ML20195B772

From kanterella
Jump to navigation Jump to search
Forwards Message That Had Been Faxed to M Ajluni on 981112. Purpose of Message Was to Prepare Licensee Personnel for Conference Call Re SG Tube Insp Results for Farley NPP Unit 1
ML20195B772
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/12/1998
From: Jacob Zimmerman
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9811160271
Download: ML20195B772 (3)


Text

._

November 12, 1998 MEMORANDUM TO: Docket File FROM:

Jacob 1. Zimmerman, Project Manager Original signed by:

Project Directorate ll-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation

SUBJECT:

FARLEY NUCLEAR PLANT, UNIT 1 - PUTTING A DOCUMENT IN THE PUBLIC DOCUMENT ROOM The attached message was faxed today to Mark Ajiuni of Southern Nuclear Operating Company, Inc. (SNC). The purpose of the message is to prepare SNC personnel for a conference call. The message itself does not constitute a formal request for information or

^

represent a formal NRC staff position.

Docket No. 50-348

Attachment:

As stated.,

Distribution Docket File PUBLIC H. Berkow S. Coffin

]

9811160271 981112 PDR ADOCK 05000348 G

PDR To receive a copy of this document, indicate in the box: "C" = Copy without attachment /

"E" = Copy with attachment / enclosure "N" = No copyn OFFICE PM:P&p-)

l6 1.$PDi@ l D:PD([tVM l

NAME JZimrpelrrnan:en YBerry" HBerk3w -Gor 11/ W98 Il/lW98

/ /98

/ /98

/ /97 I

DATE

/'/ /A/98 DOCUMENT NAME: G:\\FARLEY\\SGPDR.MEM OFFICIAL RECORD COPY EM FRE EDif 3 CGPY

',n

_.,J

A uro p

i UNITED STATES j

g j

NUCLEAR REGULATORY COMMISSION I

WASHINGTON, D.C. 30666 4001 j

g 8

%,.....,o November 12, 1998 l

l MEMORANDUM TO: Docket File FROM:

Jacob 1. Zimmerman, Project Manager j-Project Directorate ll-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation

SUBJECT:

FARLEY NUCLEAR PLANT, UNIT 1 - PUTTING A DOCUMENT IN THE PUBLIC DOCUMENT ROOM i

The attached message was faxed today to Mark Ajiuni of Southem Nuclear Operating Company, Inc. (SNC). The purpose of the message is to prepare SNC personnel for a j

conference call. The message itself does not constitute a formal request for information or represent a formal NRC staff position.

I Docket No. 50-348

Attachment:

As stated l

l t

h i

l.

l

. o Steam Generator Tube inspection Results Licensees steam generator *(SG) tube eddy current (EC) inspections play a vital role in the g

management of SG tube degradation. The results are used to demonstrate adequate structural and leakage integrity of the SG tubes.

L NRC staff is interested in discussing the SNC's steam generator inspection plans and results, although you are not required to participate in this discussion. Typical areas of discussion include:

i Primary to secondary leakage prior to shutdown e

Results of secondary side hydro

)

e l-For each steam generator, a general description of areas examined; including expansion i

e criteria and type of probe used in each area For analyzed EC results, a description of bobbin indications (those not examined with RPC e

l (Rotating Pancake Coil)) and RPC/Plus Point /Cecco indications. Including the following information: location, number, degradation mode, disposition, and voltages / depths / lengths of most significant indications e Description of repair / plugging plans Discussion of previous history; "look backs" performed; consideration of similar plants' e

l experiences Discussion of new inspection findings, including loose parts indications Description of in-situ pressure test plans and results; include tube selection criteria, test e

pressure plans, test configuration l

Describe tube pull plans and preliminary results; include tube selection criteria and evaluation e

plans Assessment of tube integrity for previous operating cycle e

Assessment of tube integrity for next operating cycle e

Provide schedule for steam generator-related activities during remainder of current outage e

t 7

-