ML20247B039
ML20247B039 | |
Person / Time | |
---|---|
Site: | Farley |
Issue date: | 07/06/1989 |
From: | Mcdow J Atomic Safety and Licensing Board Panel |
To: | Julian E NRC OFFICE OF THE SECRETARY (SECY) |
References | |
CON-#389-8887 CIVP, NUDOCS 8907240024 | |
Download: ML20247B039 (1) | |
Similar Documents at Farley | |
---|---|
Category:ASLP TO NRC
MONTHYEARML20247B0391989-07-0606 July 1989
[Table view]Requests That Svc List for Plant Proceeding Be Changed to Reflect Judge Jordan Stated Address 1989-07-06 Category:CORRESPONDENCE-LETTERS MONTHYEARL-99-035, Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld1999-10-18018 October 1999
[Table view]Forwards non-proprietary & Proprietary Versions of Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs, Used to Support SG Replacement Project.Proprietary Encl Withheld ML20217G0801999-10-0707 October 1999 Informs That on 990930,staff Conducted mid-cycle PPR of Farley & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Will Conduct Regional Insps Associated with SG Removal & Installation ML20217P0661999-10-0606 October 1999 Requests Withholding of Proprietary Rept NSD-SAE-ESI-99-389, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217B1891999-10-0404 October 1999 Submits Clarification Re Development of Basis for Determining Limiting Internal Pressure Loads Re Review of NRC SE for Cycle 16 Extension Request.Util Intends to Use Guidelines When Evaluating SG Tube Structural Integrity ML20212J8391999-09-30030 September 1999 Forwards RAI Re Request for Amends to Ts.Addl Info Needed to Complete Review to Verify That Proposed TS Are Consistent with & Validate Design Basis Analysis.Request Discussed with H Mahan on 990930.Info Needed within 10 Days of This Ltr ML20212J8801999-09-30030 September 1999 Discusses GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps. Util 980731,990607 & 03 Ltrs Provided Requested Info in Subj Gl.Nrc Considers Subj GL to Be Closed for Unit 1 L-99-032, Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 21999-09-23023 September 1999 Responds to NRC Re Adequacy of Kaowool Fire Retardant Fire Barriers in Use at Jfnp,Units 1 & 2 L-99-034, Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 21999-09-23023 September 1999 Forwards Comments on Draft Current Tech Specs Discussion of Change Tables for Jm Farley Nuclear Plant.Units 1 & 2 ML20212F8861999-09-23023 September 1999 Forwards Revised Relief Request Number 32 for NRC Approval. Approval Requested by 991231 to Support Activities to Be Performed During Unit 1 Refueling Outage Scheduled for Spring of 2000 ML20212E7031999-09-23023 September 1999 Responds to GL 98-01, Year 2000 Readiness of Computer Sys at Npps. Util Requested to Submit Plans & Schedules for Resolving Y2K-related Issues ML20212F1111999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals ML20212C2351999-09-16016 September 1999 Submits Corrected Info Concerning Snoc Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20212D0101999-09-15015 September 1999 Informs That Submittal of clean-typed Copy of ITS & ITS Bases Will Be Delayed.Delay Due to Need for Resolution of Two Issues Raised by NRC staff.Clean-typed Copy of ITS Will Be Submitted within 4 Wks Following Resolution of Issues ML20212C4641999-09-13013 September 1999 Forwards Info Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams L-99-031, Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed1999-09-13013 September 1999 Informs NRC That Review of MOV Testing Frequency & Changes Made to Frequency of MOV Testing Has Been Completed ML20212C8041999-09-10010 September 1999 Responds to to D Rathbun Requesting Review of J Sherman Re Y2K Compliance.Latest NRC Status Rept on Y2K Activities Encl ML20212D4581999-09-10010 September 1999 Responds to to D Rathbun,Requesting Review of J Sherman Expressing Concerns That Plant & Other Nuclear Plants Not Yet Y2K Compliant ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N8041999-09-0808 September 1999 Informs That on 990930 NRC Issued GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Condition, to Holders of Nuclear Plant Operating Licenses ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20212C0071999-09-0202 September 1999 Forwards Insp Repts 50-348/99-05 & 50-364/99-05 on 990627- 0807.No Violations Noted.Licensee Conduct of Activities at Farley Plant Facilities Generally Characterized by safety-conscious Operations & Sound Engineering ML20211Q4801999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Copy of Slide Presentations & List of Questions Received from Participants Encl ML20211K2131999-08-31031 August 1999 Informs That Snoc Has Conducted Review of Reactor Vessel Integrity Database,Version 2 (RVID2) & Conclude That Latest Data Submitted for Farley Units Has Not Been Incorporated Into RVID2 ML20211K4101999-08-31031 August 1999 Resubmits Relief Requests Q1P16-RR-V-5 & Q2P16-RR-V-5 That Seek to Group V661 Valves from Each Unit Into Sample Disassembly & Insp Group,Per 990525 Telcon with NRC L-99-030, Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS1999-08-30030 August 1999 Forwards SNC Review Comments on Draft SE & marked-up Copy of Draft SE Incorporating SNC Comments Re Proposed Conversion to ITS ML20211G6851999-08-26026 August 1999 Informs That During Insp,Technical Issues Associated with Design,Installation & fire-resistive Performance of Kaowool Raceway fire-barriers Installed at Farley Nuclear Plant Were Identified L-99-029, Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 07271999-08-19019 August 1999 Forwards Revised Response to Chapter 3.1 RAI Requested in 990726 Conference Call,Rai Response Related to Beyond Scope Issue for Chapter 3.5 Requested by Conference Call on 990805 & RAI Response to Chapter 3.8 Requested on 990615 & 0727 ML20211B9431999-08-17017 August 1999 Forwards Fitness for Duty Performance Data for six-month Reporting Period 990101-990630,IAW 10CFR26.71(d).Rept Covers Employees at Jm Farley Nuclear Plant & Southern Nuclear Corporate Headquarters ML20211B9211999-08-17017 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-348/99-09 & 50-364/99-09.Corrective Actions:Security Response Plan Was Revised to Address Vulnerabilities Identified During NRC Insp ML20210R5101999-08-12012 August 1999 Forwards Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16 Only,Based on risk- Informed Approach for Evaluation of SG Tube Structural Integrity,As Result of Staff Comments ML20212C8141999-08-0909 August 1999 Forwards Correspondence Received from Jm Sherman.Requests Review of Info Re Established Policies & Procedures ML20210T2021999-08-0606 August 1999 Forwards Draft SE Accepting Licensee Proposed Conversion of Plant,Units 1 & 2 Current TSs to Its.Its Based on Listed Documents ML20210Q4641999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr to La Reyes,As Listed,With List of Individuals to Take exam,30 Days Before Exam Date ML20210J8341999-07-30030 July 1999 Forwards Second Request for Addl Info Re Util 990430 Amend Request to Allow Util to Operate Unit 1,for Cycle 16 Based on risk-informed Probability of SG Tube Rupture & Nominal accident-induced primary-to-second Leakage ML20210G4901999-07-30030 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, Issued 990603.Ltr Contains NRC License Commitment to Utilize ASTM D3803-1989 with Efficiency Acceptance Criteria Utilizing Safety Factor of 2 L-99-028, Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines1999-07-30030 July 1999 Responds to NRC 990730 RAI Re 990423 OL Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described by NEI 97-06, SG Program Guidelines L-99-027, Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.51999-07-27027 July 1999 Addresses Clarifications to Selected Responses to Chapter 3.8 RAI Requested in NRC Conference Call on 990624, Resolution of Open Issue Related to Containment Purge in Chapter 3.6 & Response Related to Chapter 3.5 ML20210G8181999-07-26026 July 1999 Forwards Insp Repts 50-348/99-04 & 50-364/99-04 on 990516- 0626.One Violation Identified & Being Treated as Noncited Violation IR 05000348/19990091999-07-23023 July 1999 Discusses Insp Repts 50-348/99-09 & 50-364/99-09 on 990308- 10 & Forwards Notice of Violation Re Failure to Intercept Adversary During Drills,Contrary to 10CFR73 & Physical Security Plan Requirements ML20210E4071999-07-22022 July 1999 Responds to NRC 990702 RAI Re Change Request to Allow for Risk Informed Approach for Evaluation of SG Tube Structural Integrity as Described in NEI 97-06, SG Program Guidelines L-99-026, Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments1999-07-19019 July 1999 Forwards Response to NRC 990702 RAI Re SG Replacement Related TS Change Request Submitted 981201.Ltr Contains No New Commitments L-99-264, Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 20011999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20209H4721999-07-13013 July 1999 Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 ML20196J6191999-07-0202 July 1999 Forwards Final Dam Audit Rept of 981008 of Category 1 Cooling Water Storage Pond Dam.Requests Response within 120 Days of Date of Ltr 05000364/LER-1999-001, Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed1999-07-0202 July 1999 Forwards LER 99-001-00 Re Reactor Trip Due to Loss of Condenser Vacuum Steam Dump Drain Line Failure.Commitments Made by Licensee,Listed ML20196J7471999-07-0202 July 1999 Forwards RAI Re Cycle 16 Extension Request.Response Requested within 30 Days of Date of Ltr ML20196J5781999-07-0202 July 1999 Forwards RAI Re 981201 & s Requesting Amend to TS Associated with Replacing Existing Westinghouse Model 51 SG with Westinghouse Model 54F Generators.Respond within 30 Days of Ltr Date ML20196J6571999-07-0202 July 1999 Discusses Closure to TAC MA0543 & MA0544 Re GL 92-01 Rev 1, Suppl 1,RV Structural Integrity.Nrc Has Revised Rvid & Releasing It as Rvid,Version 2 as Result of Review of Responses ML20196J3591999-06-30030 June 1999 Forwards SE of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs 1999-09-09 Category:INTERNAL OR EXTERNAL MEMORANDUM MONTHYEARML20217F3351999-10-14014 October 1999
[Table view]Notification of 991103-04 Southern Nuclear Operating Licensing Workshop in Birmingham,Alabama with Goal of Improving Licensing Interface Between Licensee & NRC ML20212J3501999-06-23023 June 1999 Forwards Draft Ltr for Use in Transmitting FERC Rept Re 981008 Audit to Licensee & Copy of FERC Insp Rept ,containing Color Photographs.Without Encls ML20196H9721999-06-23023 June 1999 Requests Attached Request for Addl Info Be Put Into NRC Public Document Room.Encl RAI e-mailed to W Sparkman of Southern Nuclear Operating Co on 990610 IA-96-023, Forwards Response to TIA-96-023 Re Review of Plant,Units 1 & 2 Licensing Basis & Acceptability of Kaowool as Electrical Raceway fire-barrier1999-06-18018 June 1999 Forwards Response to TIA-96-023 Re Review of Plant,Units 1 & 2 Licensing Basis & Acceptability of Kaowool as Electrical Raceway fire-barrier ML20205N7511999-04-13013 April 1999 Requests That Attached RAI Re TS 3/4.4.7.2e Be Placed in NRC Pdr.Informs That RAI Was Faxed to W Sparkman on 990413 & Will Be Used to Facilitate Discussions During Upcoming Telcon Between NRC & Snoc Staff ML20205M8681999-04-13013 April 1999 Requests That Encl Topics for Discussion Be Made Available in NRC Pdr.Items Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & SNC Staff ML20205J1401999-04-0505 April 1999 Notification of 990419 Meeting with Util to Discuss Licensee Justification of Certain TS Changes Need to Implement Improved Standard Ts.Meeting Was Held in Rockville,Md ML20205G5781999-04-0101 April 1999 Notification of 990416 Meeting with Snoc in Rockville,Md to Discuss Farley Npp,Unit 1 SG Operational Assessment ML20205C8771999-03-31031 March 1999 Requests That Encl questions,e-mailed to W Sparkman of Southern Nuclear Operating Co,Inc,Which Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & Util Be Made Available in NRC PDR ML20207J4931999-03-0101 March 1999 Forwards NRC Operator Licensing Exam Repts 50-348/98-300 & 50-364/98-300 (Including Completed & Graded Tests) for Tests Administered on 980313 ML20207J4681999-03-0101 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980313 at Farley NPP ML20202E1621999-01-29029 January 1999 Requests That Encl RAI Be Made Available in NRC Pdr.Subj Document Neither Constitutes Formal Request for Info Nor Represent Formal NRC Position.Encl RAI Faxed on 990129 to W Sparkman of Snoc ML20198H5741998-12-22022 December 1998 Notification of 990107 Meeting with Util in Rockville,Md to Discuss Licensee Justification of Certain TS Changes Needed to Implement Improved Standard TSs ML20197J0501998-12-14014 December 1998 Requests That Encl Memo & Attachments Associated with Task Interface Agreement (TIA 96-023) Fraley License Basis & Acceptability of Kaowool as Electrical Raceway Fire Barrier Be Placed in NRC PDR ML20196H1181998-12-0404 December 1998 Forwards Message Faxed to M Ajluni of Southern Nuclear Operating Co (SNC) on 981204,to Prepare SNC for Conference Call.Message Does Not Constitute Formal Request for Info or Represent Formal NRC Staff Position ML20196E2911998-12-0101 December 1998 Notification of 981215 Meeting with Util in Rockville,Md to Discuss Matters Re Kaowool Fire Barriers Installed at Plant ML20195B7721998-11-12012 November 1998 Forwards Message That Had Been Faxed to M Ajluni on 981112. Purpose of Message Was to Prepare Licensee Personnel for Conference Call Re SG Tube Insp Results for Farley NPP Unit 1 ML20196F7001998-11-0202 November 1998 Notification of 981215 Meeting with Southern Nuclear Operating Co in Rockville,Maryland to Discuss Matters Re Current SG Tube Insps at Farley NPP Unit 1 ML20154L1171998-10-15015 October 1998 Notification of 981026 Meeting with Util in Rockville,Md to Discuss Westinghouse BE-LOCA Abbreviated Reanalysis for Plant,Units 1 & 2 New SG ML20154B0681998-09-29029 September 1998 Notification of 981008 Meeting with Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Repair of SG Tubes ML20154B0411998-09-29029 September 1998 Notification of 981014 Meeting with Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Justification of Certain TS Changes Needed to Implement Improved Std TSs ML20217B1371998-04-21021 April 1998 Forwards Three Documents Associated W/Farley Nuclear Plant, Units 1 & 2-licensing/design Basis for Tornado Missile Protection to Be Made Available in PDR ML20217H4431998-04-0101 April 1998 Forwards Message Faxed on 980401 to M Ajluni of Southern Nuclear Operating Co,Inc (Snc).Purpose of Message Was to Prepare SNC Personnel for Conference Call & Does Not Consitute Formal Request for Info ML20217B1811997-12-18018 December 1997 Discusses Design Insp of Farley Units 1 & 2,for Jan-March of 1997,identified Tornado Missile Protection Issue Re Exhaust Piping & Silencers for EDG for Both Units (Including Station Blackout DG) ML20198S9281997-10-31031 October 1997 Notification of 971120 Meeting W/Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Plans & Schedule for SG Replacement ML20217B1961997-10-15015 October 1997 Discusses Review of Farley Nuclear Plant,Units 1 & 2 Licensing & Design Basis for Protection Against Tornado Missiles at Farley in Accordance w/970402 Memo from RM Gallo ML20217D9721997-09-30030 September 1997 Notification of 971022 Meeting W/Licensee in Rockville,Md to Discuss Licensee Initiatives That Focus on Planned Licensing Actions for FNP & Corrective Measures Related to Problems Considered by Licensee Mgt to Warrant Special Attention ML20216G2151997-09-0505 September 1997 Notification of 970916 Meeting W/Snoc in Rockville,Md to Discuss Improved Standard Technical Specification Conversion Application & Schedule for Submittal ML20236N3231997-08-21021 August 1997 Forwards SER in Response to Licensee 970522 Requested Interpretation of TS 4.8.1.1.2.e for Two Shared EDGs ML20148J8131997-06-16016 June 1997 Notifies of 970701 Meeting W/Util in Rockville,Md to Discuss Util Initiatives That Focus on Planned Licensing Actions for Plant & Corrective Measures Re Problems Considered by Util Mgt ML20141B0131997-06-16016 June 1997 Notification of 970701 Meeting W/Southern Nuclear Operating Co in Rockville,Md to Discuss SNC Initiatives That Focus on Planned Licensing Action for FNP & Corrective Measures. Meeting Cancelled ML20217B2111997-04-0202 April 1997 Informs That During Insp of Farley Units 1 & 2 in Jan-March 1997,NRR Led Insp Team Identified Tornado Missile Protection Issue W/Exhaust Silencers for DG for Both Units ML20236M9961997-03-27027 March 1997 Forwards Response to Questions Re Ventilation Specs for Farley ML20137C2501997-03-20020 March 1997 Forwards Message to M Ajluni of Southern Nuclear Operating Re Preparing Licensee Personnel for Conference Call ML20236M9661997-02-12012 February 1997 Discusses from Southern Nuclear Operating Co Requesting NRC Review Interpretation of Application of TS 3/4.9.13 at Farley Nuclear Plant,Units 1 & 2 During Modes 5 or 6,or When Defueled ML20134B3421997-01-27027 January 1997 Notification of 970205 Meeting W/Listed Attendees in Rockville,Md to Discuss Util Plans & Schedule for Submitting Proposed TS Amend Request Re Use of Direct Tube Repair Method in Repair of SG ML20197J0751996-11-26026 November 1996 Requests Technical Assistance in Evaluation of Issues Identified During Routine Insp at Plant.Insp Rept Summary with Justification Encl ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20149E9221994-02-18018 February 1994 Responds to 930215 Request from J Strosnider Re Documentation of Concerns Re Plant Two Volt IPC Proposal & Resolution of Public Comments Concerning Voltage Based Repair Criteria ML20058J7101993-11-18018 November 1993 Notification of Significant Licensee Meeting W/Util on on 931123 to Discuss Plant SALP Board Assessment for Period of 930531-0925 IR 05000364/19930261993-11-10010 November 1993 Notification of Significant Licensee Meeting W/Util on 931117 in Atlanta,Ga to Discuss Violation 50-364/93-26-01 Re Personnel Error Resulting in Losses of Configuration Control During Performance of Maint & Testing Activities ML20057C3131993-09-15015 September 1993 Notification of Significant Licensee Meeting W/Util on 931013 to Discuss SALP Performance of Facility During Period 920531-0925 ML20056E4221993-08-0606 August 1993 Requests Written Inputs on Performance of Farley Facilities During Completed SALP Cycle 11 During Period 920531-930925 Using Encl Feeder Forms.Salp Board Meeting for Farley Scheduled for 931013 ML20127J5121993-01-19019 January 1993 Notification of 930202-03 Meetings W/Licensee in Columbia,Al Re Safety Audit of Storage Pond Dam & Dike by NRC & FERC ML20126B1451992-12-11011 December 1992 Notification of 921218 Meeting W/Util in Rockville,Md to Discuss Amend Request for Steam Generator Tube Alternate Plugging Criteria ML20058F4581990-11-0505 November 1990 Submits Daily Highlight.Notifies of 901107 Meeting W/Util to Discuss Technical & Regulatory Concerns Re Steam Generator Tube Collapse Under LOCA & Safe Shutdown Earthquake Loads ML20058E8271990-11-0202 November 1990 Notification of 901106 Meeting W/Licensee in Rockville,Md to Discuss Facility Steam Generators & Use of EPRI Alternative Tube Plugging Criteria.Agenda Encl ML20058E0461990-11-0202 November 1990 Notification of 901120 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Actions ML20058H8871990-11-0202 November 1990 Notification of Cancellation of 901120 Meeting W/Util to Discuss Status of Licensing Actions 1999-06-23 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20217F3351999-10-14014 October 1999
[Table view]Notification of 991103-04 Southern Nuclear Operating Licensing Workshop in Birmingham,Alabama with Goal of Improving Licensing Interface Between Licensee & NRC ML20212J3501999-06-23023 June 1999 Forwards Draft Ltr for Use in Transmitting FERC Rept Re 981008 Audit to Licensee & Copy of FERC Insp Rept ,containing Color Photographs.Without Encls ML20196H9721999-06-23023 June 1999 Requests Attached Request for Addl Info Be Put Into NRC Public Document Room.Encl RAI e-mailed to W Sparkman of Southern Nuclear Operating Co on 990610 IA-96-023, Forwards Response to TIA-96-023 Re Review of Plant,Units 1 & 2 Licensing Basis & Acceptability of Kaowool as Electrical Raceway fire-barrier1999-06-18018 June 1999 Forwards Response to TIA-96-023 Re Review of Plant,Units 1 & 2 Licensing Basis & Acceptability of Kaowool as Electrical Raceway fire-barrier ML20205N7511999-04-13013 April 1999 Requests That Attached RAI Re TS 3/4.4.7.2e Be Placed in NRC Pdr.Informs That RAI Was Faxed to W Sparkman on 990413 & Will Be Used to Facilitate Discussions During Upcoming Telcon Between NRC & Snoc Staff ML20205M8681999-04-13013 April 1999 Requests That Encl Topics for Discussion Be Made Available in NRC Pdr.Items Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & SNC Staff ML20205J1401999-04-0505 April 1999 Notification of 990419 Meeting with Util to Discuss Licensee Justification of Certain TS Changes Need to Implement Improved Standard Ts.Meeting Was Held in Rockville,Md ML20205G5781999-04-0101 April 1999 Notification of 990416 Meeting with Snoc in Rockville,Md to Discuss Farley Npp,Unit 1 SG Operational Assessment ML20205C8771999-03-31031 March 1999 Requests That Encl questions,e-mailed to W Sparkman of Southern Nuclear Operating Co,Inc,Which Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & Util Be Made Available in NRC PDR ML20207J4931999-03-0101 March 1999 Forwards NRC Operator Licensing Exam Repts 50-348/98-300 & 50-364/98-300 (Including Completed & Graded Tests) for Tests Administered on 980313 ML20207J4681999-03-0101 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980313 at Farley NPP ML20202E1621999-01-29029 January 1999 Requests That Encl RAI Be Made Available in NRC Pdr.Subj Document Neither Constitutes Formal Request for Info Nor Represent Formal NRC Position.Encl RAI Faxed on 990129 to W Sparkman of Snoc ML20198H5741998-12-22022 December 1998 Notification of 990107 Meeting with Util in Rockville,Md to Discuss Licensee Justification of Certain TS Changes Needed to Implement Improved Standard TSs ML20197J0501998-12-14014 December 1998 Requests That Encl Memo & Attachments Associated with Task Interface Agreement (TIA 96-023) Fraley License Basis & Acceptability of Kaowool as Electrical Raceway Fire Barrier Be Placed in NRC PDR ML20196H1181998-12-0404 December 1998 Forwards Message Faxed to M Ajluni of Southern Nuclear Operating Co (SNC) on 981204,to Prepare SNC for Conference Call.Message Does Not Constitute Formal Request for Info or Represent Formal NRC Staff Position ML20196E2911998-12-0101 December 1998 Notification of 981215 Meeting with Util in Rockville,Md to Discuss Matters Re Kaowool Fire Barriers Installed at Plant ML20195B7721998-11-12012 November 1998 Forwards Message That Had Been Faxed to M Ajluni on 981112. Purpose of Message Was to Prepare Licensee Personnel for Conference Call Re SG Tube Insp Results for Farley NPP Unit 1 ML20196F7001998-11-0202 November 1998 Notification of 981215 Meeting with Southern Nuclear Operating Co in Rockville,Maryland to Discuss Matters Re Current SG Tube Insps at Farley NPP Unit 1 ML20154L1171998-10-15015 October 1998 Notification of 981026 Meeting with Util in Rockville,Md to Discuss Westinghouse BE-LOCA Abbreviated Reanalysis for Plant,Units 1 & 2 New SG ML20154B0681998-09-29029 September 1998 Notification of 981008 Meeting with Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Repair of SG Tubes ML20154B0411998-09-29029 September 1998 Notification of 981014 Meeting with Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Justification of Certain TS Changes Needed to Implement Improved Std TSs ML20217B1371998-04-21021 April 1998 Forwards Three Documents Associated W/Farley Nuclear Plant, Units 1 & 2-licensing/design Basis for Tornado Missile Protection to Be Made Available in PDR ML20217H4431998-04-0101 April 1998 Forwards Message Faxed on 980401 to M Ajluni of Southern Nuclear Operating Co,Inc (Snc).Purpose of Message Was to Prepare SNC Personnel for Conference Call & Does Not Consitute Formal Request for Info ML20217B1811997-12-18018 December 1997 Discusses Design Insp of Farley Units 1 & 2,for Jan-March of 1997,identified Tornado Missile Protection Issue Re Exhaust Piping & Silencers for EDG for Both Units (Including Station Blackout DG) ML20198S9281997-10-31031 October 1997 Notification of 971120 Meeting W/Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Plans & Schedule for SG Replacement ML20217B1961997-10-15015 October 1997 Discusses Review of Farley Nuclear Plant,Units 1 & 2 Licensing & Design Basis for Protection Against Tornado Missiles at Farley in Accordance w/970402 Memo from RM Gallo ML20217D9721997-09-30030 September 1997 Notification of 971022 Meeting W/Licensee in Rockville,Md to Discuss Licensee Initiatives That Focus on Planned Licensing Actions for FNP & Corrective Measures Related to Problems Considered by Licensee Mgt to Warrant Special Attention ML20216G2151997-09-0505 September 1997 Notification of 970916 Meeting W/Snoc in Rockville,Md to Discuss Improved Standard Technical Specification Conversion Application & Schedule for Submittal ML20236N3231997-08-21021 August 1997 Forwards SER in Response to Licensee 970522 Requested Interpretation of TS 4.8.1.1.2.e for Two Shared EDGs ML20148J8131997-06-16016 June 1997 Notifies of 970701 Meeting W/Util in Rockville,Md to Discuss Util Initiatives That Focus on Planned Licensing Actions for Plant & Corrective Measures Re Problems Considered by Util Mgt ML20141B0131997-06-16016 June 1997 Notification of 970701 Meeting W/Southern Nuclear Operating Co in Rockville,Md to Discuss SNC Initiatives That Focus on Planned Licensing Action for FNP & Corrective Measures. Meeting Cancelled ML20217B2111997-04-0202 April 1997 Informs That During Insp of Farley Units 1 & 2 in Jan-March 1997,NRR Led Insp Team Identified Tornado Missile Protection Issue W/Exhaust Silencers for DG for Both Units ML20236M9961997-03-27027 March 1997 Forwards Response to Questions Re Ventilation Specs for Farley ML20137C2501997-03-20020 March 1997 Forwards Message to M Ajluni of Southern Nuclear Operating Re Preparing Licensee Personnel for Conference Call ML20236M9661997-02-12012 February 1997 Discusses from Southern Nuclear Operating Co Requesting NRC Review Interpretation of Application of TS 3/4.9.13 at Farley Nuclear Plant,Units 1 & 2 During Modes 5 or 6,or When Defueled ML20134B3421997-01-27027 January 1997 Notification of 970205 Meeting W/Listed Attendees in Rockville,Md to Discuss Util Plans & Schedule for Submitting Proposed TS Amend Request Re Use of Direct Tube Repair Method in Repair of SG ML20197J0751996-11-26026 November 1996 Requests Technical Assistance in Evaluation of Issues Identified During Routine Insp at Plant.Insp Rept Summary with Justification Encl ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20149E9221994-02-18018 February 1994 Responds to 930215 Request from J Strosnider Re Documentation of Concerns Re Plant Two Volt IPC Proposal & Resolution of Public Comments Concerning Voltage Based Repair Criteria ML20058J7101993-11-18018 November 1993 Notification of Significant Licensee Meeting W/Util on on 931123 to Discuss Plant SALP Board Assessment for Period of 930531-0925 IR 05000364/19930261993-11-10010 November 1993 Notification of Significant Licensee Meeting W/Util on 931117 in Atlanta,Ga to Discuss Violation 50-364/93-26-01 Re Personnel Error Resulting in Losses of Configuration Control During Performance of Maint & Testing Activities ML20057C3131993-09-15015 September 1993 Notification of Significant Licensee Meeting W/Util on 931013 to Discuss SALP Performance of Facility During Period 920531-0925 ML20056E4221993-08-0606 August 1993 Requests Written Inputs on Performance of Farley Facilities During Completed SALP Cycle 11 During Period 920531-930925 Using Encl Feeder Forms.Salp Board Meeting for Farley Scheduled for 931013 ML20127J5121993-01-19019 January 1993 Notification of 930202-03 Meetings W/Licensee in Columbia,Al Re Safety Audit of Storage Pond Dam & Dike by NRC & FERC ML20126B1451992-12-11011 December 1992 Notification of 921218 Meeting W/Util in Rockville,Md to Discuss Amend Request for Steam Generator Tube Alternate Plugging Criteria ML20058F4581990-11-0505 November 1990 Submits Daily Highlight.Notifies of 901107 Meeting W/Util to Discuss Technical & Regulatory Concerns Re Steam Generator Tube Collapse Under LOCA & Safe Shutdown Earthquake Loads ML20058E8271990-11-0202 November 1990 Notification of 901106 Meeting W/Licensee in Rockville,Md to Discuss Facility Steam Generators & Use of EPRI Alternative Tube Plugging Criteria.Agenda Encl ML20058E0461990-11-0202 November 1990 Notification of 901120 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Actions ML20058H8871990-11-0202 November 1990 Notification of Cancellation of 901120 Meeting W/Util to Discuss Status of Licensing Actions 1999-06-23 |
Text
_
g91 jog UN2TED STATES l
o NUCLEAR REGULATORY COMMISSION '
{ ,E WASHINGTON, D. C. 20$55 *.-i
% . .... l
'89 JJL 10 P7 :13 1 l
July 6, 1989 g:
OtJCr [ ' ' s M t. ,h MEMORANDUM FOR: Emile L. Julian, Acting Chief j Docketing & Service Branch Office of the Secretary of the Commission FROM: cretary to Judge John H ye, III Atomic Safety and Licensing Board Panel
SUBJECT:
ADDRESS CHANGE - JOSEPH M. FARLEY NUCLEAR PLANT (UNITS 1 & 2) SERVICE LIST On June 22, 1989 Judge John H Frye, III sent out a Notice establishing a prehearing conference in the Joseph M.
Farley proceeding (Docket No. 50-348-CivP and 50-364-CivP).
When the Notice was served by your office on June 23, 1939 it was sent to Judge Jordan at the Atomic Safety and Licensing Board office in Washington, D.C.
Please change your Service List for the Joseph M.
Farley Nuclear Plant for Judge Jordan's address to read as follows:
Judge Walter H. Jordan 881 West Outer Drive Oak Ridge, TN 37830 kko 00 B yso
- _ _ _ _ _ _ - _ _ - - _ _ _ - _