ML20212B996

From kanterella
Revision as of 15:23, 21 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs Page 3.3-52,deleting Condition G as Well as or G from Condition H,Per TS Change Request TSCR-003
ML20212B996
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 09/15/1999
From:
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
Shared Package
ML20212B982 List:
References
NUDOCS 9909210083
Download: ML20212B996 (1)


Text

.

o Primary Containment Isolation Instrumentation 3.3.6.1 ACITONS .(continued)

CONDITION REQUIRED ACTION COMPLETION TIME 1 F. As required by F.1 Isolate the affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Recuired Action C.1 penetration flow anc referenced in path (s).

Table 3.3.6.1-1.

G. As required G.1 Isolate the af eV e Recuired Action C.1 N ow anc referenced in /a LETE .

H. As required by H.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Recuired Action C.1 anc referenced in MD Table 3.3.6.1-1.

H.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> QB Required Action and associated Completion Time for Condition F ee-G-not met. l I. As required by I.1 Declare Standby 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Required Action C.1 Liquid Control (SLC) and referenced in System inoperable.

Table 3.3.6.1-1.

I.2 Isolate the Reactor 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Water Cleanup System.

(continued) 9909210083 990915 DR ADOCK 0 3 1-DAEC 3.3-52 f.; MTent 220