC review after completion of testing at full power. The NRC Restart Assessment Panel . recommends to the Regional Administrator when the plant is ready to be released from each hold point.
3.0 Facility Operations Summary As reported in the last Pilgrim Status Report (January 14-28,1989),after plant startup on January 27, 1989, subsequent reviews of the routine air supply surveillance data for the torus vacuum breaker block valve accumulators indicated increased leakage. This increased leakage was greater than the allowable leakage limit set in the licensee's own established specifications. Due to this noted increased leakage, the licensee declared the vacuum breaker block valves inoperable and commenced a reactor shutdown at 9:55 p.m. on January 27, 1989.
OFFICIAL RECORD COPY PILGRIM STATUS 1/29-2/10/89 - 0004.0.0 02/18/89
_- _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ - _ _ _ - _ _ _ - = _ _ _ _ _ - _ - _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - - - _ _ - _ -
l
~
2: ,
,}
Enclosure , 2:
)
h 4
- The'. licensee completed modifications to' the air: supply and accumulators -
y for the vacuum breaker" block valves and c commenced plant lstartup 'at 7:50~a.m.' on' February 10,1989t the plant was- critical: at 9:25 a.m. i
' The' licensee- determined the' air leakage on January 27,~ 1989, was due-to the relief valves on'the two accumulators lifting. at. varying pressures and not tightly reseating. _The relief valves protect the valve actuators from
+ overpressurization. The licensee installed. spare-relief. valves to_ correct this; problem. Detailed NRC review of licensee actions will .be documented ~
in Inspection. Report 50-293/88-37.
Throughout the' period, ' the licensee continued- to conduct routine . surveil-lances _along with preventive and corrective maintenance.
,, 4.0 Pilgrim Restart' Staff Activities
- The1 Pilgrim Restart staff was maintained.on around-the-clock shift cover-age until January 31',1989. This coverage was reduced to two shift cover-age (16 hour1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> _ coverage) on January 31, 1989, consistent with reduced test-ing activity and the plant' shutdown. At 10:30 p.m. on February 8, :1989, around-the-clock shift coverage resumed in anticipation of plant start'up.
-This aro'und-the-clock shif t coverage was in effect at the close of this report period. The' shifts were staffed by personnel from- NRC Region _I, NRC Headquarters and an NRC contractor. - Additional Region -I personnel were onsite during portions of the period to augment ~ the resident':inspec--
tion staff.
A staff-developed inspection plan has been issued for' this period and - - -
covered _ the primary functional areas of operation, maintenance, _ surveil-
- lance .and startup testing. . The _ shift inspectors' assessed operator per-T formance, organizational interfaces, adherence to procedures and technical
' specification compliance. 'In addition, the residents .and region-based inspectors extensively followed the licensee's analyses, repairs, modifi- _
. cations and post-work testing on the air supply system to the = vacuum breaker block valves.
The Pilgrim Restart Staff continued to evaluate the performance of licen-see personnel. and the plant to determine whether the licensee should be permitted to proceed beyond the next NRC hold point which would allow the licensee to exceed 5% rated power up to maximum of 25% rated power.
Contact with the press and public continued throughout the period. The
, N94 Restart Manager has been handling inquiries from the press and the public with the assistance of the Region I Public Affairs Officer.
0FFICIAL RECORD COPY PILGRIM STATUS 1/29-2/10/89 - 0005.0.0 02/18/89
'i l-
__.m_ _____.__.__.E.__._m _ _ _ _ . _ _ _ _ _ _ _ _ _ _ .m___ _ . _ _ . _ _ - _ _ . . _ _ _ _ . _
l .
(..
Enclosure 3 l
Pilgrim Restart Staff Composition During Period The Pilgrim Restart Staff on-site was comprised of the following personnel during the period.
C. Warren, Senior Resident Inspector,and Restart Manager T. Kim, Resident Inspector C. Carpenter, Resident Inspector E. Trottier, Shift Inspector D. Mcdonald, Shift Inspector R. Barkley, Shift Inspector S. Barber, Shift Inspector G. Bethke, Shift Inspector F. McManus, Shift Inspector T. Rebelowski, Shift Inspector D. Carpenter, Shift Inspector J. Lyash, Project Engineer M. Kohl, Reactor Engineer S. Juergens, Reactor Engineer P. Drysdale, Reactor Engineer 0FFICIAL RECORD COPY PILGRIM STATUS 1/29-2/10/89 - 0006.0.0 02/18/89
-__ - ____