ML20082S020

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Reflecting Deletion of TS 6.5.3.1.2 Due to Audit Frequency Requirements Being Removed from TS
ML20082S020
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 04/21/1995
From:
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
Shared Package
ML20082R790 List:
References
NUDOCS 9505020323
Download: ML20082S020 (1)


Text

__

.-.2 DAEC-1

b. Reports of reviews encompassed by Specification 6.5.2.7 above, shall be prepared, approved and forwarded to the President within 14 days following completion of the review.
c. Audit reports encompassed by Specification 6.5.2.8 above, shall be forwarded to the President and to the management positions responsible for the areas audited within 30 days after completion of the audit.

6.5.3 Other Review and Audit 6.5.3.1 Fire Protection Inspection 6.5.3.1.1 An independent fire protection and loss prevention inspection and audit shall be perfomeds utilizing either qualified offsite licensee personnel or an outside fire protection firm.

-frcG . 'i .1.2 Arr-hrgetriun and auuit by are uut:.ide yntr'iet-fire c;nsult:st-sh !' b; ;;;rfor ;d-4t intervels nc greater then three ;/::rs.-

6.5 10 A*endment yg. 70g RTS 27s Gyl5Gb AfPJL %I; RSS 9505020323 950421 PDR ADOCK 05000331 PDR P'

_ _