MONTHYEARML20212B9961999-09-15015 September 1999 Proposed Tech Specs Page 3.3-52,deleting Condition G as Well as or G from Condition H,Per TS Change Request TSCR-003 ML20210B9411999-07-16016 July 1999 Proposed Tech Specs Revising SLMCPR to Support Operation with GE-12 Fuel with 10x10 Pin Array ML20206P2321999-05-10010 May 1999 Proposed Tech Specs Section 3.7.4,providing Specific Conditions & Required Actions for Control Bldg Barrier Degradation (as Opposed to Ventilation Train Degradation) ML20206P7401999-05-10010 May 1999 Proposed Tech Specs,Revising SLMCPR to Support Operation with GE-12 with 10x10 Pin Array ML20206J3011999-04-30030 April 1999 Proposed Tech Specs Pages,Revising TS Surveillance Requirement 3.4.3.1 to Implement More Appropriate Safety Valve & Safety Relief Valve Setpoint Tolerances ML20205P8031999-04-12012 April 1999 Proposed Tech Specs Re Relaxation of Excess Flow Check Valve Surveillance Testing ML20202E5931999-01-22022 January 1999 Proposed Tech Specs SR 3.8.1.7 Re Rev to DG Surveillance Requirement ML20204A7541999-01-22022 January 1999 Proposed Tech Specs Re Spent Fuel Racks Storage Update ML20206S2421999-01-21021 January 1999 Proposed Tech Specs Surveillance Requirement 3.8.1.7 for EDGs ML20154P6621998-10-15015 October 1998 Proposed Tech Specs 3.6.1.3,revising Condition E to Add Time Limit for Plant Operation If Penetration Flow Path Isolated by Single Purge Valve with Resilient Seal & Adding TS for Cb/Sbgt IAS NG-98-0720, Proposed Improved Tech Specs Page 5.0-21 for Reporting Requirements1998-04-17017 April 1998 Proposed Improved Tech Specs Page 5.0-21 for Reporting Requirements ML20217B8271998-04-15015 April 1998 Proposed Tech Specs Re RTS-300,revising Reactor Vessel pressure-temp Curve Update ML20203M5021998-02-26026 February 1998 Proposed Tech Specs Re Improved Conversion of Plant ML20199K9871998-02-0303 February 1998 Proposed Tech Specs Re Vessel Hydrostatic Pressure & Leak Testing Operability Requirements ML20199K9601998-02-0303 February 1998 Proposed Tech Specs Re Standby Liquid Control Operability Requirements ML20198P8871998-01-0909 January 1998 Proposed Tech Specs Section 3.7.B LCO for PCIVs Revised to Allow 72 Hours to Isolate Failed Valve Associated W/Closed Sys ML20203G5331997-11-21021 November 1997 Proposed Tech Specs Marked Up Pages for Improved TS for Rev a Showing Changes for Rev B ML20211J2331997-10-0303 October 1997 Proposed Tech Specs,Supplementing thermal-hydraulic Analysis Included as License Rept in 930326 to Murley NG-97-1010, Proposed Tech Specs Change for Instrument Setpoints1997-06-10010 June 1997 Proposed Tech Specs Change for Instrument Setpoints NG-97-0847, Proposed Tech Specs Revising Definition of LCO to Address Situation When Sys & Components Are Removed from Svc or Otherwise Made Inoperable During Secondary Modes of Operation,W/O Requiring Entry Into LCO Actions1997-05-0909 May 1997 Proposed Tech Specs Revising Definition of LCO to Address Situation When Sys & Components Are Removed from Svc or Otherwise Made Inoperable During Secondary Modes of Operation,W/O Requiring Entry Into LCO Actions ML20141D3621997-05-0909 May 1997 Proposed Tech Specs Revising Definitions of LSSS & Instrument/Channel Calibration to Ref New Program Being Added to TS for Control of Instrument Setpoints ML20115E0301996-07-0505 July 1996 Proposed TS Table 3.6.B.2-1,raising Reactor Water Conductivity Limit to Support Implementation of Noble Metal Chemical Addition at Plant as Method to Enhance Effectiveness of HWC in Mitigating IGSCC ML20101Q7191996-04-0909 April 1996 Proposed Tech Specs Re Recirculation Pump Trip Min Operable Channels ML20097A1871996-01-30030 January 1996 Proposed Tech Specs Revising Certain CR Scram Insertion Time Testing Limits ML20096F0211996-01-18018 January 1996 Proposed Tech Specs,Lowering RWCU Isolation Setpoint from Reactor Low Level to Reactor low-low Level ML20099L8491995-12-22022 December 1995 Proposed Tech Spec 3.7, Plant Containment Sys ML20095H2371995-12-15015 December 1995 Proposed Tech Specs,Incorporating EDG Conditional Surveillance & Editorial Clarifications ML20095A9011995-11-30030 November 1995 Proposed Tech Specs to Implement Option I-D Reactor Stability Solution ML20094M4131995-11-15015 November 1995 Proposed Tech Specs Re RPT Operability & Surveillance Requirements ML20087F5831995-08-0707 August 1995 Proposed Tech Specs Sections 6.5.2.8 & 6.5.3 Re Changes to Audit Program ML20086R8061995-07-21021 July 1995 Proposed Tech Specs,Eliminating Inappropriate Condition Surveillance in Sections 4.5 & 4.8,clarifying Requirements Governing Spent & New Fuel Storage in Section 5.5 ML20087H7021995-04-28028 April 1995 Proposed Tech Specs Bases Page 3.5-20,adding Clarification for Single Core Spray Pump Requirement ML20082S0201995-04-21021 April 1995 Proposed Tech Specs Reflecting Deletion of TS 6.5.3.1.2 Due to Audit Frequency Requirements Being Removed from TS ML20082D1171995-03-28028 March 1995 Proposed TS Table 3.2-A, Isolation Actuation Instrumentation ML20081C9891995-03-10010 March 1995 Proposed Tech Specs,Removing Redundant LCOs & SRs for Containment Hydrogen & Oxygen Monitors ML20080Q8731995-03-0101 March 1995 Proposed Tech Specs Reflecting Rev to TS Table of Contents, Incorporating New Section ML20080Q0851995-03-0101 March 1995 Proposed Tech Specs Modifying Pump & Valve Surveillance Criteria for LPCI & Core Spray Subsystems,Rhr Svc Water, Hpci,Esw & River Water Supply Systems from Once Every Three Months to Frequency Specified by DAEC ASME Section XI IST ML20078R9171995-02-13013 February 1995 Proposed TS Section 6.5.2.8 & 6.5..3.1,reflecting Deletion of Audit Frequency Requirements ML20080H5651995-02-13013 February 1995 Proposed Tech Specs Re Bases for Shutdown Cooling Piping Safety Limit ML20077A9191994-11-10010 November 1994 Proposed Tech Specs Re Offgas Radiation Monitors ML20149G9241994-10-28028 October 1994 Proposed Tech Specs,Deleting Plan for Integrated Scheduling of Plant Mods ML20076K9591994-10-20020 October 1994 Revised Proposed TS to TS Changes RTS-246 & RTS-246A ML20072F1651994-08-15015 August 1994 Proposed Tech Specs Increasing Allowable Main Steam Isolation Valve & Deleting TS Requirements Applicable to MSIV LCS ML20071Q6211994-07-29029 July 1994 Proposed Tech Specs Revising Isi/Ist Program Requirements ML20070H3321994-07-12012 July 1994 Proposed Tech Specs Surveillance Frequencies for Rod Block Instrument Sys ML20070E0411994-06-30030 June 1994 Proposed Tech Specs,Clarifying Requirements for Audit of Conformance to Tss,Deleting Requirement for Safety Committee Oversight of Audits & Allowing Designation of Signature Authority ML20070E0621994-06-30030 June 1994 Proposed Tech Specs Re Addition of Control Bldg Chiller Operability & Surveillance Requirements ML20070E0251994-06-30030 June 1994 Proposed Tech Specs Re Revision of ESW Flow Requirement 4.8.e.1 ML20069G9181994-05-27027 May 1994 Proposed TS Section 3.7, Containment Sys ML20069A9961994-05-0606 May 1994 Proposed TS SRs Section 4.6.G, Primary Sys Boundary Structural Integrity, Deleting SR Which Refers to ISI Program Interval,Allowing DAEC Current ISI Program Interval to Be Extended Per Ruling in Fr 57FR34666 1999-09-15
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212B9961999-09-15015 September 1999 Proposed Tech Specs Page 3.3-52,deleting Condition G as Well as or G from Condition H,Per TS Change Request TSCR-003 ML20210B9411999-07-16016 July 1999 Proposed Tech Specs Revising SLMCPR to Support Operation with GE-12 Fuel with 10x10 Pin Array ML20206P2321999-05-10010 May 1999 Proposed Tech Specs Section 3.7.4,providing Specific Conditions & Required Actions for Control Bldg Barrier Degradation (as Opposed to Ventilation Train Degradation) ML20206P7401999-05-10010 May 1999 Proposed Tech Specs,Revising SLMCPR to Support Operation with GE-12 with 10x10 Pin Array ML20206J3011999-04-30030 April 1999 Proposed Tech Specs Pages,Revising TS Surveillance Requirement 3.4.3.1 to Implement More Appropriate Safety Valve & Safety Relief Valve Setpoint Tolerances ML20205P8031999-04-12012 April 1999 Proposed Tech Specs Re Relaxation of Excess Flow Check Valve Surveillance Testing ML20202E5931999-01-22022 January 1999 Proposed Tech Specs SR 3.8.1.7 Re Rev to DG Surveillance Requirement ML20204A7541999-01-22022 January 1999 Proposed Tech Specs Re Spent Fuel Racks Storage Update ML20206S2421999-01-21021 January 1999 Proposed Tech Specs Surveillance Requirement 3.8.1.7 for EDGs ML20207E9931999-01-0707 January 1999 Rev 15 to Pump & Valve IST Program for Daec ML20205P8091998-11-30030 November 1998 Excess Flow Check Valve Testing Relaxation ML20154P6621998-10-15015 October 1998 Proposed Tech Specs 3.6.1.3,revising Condition E to Add Time Limit for Plant Operation If Penetration Flow Path Isolated by Single Purge Valve with Resilient Seal & Adding TS for Cb/Sbgt IAS ML20236T8621998-06-15015 June 1998 Third Ten Yr Interval ISI Summary Rept Refueling Outage 15 from 961116-980522 for DAEC Palo,Ia NG-98-0720, Proposed Improved Tech Specs Page 5.0-21 for Reporting Requirements1998-04-17017 April 1998 Proposed Improved Tech Specs Page 5.0-21 for Reporting Requirements ML20217B8271998-04-15015 April 1998 Proposed Tech Specs Re RTS-300,revising Reactor Vessel pressure-temp Curve Update ML20203M5021998-02-26026 February 1998 Proposed Tech Specs Re Improved Conversion of Plant ML20199K9871998-02-0303 February 1998 Proposed Tech Specs Re Vessel Hydrostatic Pressure & Leak Testing Operability Requirements ML20199K9601998-02-0303 February 1998 Proposed Tech Specs Re Standby Liquid Control Operability Requirements ML20198P8871998-01-0909 January 1998 Proposed Tech Specs Section 3.7.B LCO for PCIVs Revised to Allow 72 Hours to Isolate Failed Valve Associated W/Closed Sys ML20203G5331997-11-21021 November 1997 Proposed Tech Specs Marked Up Pages for Improved TS for Rev a Showing Changes for Rev B ML20211J2331997-10-0303 October 1997 Proposed Tech Specs,Supplementing thermal-hydraulic Analysis Included as License Rept in 930326 to Murley NG-97-1010, Proposed Tech Specs Change for Instrument Setpoints1997-06-10010 June 1997 Proposed Tech Specs Change for Instrument Setpoints NG-97-0847, Proposed Tech Specs Revising Definition of LCO to Address Situation When Sys & Components Are Removed from Svc or Otherwise Made Inoperable During Secondary Modes of Operation,W/O Requiring Entry Into LCO Actions1997-05-0909 May 1997 Proposed Tech Specs Revising Definition of LCO to Address Situation When Sys & Components Are Removed from Svc or Otherwise Made Inoperable During Secondary Modes of Operation,W/O Requiring Entry Into LCO Actions ML20141D3621997-05-0909 May 1997 Proposed Tech Specs Revising Definitions of LSSS & Instrument/Channel Calibration to Ref New Program Being Added to TS for Control of Instrument Setpoints ML20138D9791996-12-0505 December 1996 Rev 9 to Offsite Dose Assessment Manual for Gaseous & Liquid Effluents ML20115E0301996-07-0505 July 1996 Proposed TS Table 3.6.B.2-1,raising Reactor Water Conductivity Limit to Support Implementation of Noble Metal Chemical Addition at Plant as Method to Enhance Effectiveness of HWC in Mitigating IGSCC ML20101Q7191996-04-0909 April 1996 Proposed Tech Specs Re Recirculation Pump Trip Min Operable Channels ML20108B6271996-03-15015 March 1996 Rev 0 to Third Ten-Yr Insp Interval ISI Plan for DAEC Palo, Ia ML20097A1871996-01-30030 January 1996 Proposed Tech Specs Revising Certain CR Scram Insertion Time Testing Limits ML20096F0211996-01-18018 January 1996 Proposed Tech Specs,Lowering RWCU Isolation Setpoint from Reactor Low Level to Reactor low-low Level ML20099L8491995-12-22022 December 1995 Proposed Tech Spec 3.7, Plant Containment Sys ML20095H2371995-12-15015 December 1995 Proposed Tech Specs,Incorporating EDG Conditional Surveillance & Editorial Clarifications ML20095A9011995-11-30030 November 1995 Proposed Tech Specs to Implement Option I-D Reactor Stability Solution ML20094M4131995-11-15015 November 1995 Proposed Tech Specs Re RPT Operability & Surveillance Requirements ML20129H0041995-10-13013 October 1995 Weld Ref Sys ML20087F5831995-08-0707 August 1995 Proposed Tech Specs Sections 6.5.2.8 & 6.5.3 Re Changes to Audit Program ML20086R8061995-07-21021 July 1995 Proposed Tech Specs,Eliminating Inappropriate Condition Surveillance in Sections 4.5 & 4.8,clarifying Requirements Governing Spent & New Fuel Storage in Section 5.5 ML20087H7021995-04-28028 April 1995 Proposed Tech Specs Bases Page 3.5-20,adding Clarification for Single Core Spray Pump Requirement ML20082S0201995-04-21021 April 1995 Proposed Tech Specs Reflecting Deletion of TS 6.5.3.1.2 Due to Audit Frequency Requirements Being Removed from TS ML20082D1171995-03-28028 March 1995 Proposed TS Table 3.2-A, Isolation Actuation Instrumentation ML20081C9891995-03-10010 March 1995 Proposed Tech Specs,Removing Redundant LCOs & SRs for Containment Hydrogen & Oxygen Monitors ML20080Q8731995-03-0101 March 1995 Proposed Tech Specs Reflecting Rev to TS Table of Contents, Incorporating New Section ML20080Q0851995-03-0101 March 1995 Proposed Tech Specs Modifying Pump & Valve Surveillance Criteria for LPCI & Core Spray Subsystems,Rhr Svc Water, Hpci,Esw & River Water Supply Systems from Once Every Three Months to Frequency Specified by DAEC ASME Section XI IST ML20080H5651995-02-13013 February 1995 Proposed Tech Specs Re Bases for Shutdown Cooling Piping Safety Limit ML20078R9171995-02-13013 February 1995 Proposed TS Section 6.5.2.8 & 6.5..3.1,reflecting Deletion of Audit Frequency Requirements ML20078L1201995-01-26026 January 1995 Rev 13 to Pump & Valve IST Program for Daec ML20077A9191994-11-10010 November 1994 Proposed Tech Specs Re Offgas Radiation Monitors ML20149G9241994-10-28028 October 1994 Proposed Tech Specs,Deleting Plan for Integrated Scheduling of Plant Mods ML20076K9591994-10-20020 October 1994 Revised Proposed TS to TS Changes RTS-246 & RTS-246A ML20072F1651994-08-15015 August 1994 Proposed Tech Specs Increasing Allowable Main Steam Isolation Valve & Deleting TS Requirements Applicable to MSIV LCS 1999-09-15
[Table view] |
Text
y 4
[$
Table 3.2-D LJ s RADI ATIOil MONITORING INSTRUMENTATION MINIMUM APPLICABLE VALVE (s) s CHANNELS OPERATING ALARM / TRIP OPERATED INSTRUMENTATION OPERABLE MODES SETPOINT BY SIGNAL ACTION
.E Offgas Post-Treatment Radiation 1
(a)
(a) 50 Q
Monitors Offgas Pre-Treatment Radiation 1
(b)
NA 51
.EI Monitors
$2 Main Steam Line Radiation Monitors 2
C*
5 31 Normal (c)
Full Power
Background
S O
w
- When the offgas system is o rating.
no Refer to Specification 3.7 e
o4 S
(a)
The m>nitors shall be set to nitiate immediate closure of the charcoal bed bypass valve and the air ejector offgas isolation valve at a setting equivalent to or below the dore rete limite in DDAM Section 6.2.2.1.
(b)
The monitors shall be set to initiate an alarm if the monitor exceeds a trip setting equivalent to 1.0 CL/sec of noble gases after 30 minutes delay in the offgas holdup line.
TPU 4 (c)
Trips Mechanical Vacuum Pump which results in a subsequent isolation of the Mechanical Vacuum Pump C#
suction valves.
- C ACTION O
gy RADIATION MONITORING INSTRUMENTATION ON nM ACTION 50 - With the number of OPERABLE channels less then required by the Minimum Channels Operable 7;"
requirement, gases from the steam air ejector offgas system may be released to the environment oo for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> pcovided (1) the charcoal bed of the offgas system is not bypassed, and (2) g tn s the offgas stack noble gas activity monitor is operable.
n 0"
D y@O Otherwise, be in at least HOT STANDBY within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
h g
CKA O 5
ICA ACTION 51 - With the n' amber of OPERABLE channels less than required by the Minimum Channels Operable m
requirement, gases from the steam air ejector offgas system may be released for up to 30 days provided (1) the charcoal bed of the offgas system is not bypassed, (2) Grab samples are O
collected and analyzed weekly, and (3) the offgas stack noble gas activity monitor is OPERABLE or at least 1 post-treatment monitor is OPERABLE.
g l
Otherwise, ce-in at least HOT STANDBY within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
g Sa 8
u
~
L g
Eg l Table 4.2-D l
RADIATION MONITORING INSTRUMENTATION SURVEILLANCE REOUIREMENTS F
~
,~
w OPERATING MODES CHANNEL FOR WHICH y
CHANNEL FUNCTIONAL CHANNEL SOURCE SURVEILLANCE N
INSTRUMENTATION CHECK TEST CALIBRATION CHECK REQUIRED w$
Offgas Post-Treatment Radiation Monitors D
Q**
R M
h Offgas Pre-Treatment Radiation Monitors D
Q**
R M
s Main Steam Line Radiation Monitors Once/ shift Q*'
R R
l
?
N
- When the offgas system is operating y
The CHANNEL FUNCTIONAL TEST shall also demonstrate that control room alare. annunciation occurs if any of the following conditions exists a.
Instrument indicates measured levels above the alarm / trip setpoint b.
Instrument indicates a downscale failure c.
Instrument controle not set in the operate mode.
This channel functional test will consist of injecting a simulated electrical signal. Into the measurement channels.
PA l
l Refer to Specification 3.7 E
o
?
3 1
r+
O z
2i L
\\
8l "i
L_______________________._
Attachment to NG-94-3904 DAEC-1
.l 1
d.
The CORE OPERATING LIMITS REPORT, including any mid-cycle revisions or supplements shall be provided upon issuance, for each reload' cycle, to the NRC Document Control Desk with copies to the Regional Administrator and Resident Inspector.
6.11.3 UNIOUE REPORTING RE0VIREMENTS Special reports shall be submitted to the Director of Inspection and Enforcement Regional Office within the time period specified for each report. These reports shall be submitted covering the activities identified below pursuant to the requirements of the applicable reference specification.
a.
Reactor vessel base. weld and heat affected zone metal test specimens (Specification 4.6.A.2).
b.
deleted c.
Inservice inspection (Specification 4.6.G.).
d.
Reacto tainment Integrated Leakage Rate Test (Specification 4.7.
WhqF).
e.
deleted f.
deleted 9
deleted h.
Radioactive Liquid or Gaseous Effluent - calculated dose exceeding specified limit (ODAM Sections 6.1.3, 6.2.3 and 6.2.4).
i.
Off-Gas System inoperable (ODAM Section 6.2.5).
l j.
Measured levels of radioactivity in an environmental sampling medium determined to exceed the reporting level values of ODAM Table 6.3-3 when averaged over any calendar quarter sampling period (0 DAM l
Section 6.3.2.1).
k.
Annual dose to a MEMBER OF THE PUBLIC determined to exceed 40 CFR Part 190 dose limit (ODAM Section 6.3.1.1).
~
1.
Radioactive ' liquid waste released without treatment when ectivity concentration is equal to or greater than 0.01 pci/ml (ODAM Section 6.1.4.1).
m.
Explosive Gas Monitoring Instrumentation Inoperable (Specification 3.2.1.1).
l n.
Liquid Holdup Tank Instrumentation Inoperable (Specification 3.14.B.1).
AMENDMENT NO. ($6,I56.199 6.11-5