Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217F3351999-10-14014 October 1999 Notification of 991103-04 Southern Nuclear Operating Licensing Workshop in Birmingham,Alabama with Goal of Improving Licensing Interface Between Licensee & NRC ML20212J3501999-06-23023 June 1999 Forwards Draft Ltr for Use in Transmitting FERC Rept Re 981008 Audit to Licensee & Copy of FERC Insp Rept ,containing Color Photographs.Without Encls ML20196H9721999-06-23023 June 1999 Requests Attached Request for Addl Info Be Put Into NRC Public Document Room.Encl RAI e-mailed to W Sparkman of Southern Nuclear Operating Co on 990610 IA-96-023, Forwards Response to TIA-96-023 Re Review of Plant,Units 1 & 2 Licensing Basis & Acceptability of Kaowool as Electrical Raceway fire-barrier1999-06-18018 June 1999 Forwards Response to TIA-96-023 Re Review of Plant,Units 1 & 2 Licensing Basis & Acceptability of Kaowool as Electrical Raceway fire-barrier ML20205N7511999-04-13013 April 1999 Requests That Attached RAI Re TS 3/4.4.7.2e Be Placed in NRC Pdr.Informs That RAI Was Faxed to W Sparkman on 990413 & Will Be Used to Facilitate Discussions During Upcoming Telcon Between NRC & Snoc Staff ML20205M8681999-04-13013 April 1999 Requests That Encl Topics for Discussion Be Made Available in NRC Pdr.Items Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & SNC Staff ML20205J1401999-04-0505 April 1999 Notification of 990419 Meeting with Util to Discuss Licensee Justification of Certain TS Changes Need to Implement Improved Standard Ts.Meeting Was Held in Rockville,Md ML20205G5781999-04-0101 April 1999 Notification of 990416 Meeting with Snoc in Rockville,Md to Discuss Farley Npp,Unit 1 SG Operational Assessment ML20205C8771999-03-31031 March 1999 Requests That Encl questions,e-mailed to W Sparkman of Southern Nuclear Operating Co,Inc,Which Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & Util Be Made Available in NRC PDR IR 05000348/19983001999-03-0101 March 1999 Forwards NRC Operator Licensing Exam Repts 50-348/98-300 & 50-364/98-300 (Including Completed & Graded Tests) for Tests Administered on 980313 ML20207J4681999-03-0101 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980313 at Farley NPP ML20202E1621999-01-29029 January 1999 Requests That Encl RAI Be Made Available in NRC Pdr.Subj Document Neither Constitutes Formal Request for Info Nor Represent Formal NRC Position.Encl RAI Faxed on 990129 to W Sparkman of Snoc ML20198H5741998-12-22022 December 1998 Notification of 990107 Meeting with Util in Rockville,Md to Discuss Licensee Justification of Certain TS Changes Needed to Implement Improved Standard TSs ML20197J0501998-12-14014 December 1998 Requests That Encl Memo & Attachments Associated with Task Interface Agreement (TIA 96-023) Fraley License Basis & Acceptability of Kaowool as Electrical Raceway Fire Barrier Be Placed in NRC PDR ML20196H1181998-12-0404 December 1998 Forwards Message Faxed to M Ajluni of Southern Nuclear Operating Co (SNC) on 981204,to Prepare SNC for Conference Call.Message Does Not Constitute Formal Request for Info or Represent Formal NRC Staff Position ML20196E2911998-12-0101 December 1998 Notification of 981215 Meeting with Util in Rockville,Md to Discuss Matters Re Kaowool Fire Barriers Installed at Plant ML20195B7721998-11-12012 November 1998 Forwards Message That Had Been Faxed to M Ajluni on 981112. Purpose of Message Was to Prepare Licensee Personnel for Conference Call Re SG Tube Insp Results for Farley NPP Unit 1 ML20196F7001998-11-0202 November 1998 Notification of 981215 Meeting with Southern Nuclear Operating Co in Rockville,Maryland to Discuss Matters Re Current SG Tube Insps at Farley NPP Unit 1 ML20154L1171998-10-15015 October 1998 Notification of 981026 Meeting with Util in Rockville,Md to Discuss Westinghouse BE-LOCA Abbreviated Reanalysis for Plant,Units 1 & 2 New SG ML20154B0411998-09-29029 September 1998 Notification of 981014 Meeting with Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Justification of Certain TS Changes Needed to Implement Improved Std TSs ML20154B0681998-09-29029 September 1998 Notification of 981008 Meeting with Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Repair of SG Tubes ML20217B1371998-04-21021 April 1998 Forwards Three Documents Associated W/Farley Nuclear Plant, Units 1 & 2-licensing/design Basis for Tornado Missile Protection to Be Made Available in PDR ML20217H4431998-04-0101 April 1998 Forwards Message Faxed on 980401 to M Ajluni of Southern Nuclear Operating Co,Inc (Snc).Purpose of Message Was to Prepare SNC Personnel for Conference Call & Does Not Consitute Formal Request for Info ML20217B1811997-12-18018 December 1997 Discusses Design Insp of Farley Units 1 & 2,for Jan-March of 1997,identified Tornado Missile Protection Issue Re Exhaust Piping & Silencers for EDG for Both Units (Including Station Blackout DG) ML20198S9281997-10-31031 October 1997 Notification of 971120 Meeting W/Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Plans & Schedule for SG Replacement ML20217B1961997-10-15015 October 1997 Discusses Review of Farley Nuclear Plant,Units 1 & 2 Licensing & Design Basis for Protection Against Tornado Missiles at Farley in Accordance w/970402 Memo from RM Gallo ML20217D9721997-09-30030 September 1997 Notification of 971022 Meeting W/Licensee in Rockville,Md to Discuss Licensee Initiatives That Focus on Planned Licensing Actions for FNP & Corrective Measures Related to Problems Considered by Licensee Mgt to Warrant Special Attention ML20216G2151997-09-0505 September 1997 Notification of 970916 Meeting W/Snoc in Rockville,Md to Discuss Improved Standard Technical Specification Conversion Application & Schedule for Submittal ML20236N3231997-08-21021 August 1997 Forwards SER in Response to Licensee 970522 Requested Interpretation of TS 4.8.1.1.2.e for Two Shared EDGs ML20148J8131997-06-16016 June 1997 Notifies of 970701 Meeting W/Util in Rockville,Md to Discuss Util Initiatives That Focus on Planned Licensing Actions for Plant & Corrective Measures Re Problems Considered by Util Mgt ML20141B0131997-06-16016 June 1997 Notification of 970701 Meeting W/Southern Nuclear Operating Co in Rockville,Md to Discuss SNC Initiatives That Focus on Planned Licensing Action for FNP & Corrective Measures. Meeting Cancelled ML20217B2111997-04-0202 April 1997 Informs That During Insp of Farley Units 1 & 2 in Jan-March 1997,NRR Led Insp Team Identified Tornado Missile Protection Issue W/Exhaust Silencers for DG for Both Units ML20236M9961997-03-27027 March 1997 Forwards Response to Questions Re Ventilation Specs for Farley ML20137C2501997-03-20020 March 1997 Forwards Message to M Ajluni of Southern Nuclear Operating Re Preparing Licensee Personnel for Conference Call ML20236M9661997-02-12012 February 1997 Discusses from Southern Nuclear Operating Co Requesting NRC Review Interpretation of Application of TS 3/4.9.13 at Farley Nuclear Plant,Units 1 & 2 During Modes 5 or 6,or When Defueled ML20134B3421997-01-27027 January 1997 Notification of 970205 Meeting W/Listed Attendees in Rockville,Md to Discuss Util Plans & Schedule for Submitting Proposed TS Amend Request Re Use of Direct Tube Repair Method in Repair of SG ML20197J0751996-11-26026 November 1996 Requests Technical Assistance in Evaluation of Issues Identified During Routine Insp at Plant.Insp Rept Summary with Justification Encl ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML17164A5301995-01-17017 January 1995 Forwards Attached Documents Re Postulated Loss of Sfpc Events at Plant,Units 1 & 2 ML17164A4761994-12-23023 December 1994 Forwards Documents for NRC Staff Re Ongoing Review of Spent Fuel Pool Cooling Design Issues at Plant ML20149E9221994-02-18018 February 1994 Responds to 930215 Request from J Strosnider Re Documentation of Concerns Re Plant Two Volt IPC Proposal & Resolution of Public Comments Concerning Voltage Based Repair Criteria NUREG-1231, Forwards Documents Referenced in Suppl 16 to NUREG-09331993-11-29029 November 1993 Forwards Documents Referenced in Suppl 16 to NUREG-0933 ML20058J7101993-11-18018 November 1993 Notification of Significant Licensee Meeting W/Util on on 931123 to Discuss Plant SALP Board Assessment for Period of 930531-0925 IR 05000364/19930261993-11-10010 November 1993 Notification of Significant Licensee Meeting W/Util on 931117 in Atlanta,Ga to Discuss Violation 50-364/93-26-01 Re Personnel Error Resulting in Losses of Configuration Control During Performance of Maint & Testing Activities ML20057C3131993-09-15015 September 1993 Notification of Significant Licensee Meeting W/Util on 931013 to Discuss SALP Performance of Facility During Period 920531-0925 ML20056E4221993-08-0606 August 1993 Requests Written Inputs on Performance of Farley Facilities During Completed SALP Cycle 11 During Period 920531-930925 Using Encl Feeder Forms.Salp Board Meeting for Farley Scheduled for 931013 ML20046D0061993-08-0202 August 1993 Notification of Significant Licensee Meeting 93-99 on 930831 in Monroeville,Pa to Discuss Status of Decommissioning of Former B&W Nuclear Fuel Fabrication Facility in Apollo & Operations at Parks Township Site ML20046B1751993-07-15015 July 1993 Requests That Encl Documents Received from Thermal Ceramics, Inc Be Placed in PDR & Copies Distributed to Listed Individuals ML20044B7801993-02-12012 February 1993 Notification of Cancellation of 930304 Meeting W/Util in Rockville,Md to Discuss Emergency Response Facility Staffing Time 1999-06-23
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217F3351999-10-14014 October 1999 Notification of 991103-04 Southern Nuclear Operating Licensing Workshop in Birmingham,Alabama with Goal of Improving Licensing Interface Between Licensee & NRC ML20212J3501999-06-23023 June 1999 Forwards Draft Ltr for Use in Transmitting FERC Rept Re 981008 Audit to Licensee & Copy of FERC Insp Rept ,containing Color Photographs.Without Encls ML20196H9721999-06-23023 June 1999 Requests Attached Request for Addl Info Be Put Into NRC Public Document Room.Encl RAI e-mailed to W Sparkman of Southern Nuclear Operating Co on 990610 IA-96-023, Forwards Response to TIA-96-023 Re Review of Plant,Units 1 & 2 Licensing Basis & Acceptability of Kaowool as Electrical Raceway fire-barrier1999-06-18018 June 1999 Forwards Response to TIA-96-023 Re Review of Plant,Units 1 & 2 Licensing Basis & Acceptability of Kaowool as Electrical Raceway fire-barrier ML20205N7511999-04-13013 April 1999 Requests That Attached RAI Re TS 3/4.4.7.2e Be Placed in NRC Pdr.Informs That RAI Was Faxed to W Sparkman on 990413 & Will Be Used to Facilitate Discussions During Upcoming Telcon Between NRC & Snoc Staff ML20205M8681999-04-13013 April 1999 Requests That Encl Topics for Discussion Be Made Available in NRC Pdr.Items Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & SNC Staff ML20205J1401999-04-0505 April 1999 Notification of 990419 Meeting with Util to Discuss Licensee Justification of Certain TS Changes Need to Implement Improved Standard Ts.Meeting Was Held in Rockville,Md ML20205G5781999-04-0101 April 1999 Notification of 990416 Meeting with Snoc in Rockville,Md to Discuss Farley Npp,Unit 1 SG Operational Assessment ML20205C8771999-03-31031 March 1999 Requests That Encl questions,e-mailed to W Sparkman of Southern Nuclear Operating Co,Inc,Which Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & Util Be Made Available in NRC PDR IR 05000348/19983001999-03-0101 March 1999 Forwards NRC Operator Licensing Exam Repts 50-348/98-300 & 50-364/98-300 (Including Completed & Graded Tests) for Tests Administered on 980313 ML20207J4681999-03-0101 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980313 at Farley NPP ML20202E1621999-01-29029 January 1999 Requests That Encl RAI Be Made Available in NRC Pdr.Subj Document Neither Constitutes Formal Request for Info Nor Represent Formal NRC Position.Encl RAI Faxed on 990129 to W Sparkman of Snoc ML20198H5741998-12-22022 December 1998 Notification of 990107 Meeting with Util in Rockville,Md to Discuss Licensee Justification of Certain TS Changes Needed to Implement Improved Standard TSs ML20197J0501998-12-14014 December 1998 Requests That Encl Memo & Attachments Associated with Task Interface Agreement (TIA 96-023) Fraley License Basis & Acceptability of Kaowool as Electrical Raceway Fire Barrier Be Placed in NRC PDR ML20196H1181998-12-0404 December 1998 Forwards Message Faxed to M Ajluni of Southern Nuclear Operating Co (SNC) on 981204,to Prepare SNC for Conference Call.Message Does Not Constitute Formal Request for Info or Represent Formal NRC Staff Position ML20196E2911998-12-0101 December 1998 Notification of 981215 Meeting with Util in Rockville,Md to Discuss Matters Re Kaowool Fire Barriers Installed at Plant ML20195B7721998-11-12012 November 1998 Forwards Message That Had Been Faxed to M Ajluni on 981112. Purpose of Message Was to Prepare Licensee Personnel for Conference Call Re SG Tube Insp Results for Farley NPP Unit 1 ML20196F7001998-11-0202 November 1998 Notification of 981215 Meeting with Southern Nuclear Operating Co in Rockville,Maryland to Discuss Matters Re Current SG Tube Insps at Farley NPP Unit 1 ML20154L1171998-10-15015 October 1998 Notification of 981026 Meeting with Util in Rockville,Md to Discuss Westinghouse BE-LOCA Abbreviated Reanalysis for Plant,Units 1 & 2 New SG ML20154B0411998-09-29029 September 1998 Notification of 981014 Meeting with Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Justification of Certain TS Changes Needed to Implement Improved Std TSs ML20154B0681998-09-29029 September 1998 Notification of 981008 Meeting with Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Repair of SG Tubes ML20217B1371998-04-21021 April 1998 Forwards Three Documents Associated W/Farley Nuclear Plant, Units 1 & 2-licensing/design Basis for Tornado Missile Protection to Be Made Available in PDR ML20217H4431998-04-0101 April 1998 Forwards Message Faxed on 980401 to M Ajluni of Southern Nuclear Operating Co,Inc (Snc).Purpose of Message Was to Prepare SNC Personnel for Conference Call & Does Not Consitute Formal Request for Info ML20217B1811997-12-18018 December 1997 Discusses Design Insp of Farley Units 1 & 2,for Jan-March of 1997,identified Tornado Missile Protection Issue Re Exhaust Piping & Silencers for EDG for Both Units (Including Station Blackout DG) ML20198S9281997-10-31031 October 1997 Notification of 971120 Meeting W/Util in Rockville,Md to Discuss Southern Nuclear Operating Co,Inc Plans & Schedule for SG Replacement ML20217B1961997-10-15015 October 1997 Discusses Review of Farley Nuclear Plant,Units 1 & 2 Licensing & Design Basis for Protection Against Tornado Missiles at Farley in Accordance w/970402 Memo from RM Gallo ML20217D9721997-09-30030 September 1997 Notification of 971022 Meeting W/Licensee in Rockville,Md to Discuss Licensee Initiatives That Focus on Planned Licensing Actions for FNP & Corrective Measures Related to Problems Considered by Licensee Mgt to Warrant Special Attention ML20216G2151997-09-0505 September 1997 Notification of 970916 Meeting W/Snoc in Rockville,Md to Discuss Improved Standard Technical Specification Conversion Application & Schedule for Submittal ML20236N3231997-08-21021 August 1997 Forwards SER in Response to Licensee 970522 Requested Interpretation of TS 4.8.1.1.2.e for Two Shared EDGs ML20148J8131997-06-16016 June 1997 Notifies of 970701 Meeting W/Util in Rockville,Md to Discuss Util Initiatives That Focus on Planned Licensing Actions for Plant & Corrective Measures Re Problems Considered by Util Mgt ML20141B0131997-06-16016 June 1997 Notification of 970701 Meeting W/Southern Nuclear Operating Co in Rockville,Md to Discuss SNC Initiatives That Focus on Planned Licensing Action for FNP & Corrective Measures. Meeting Cancelled ML20217B2111997-04-0202 April 1997 Informs That During Insp of Farley Units 1 & 2 in Jan-March 1997,NRR Led Insp Team Identified Tornado Missile Protection Issue W/Exhaust Silencers for DG for Both Units ML20236M9961997-03-27027 March 1997 Forwards Response to Questions Re Ventilation Specs for Farley ML20137C2501997-03-20020 March 1997 Forwards Message to M Ajluni of Southern Nuclear Operating Re Preparing Licensee Personnel for Conference Call ML20236M9661997-02-12012 February 1997 Discusses from Southern Nuclear Operating Co Requesting NRC Review Interpretation of Application of TS 3/4.9.13 at Farley Nuclear Plant,Units 1 & 2 During Modes 5 or 6,or When Defueled ML20134B3421997-01-27027 January 1997 Notification of 970205 Meeting W/Listed Attendees in Rockville,Md to Discuss Util Plans & Schedule for Submitting Proposed TS Amend Request Re Use of Direct Tube Repair Method in Repair of SG ML20197J0751996-11-26026 November 1996 Requests Technical Assistance in Evaluation of Issues Identified During Routine Insp at Plant.Insp Rept Summary with Justification Encl ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML17164A5301995-01-17017 January 1995 Forwards Attached Documents Re Postulated Loss of Sfpc Events at Plant,Units 1 & 2 ML17164A4761994-12-23023 December 1994 Forwards Documents for NRC Staff Re Ongoing Review of Spent Fuel Pool Cooling Design Issues at Plant ML20149E9221994-02-18018 February 1994 Responds to 930215 Request from J Strosnider Re Documentation of Concerns Re Plant Two Volt IPC Proposal & Resolution of Public Comments Concerning Voltage Based Repair Criteria NUREG-1231, Forwards Documents Referenced in Suppl 16 to NUREG-09331993-11-29029 November 1993 Forwards Documents Referenced in Suppl 16 to NUREG-0933 ML20058J7101993-11-18018 November 1993 Notification of Significant Licensee Meeting W/Util on on 931123 to Discuss Plant SALP Board Assessment for Period of 930531-0925 IR 05000364/19930261993-11-10010 November 1993 Notification of Significant Licensee Meeting W/Util on 931117 in Atlanta,Ga to Discuss Violation 50-364/93-26-01 Re Personnel Error Resulting in Losses of Configuration Control During Performance of Maint & Testing Activities ML20057C3131993-09-15015 September 1993 Notification of Significant Licensee Meeting W/Util on 931013 to Discuss SALP Performance of Facility During Period 920531-0925 ML20056E4221993-08-0606 August 1993 Requests Written Inputs on Performance of Farley Facilities During Completed SALP Cycle 11 During Period 920531-930925 Using Encl Feeder Forms.Salp Board Meeting for Farley Scheduled for 931013 ML20046D0061993-08-0202 August 1993 Notification of Significant Licensee Meeting 93-99 on 930831 in Monroeville,Pa to Discuss Status of Decommissioning of Former B&W Nuclear Fuel Fabrication Facility in Apollo & Operations at Parks Township Site ML20046B1751993-07-15015 July 1993 Requests That Encl Documents Received from Thermal Ceramics, Inc Be Placed in PDR & Copies Distributed to Listed Individuals ML20044B7801993-02-12012 February 1993 Notification of Cancellation of 930304 Meeting W/Util in Rockville,Md to Discuss Emergency Response Facility Staffing Time 1999-06-23
[Table view] |
Text
n 5
^
March 31, 1999 MEMORANDUM TO: Docket File.
FROM:
Jacob 1.Zimmerman, Project Manager Origina1 signed by:
Project Directorate ll/Section 1 Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
FARLEY UNITS 1 AND 2 - PLACEMENT OF A DOCUMENT IN THE PUBLIC DOCUMENT ROOM Please make the attached questions available in the NRC's Public Document Room, l
These questions wore e-mailed, today, to Wes Sparkman of the Southern Nuclear Operating Company, Inc. These questions will be used to facilitate discussions during an upcoming conference call between NRC and SNC staffs. This document neither constitutes a formal request for information nor does it represent a formal NRC staff position.
Docket Nos. 50-348 and 50-364
Attachment:
As stated Distribution Docket File RUBLICU H. Berkow R. Emch S. Tingen Ol' D\\
DOCUMENT NAME: G:\\FARLEY\\9507RAl.WPD Ta receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure
'E" = Copy with attachment / enclosure "N" = No copy OFFICE PMfS)(-f)
LA:PDil 2 SC:ll-1 l
D:P0l h l NAME JZimMefman:en CHawes(f/M REmch HBdr@ V DATE
$ /D/99 8 (dv/99 3 /31/99
'6/ g[/99
/ /99
/ /97 OFFICIAL RECORD COPY 9904020051 990331 PDR ADOCK 05000348 P
PDR
0no 9
uq p*
UNITED STATES s
j NUCLEAR REGULATORY COMMISSION "p
2 WASHINGTON, D.C. 2055W1 March 31, 1999 MEMORANDUM TO: Docket File FROM:
Jacob 1. Zimmerman, Project Manager M-Project Directorate ll/Section 1 Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
FARLEY UNITS 1 AND 2 - PLACEMENT OF A DOCUMENT IN THE PUBLIC DOCUMENT ROOM Please make the attached questions available in the NRC's Public Document Room.
These questions were e-mailed, today, to Wes Sparkman of the Southern Nuclear Operating Company, Inc. These questions will be used to facilitate discussbns during an upcoming conference call between NRC and SNC staffs. This document neither constitutes a formal l
request for information nor does it represent a formal NRC staff position.
Docket Nos. 50-348 and 50-364 1
i
Attachment:
As stated i
Conference Call Questions Joseph M. Farley, Units 1 and 2 Generic Letter 95-07," Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves" 1.
Your submittal dated June 30,1996, states that the residual heat removal (RHR) to hot Leg injection valves,1(2)-MOV8889, are not susceptible to pressure locking because they are not opened until 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br /> after initiation of an accident and after 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br /> 4
prqssure in the bonnets will decay. Does the temperature of the valves increase at any time during the 11-hour period? If so, are the valves susceptible to thermalinduced pressure locking?
2.
In Attachment 1 to GL 95-07, the NRC staff requested that licensees include consideration of the potential for gate valves to undergo pressure locking or thermal binding during surveillance testing. During workshops on GL 95-07 in each Region, the NRC staff stated that, if closing a safety-related power-operated gate valve for test or surveillance defeats the capability of the safety system or train the licensee should peifonn one of the following within the scope of GL 95-07:
a.
Verify that the valve is not susceptible to pressure locking or thermal binding while closed, b.
Follow plant technical specifications for the tra:n/ system while the valve is closed, c.
Demonstrate that the actuator has sufficient capacity to overcome these j
phenomena, or
)
d.
Make appropriate hardware and/or procedural modifications to prevent pressure locking and thermal binding.
]
The staff stated that normally open, safety-related power-operated gate valves, which are closed for st veillance but must return to the open position, would be evaluated within the scope of GL 95-07. Your July 30,1996, submittal states that when you stroke test a valve you do not declare it inoperable because it is shut for only 1 to 2 minutes.
This does not comply with GL 95-07 scoping guidance. Are there any instances where a valve would be stroked shut for testing and while the valve is shut the upstream and/or downstream pressure could decrease to less than the pressure in the bonnet and the valve may not reopen due to pressure locking defeating the capability of the safety system or train?
3.
Your February 12,1996, submittal lists the RHR pump recirculation valves, 2-FCV0602A/B, and the low head safety injection cold leg injection valves, 1(2) MOV8888A/B, as screening code PL-7 and the submittal states that all PL-7 screening codes require an analytical evaluation using the Entergy Operations Inc.,
and/or the Commonwealth Edison models. What anc.lytical method was used to l
demonstrate that these valves will operate during pressure locking conditions? Describe the margins between the required thrust to overcome pressure locking and actuator capability. Explain why these valves are not susceptible the thermal binding.
4.
Are Units 1 and 2 licensed as hot shutdown?
i
.