ML20217H443

From kanterella
Jump to navigation Jump to search
Forwards Message Faxed on 980401 to M Ajluni of Southern Nuclear Operating Co,Inc (Snc).Purpose of Message Was to Prepare SNC Personnel for Conference Call & Does Not Consitute Formal Request for Info
ML20217H443
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/01/1998
From: Jacob Zimmerman
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9804030338
Download: ML20217H443 (2)


Text

  • - - - . -

~~~

p UNITED STATES

.I g j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. enmas wt

% /

April 1,1998 MEMO TO: Docket File FROM: Jacob 1. Zimmerman, Project Manager Project Directorate Il-2 Division of Reactor Projects -1/11 Office of Nuclear Reactor Regulation

SUBJECT:

FARLEY UNIT 2 - PUTTING A DOCUMENT IN THE PUBLIC DOCUMENT ROOM The attached message was faxed today to Mark Ajiuni of Southern Nuclear Operating Company, INC (SNC). The sole purpose of the message is to prepare SNC personnel for a conference call. The message itself does not constitute a formal request for information or represent a fomial NRC staff position.

Docket Number 50-364 Distnbyti20 PUBLIC >

H. Berkow I S. Coffin l' 1

\\\

0\

rea;;g h ga LunL2 4+a d e

9804030338 980401 PDR ADOCK 05000364 P PDR

fy Steam Generator Tube inspection Results Licensees' steam generator (SG) tube eddy current (EC) inspections play a vital role in the management of SG tube degradation. The results are used to demonstrate adequate structural and leakage integrity of the SG tubes. .

NRC staff is interested in discussing the licensee's steam generator inspection plans and results, although the licensee is not required to participate in this discenion. The following list

. of topics describes areas the NRC staff is interested in discussing:

o Primary to secondary leakage prior to shutdown e Results of secondary side hydro i l

e For each steam generator, a general description of areas examined; including I expansion criteria and type of probe used in each area l i

e- For analyzed EC results, a description of bobbin indications (those not examined with RPC) and RPC/Plus Point /Cecco indications.- Including the following information:

location, number, degradation mode, disposition, and voltages / depths / lengths of most significant indications e Description of repair / plugging plans

  • Discussion of previous history; "look backs" performed; consideration of similar plants' experiences e Discussion of new inspection findings, including loose arts indications e Description of in-situ pressure test plans and results; include tube selection criteria, test pressure plans, test configuration e Describe tube pull plans and preliminary results; include tube selection criteria and evaluation plans e Assessment of tube integrity for previous operating cycle e . Assessment of tube integrity for next operating cycle

~

e Provide schedule for steam generator-related activities during remainder of current outage 1