MONTHYEARML20212B9961999-09-15015 September 1999 Proposed Tech Specs Page 3.3-52,deleting Condition G as Well as or G from Condition H,Per TS Change Request TSCR-003 ML20210B9411999-07-16016 July 1999 Proposed Tech Specs Revising SLMCPR to Support Operation with GE-12 Fuel with 10x10 Pin Array ML20206P2321999-05-10010 May 1999 Proposed Tech Specs Section 3.7.4,providing Specific Conditions & Required Actions for Control Bldg Barrier Degradation (as Opposed to Ventilation Train Degradation) ML20206P7401999-05-10010 May 1999 Proposed Tech Specs,Revising SLMCPR to Support Operation with GE-12 with 10x10 Pin Array ML20206J3011999-04-30030 April 1999 Proposed Tech Specs Pages,Revising TS Surveillance Requirement 3.4.3.1 to Implement More Appropriate Safety Valve & Safety Relief Valve Setpoint Tolerances ML20205P8031999-04-12012 April 1999 Proposed Tech Specs Re Relaxation of Excess Flow Check Valve Surveillance Testing ML20202E5931999-01-22022 January 1999 Proposed Tech Specs SR 3.8.1.7 Re Rev to DG Surveillance Requirement ML20204A7541999-01-22022 January 1999 Proposed Tech Specs Re Spent Fuel Racks Storage Update ML20206S2421999-01-21021 January 1999 Proposed Tech Specs Surveillance Requirement 3.8.1.7 for EDGs ML20154P6621998-10-15015 October 1998 Proposed Tech Specs 3.6.1.3,revising Condition E to Add Time Limit for Plant Operation If Penetration Flow Path Isolated by Single Purge Valve with Resilient Seal & Adding TS for Cb/Sbgt IAS NG-98-0720, Proposed Improved Tech Specs Page 5.0-21 for Reporting Requirements1998-04-17017 April 1998 Proposed Improved Tech Specs Page 5.0-21 for Reporting Requirements ML20217B8271998-04-15015 April 1998 Proposed Tech Specs Re RTS-300,revising Reactor Vessel pressure-temp Curve Update ML20203M5021998-02-26026 February 1998 Proposed Tech Specs Re Improved Conversion of Plant ML20199K9871998-02-0303 February 1998 Proposed Tech Specs Re Vessel Hydrostatic Pressure & Leak Testing Operability Requirements ML20199K9601998-02-0303 February 1998 Proposed Tech Specs Re Standby Liquid Control Operability Requirements ML20198P8871998-01-0909 January 1998 Proposed Tech Specs Section 3.7.B LCO for PCIVs Revised to Allow 72 Hours to Isolate Failed Valve Associated W/Closed Sys ML20203G5331997-11-21021 November 1997 Proposed Tech Specs Marked Up Pages for Improved TS for Rev a Showing Changes for Rev B ML20211J2331997-10-0303 October 1997 Proposed Tech Specs,Supplementing thermal-hydraulic Analysis Included as License Rept in 930326 to Murley NG-97-1010, Proposed Tech Specs Change for Instrument Setpoints1997-06-10010 June 1997 Proposed Tech Specs Change for Instrument Setpoints NG-97-0847, Proposed Tech Specs Revising Definition of LCO to Address Situation When Sys & Components Are Removed from Svc or Otherwise Made Inoperable During Secondary Modes of Operation,W/O Requiring Entry Into LCO Actions1997-05-0909 May 1997 Proposed Tech Specs Revising Definition of LCO to Address Situation When Sys & Components Are Removed from Svc or Otherwise Made Inoperable During Secondary Modes of Operation,W/O Requiring Entry Into LCO Actions ML20141D3621997-05-0909 May 1997 Proposed Tech Specs Revising Definitions of LSSS & Instrument/Channel Calibration to Ref New Program Being Added to TS for Control of Instrument Setpoints ML20115E0301996-07-0505 July 1996 Proposed TS Table 3.6.B.2-1,raising Reactor Water Conductivity Limit to Support Implementation of Noble Metal Chemical Addition at Plant as Method to Enhance Effectiveness of HWC in Mitigating IGSCC ML20101Q7191996-04-0909 April 1996 Proposed Tech Specs Re Recirculation Pump Trip Min Operable Channels ML20097A1871996-01-30030 January 1996 Proposed Tech Specs Revising Certain CR Scram Insertion Time Testing Limits ML20096F0211996-01-18018 January 1996 Proposed Tech Specs,Lowering RWCU Isolation Setpoint from Reactor Low Level to Reactor low-low Level ML20099L8491995-12-22022 December 1995 Proposed Tech Spec 3.7, Plant Containment Sys ML20095H2371995-12-15015 December 1995 Proposed Tech Specs,Incorporating EDG Conditional Surveillance & Editorial Clarifications ML20095A9011995-11-30030 November 1995 Proposed Tech Specs to Implement Option I-D Reactor Stability Solution ML20094M4131995-11-15015 November 1995 Proposed Tech Specs Re RPT Operability & Surveillance Requirements ML20087F5831995-08-0707 August 1995 Proposed Tech Specs Sections 6.5.2.8 & 6.5.3 Re Changes to Audit Program ML20086R8061995-07-21021 July 1995 Proposed Tech Specs,Eliminating Inappropriate Condition Surveillance in Sections 4.5 & 4.8,clarifying Requirements Governing Spent & New Fuel Storage in Section 5.5 ML20087H7021995-04-28028 April 1995 Proposed Tech Specs Bases Page 3.5-20,adding Clarification for Single Core Spray Pump Requirement ML20082S0201995-04-21021 April 1995 Proposed Tech Specs Reflecting Deletion of TS 6.5.3.1.2 Due to Audit Frequency Requirements Being Removed from TS ML20082D1171995-03-28028 March 1995 Proposed TS Table 3.2-A, Isolation Actuation Instrumentation ML20081C9891995-03-10010 March 1995 Proposed Tech Specs,Removing Redundant LCOs & SRs for Containment Hydrogen & Oxygen Monitors ML20080Q8731995-03-0101 March 1995 Proposed Tech Specs Reflecting Rev to TS Table of Contents, Incorporating New Section ML20080Q0851995-03-0101 March 1995 Proposed Tech Specs Modifying Pump & Valve Surveillance Criteria for LPCI & Core Spray Subsystems,Rhr Svc Water, Hpci,Esw & River Water Supply Systems from Once Every Three Months to Frequency Specified by DAEC ASME Section XI IST ML20078R9171995-02-13013 February 1995 Proposed TS Section 6.5.2.8 & 6.5..3.1,reflecting Deletion of Audit Frequency Requirements ML20080H5651995-02-13013 February 1995 Proposed Tech Specs Re Bases for Shutdown Cooling Piping Safety Limit ML20077A9191994-11-10010 November 1994 Proposed Tech Specs Re Offgas Radiation Monitors ML20149G9241994-10-28028 October 1994 Proposed Tech Specs,Deleting Plan for Integrated Scheduling of Plant Mods ML20076K9591994-10-20020 October 1994 Revised Proposed TS to TS Changes RTS-246 & RTS-246A ML20072F1651994-08-15015 August 1994 Proposed Tech Specs Increasing Allowable Main Steam Isolation Valve & Deleting TS Requirements Applicable to MSIV LCS ML20071Q6211994-07-29029 July 1994 Proposed Tech Specs Revising Isi/Ist Program Requirements ML20070H3321994-07-12012 July 1994 Proposed Tech Specs Surveillance Frequencies for Rod Block Instrument Sys ML20070E0411994-06-30030 June 1994 Proposed Tech Specs,Clarifying Requirements for Audit of Conformance to Tss,Deleting Requirement for Safety Committee Oversight of Audits & Allowing Designation of Signature Authority ML20070E0621994-06-30030 June 1994 Proposed Tech Specs Re Addition of Control Bldg Chiller Operability & Surveillance Requirements ML20070E0251994-06-30030 June 1994 Proposed Tech Specs Re Revision of ESW Flow Requirement 4.8.e.1 ML20069G9181994-05-27027 May 1994 Proposed TS Section 3.7, Containment Sys ML20069A9961994-05-0606 May 1994 Proposed TS SRs Section 4.6.G, Primary Sys Boundary Structural Integrity, Deleting SR Which Refers to ISI Program Interval,Allowing DAEC Current ISI Program Interval to Be Extended Per Ruling in Fr 57FR34666 1999-09-15
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212B9961999-09-15015 September 1999 Proposed Tech Specs Page 3.3-52,deleting Condition G as Well as or G from Condition H,Per TS Change Request TSCR-003 ML20210B9411999-07-16016 July 1999 Proposed Tech Specs Revising SLMCPR to Support Operation with GE-12 Fuel with 10x10 Pin Array ML20206P2321999-05-10010 May 1999 Proposed Tech Specs Section 3.7.4,providing Specific Conditions & Required Actions for Control Bldg Barrier Degradation (as Opposed to Ventilation Train Degradation) ML20206P7401999-05-10010 May 1999 Proposed Tech Specs,Revising SLMCPR to Support Operation with GE-12 with 10x10 Pin Array ML20206J3011999-04-30030 April 1999 Proposed Tech Specs Pages,Revising TS Surveillance Requirement 3.4.3.1 to Implement More Appropriate Safety Valve & Safety Relief Valve Setpoint Tolerances ML20205P8031999-04-12012 April 1999 Proposed Tech Specs Re Relaxation of Excess Flow Check Valve Surveillance Testing ML20202E5931999-01-22022 January 1999 Proposed Tech Specs SR 3.8.1.7 Re Rev to DG Surveillance Requirement ML20204A7541999-01-22022 January 1999 Proposed Tech Specs Re Spent Fuel Racks Storage Update ML20206S2421999-01-21021 January 1999 Proposed Tech Specs Surveillance Requirement 3.8.1.7 for EDGs ML20207E9931999-01-0707 January 1999 Rev 15 to Pump & Valve IST Program for Daec ML20205P8091998-11-30030 November 1998 Excess Flow Check Valve Testing Relaxation ML20154P6621998-10-15015 October 1998 Proposed Tech Specs 3.6.1.3,revising Condition E to Add Time Limit for Plant Operation If Penetration Flow Path Isolated by Single Purge Valve with Resilient Seal & Adding TS for Cb/Sbgt IAS ML20236T8621998-06-15015 June 1998 Third Ten Yr Interval ISI Summary Rept Refueling Outage 15 from 961116-980522 for DAEC Palo,Ia NG-98-0720, Proposed Improved Tech Specs Page 5.0-21 for Reporting Requirements1998-04-17017 April 1998 Proposed Improved Tech Specs Page 5.0-21 for Reporting Requirements ML20217B8271998-04-15015 April 1998 Proposed Tech Specs Re RTS-300,revising Reactor Vessel pressure-temp Curve Update ML20203M5021998-02-26026 February 1998 Proposed Tech Specs Re Improved Conversion of Plant ML20199K9871998-02-0303 February 1998 Proposed Tech Specs Re Vessel Hydrostatic Pressure & Leak Testing Operability Requirements ML20199K9601998-02-0303 February 1998 Proposed Tech Specs Re Standby Liquid Control Operability Requirements ML20198P8871998-01-0909 January 1998 Proposed Tech Specs Section 3.7.B LCO for PCIVs Revised to Allow 72 Hours to Isolate Failed Valve Associated W/Closed Sys ML20203G5331997-11-21021 November 1997 Proposed Tech Specs Marked Up Pages for Improved TS for Rev a Showing Changes for Rev B ML20211J2331997-10-0303 October 1997 Proposed Tech Specs,Supplementing thermal-hydraulic Analysis Included as License Rept in 930326 to Murley NG-97-1010, Proposed Tech Specs Change for Instrument Setpoints1997-06-10010 June 1997 Proposed Tech Specs Change for Instrument Setpoints NG-97-0847, Proposed Tech Specs Revising Definition of LCO to Address Situation When Sys & Components Are Removed from Svc or Otherwise Made Inoperable During Secondary Modes of Operation,W/O Requiring Entry Into LCO Actions1997-05-0909 May 1997 Proposed Tech Specs Revising Definition of LCO to Address Situation When Sys & Components Are Removed from Svc or Otherwise Made Inoperable During Secondary Modes of Operation,W/O Requiring Entry Into LCO Actions ML20141D3621997-05-0909 May 1997 Proposed Tech Specs Revising Definitions of LSSS & Instrument/Channel Calibration to Ref New Program Being Added to TS for Control of Instrument Setpoints ML20138D9791996-12-0505 December 1996 Rev 9 to Offsite Dose Assessment Manual for Gaseous & Liquid Effluents ML20115E0301996-07-0505 July 1996 Proposed TS Table 3.6.B.2-1,raising Reactor Water Conductivity Limit to Support Implementation of Noble Metal Chemical Addition at Plant as Method to Enhance Effectiveness of HWC in Mitigating IGSCC ML20101Q7191996-04-0909 April 1996 Proposed Tech Specs Re Recirculation Pump Trip Min Operable Channels ML20108B6271996-03-15015 March 1996 Rev 0 to Third Ten-Yr Insp Interval ISI Plan for DAEC Palo, Ia ML20097A1871996-01-30030 January 1996 Proposed Tech Specs Revising Certain CR Scram Insertion Time Testing Limits ML20096F0211996-01-18018 January 1996 Proposed Tech Specs,Lowering RWCU Isolation Setpoint from Reactor Low Level to Reactor low-low Level ML20099L8491995-12-22022 December 1995 Proposed Tech Spec 3.7, Plant Containment Sys ML20095H2371995-12-15015 December 1995 Proposed Tech Specs,Incorporating EDG Conditional Surveillance & Editorial Clarifications ML20095A9011995-11-30030 November 1995 Proposed Tech Specs to Implement Option I-D Reactor Stability Solution ML20094M4131995-11-15015 November 1995 Proposed Tech Specs Re RPT Operability & Surveillance Requirements ML20129H0041995-10-13013 October 1995 Weld Ref Sys ML20087F5831995-08-0707 August 1995 Proposed Tech Specs Sections 6.5.2.8 & 6.5.3 Re Changes to Audit Program ML20086R8061995-07-21021 July 1995 Proposed Tech Specs,Eliminating Inappropriate Condition Surveillance in Sections 4.5 & 4.8,clarifying Requirements Governing Spent & New Fuel Storage in Section 5.5 ML20087H7021995-04-28028 April 1995 Proposed Tech Specs Bases Page 3.5-20,adding Clarification for Single Core Spray Pump Requirement ML20082S0201995-04-21021 April 1995 Proposed Tech Specs Reflecting Deletion of TS 6.5.3.1.2 Due to Audit Frequency Requirements Being Removed from TS ML20082D1171995-03-28028 March 1995 Proposed TS Table 3.2-A, Isolation Actuation Instrumentation ML20081C9891995-03-10010 March 1995 Proposed Tech Specs,Removing Redundant LCOs & SRs for Containment Hydrogen & Oxygen Monitors ML20080Q8731995-03-0101 March 1995 Proposed Tech Specs Reflecting Rev to TS Table of Contents, Incorporating New Section ML20080Q0851995-03-0101 March 1995 Proposed Tech Specs Modifying Pump & Valve Surveillance Criteria for LPCI & Core Spray Subsystems,Rhr Svc Water, Hpci,Esw & River Water Supply Systems from Once Every Three Months to Frequency Specified by DAEC ASME Section XI IST ML20080H5651995-02-13013 February 1995 Proposed Tech Specs Re Bases for Shutdown Cooling Piping Safety Limit ML20078R9171995-02-13013 February 1995 Proposed TS Section 6.5.2.8 & 6.5..3.1,reflecting Deletion of Audit Frequency Requirements ML20078L1201995-01-26026 January 1995 Rev 13 to Pump & Valve IST Program for Daec ML20077A9191994-11-10010 November 1994 Proposed Tech Specs Re Offgas Radiation Monitors ML20149G9241994-10-28028 October 1994 Proposed Tech Specs,Deleting Plan for Integrated Scheduling of Plant Mods ML20076K9591994-10-20020 October 1994 Revised Proposed TS to TS Changes RTS-246 & RTS-246A ML20072F1651994-08-15015 August 1994 Proposed Tech Specs Increasing Allowable Main Steam Isolation Valve & Deleting TS Requirements Applicable to MSIV LCS 1999-09-15
[Table view] |
Text
.
- s., -
i RTS-279 - to NG-95-0286.
Page1 of I PROPOSED CllANGE RTS-279 TO THE DUANE ARNOLD ENERGY C_ ENTER TECIINICAL SPECIFICATIONS The holders oflicense DPR-49 for the Duane Arnold Energy Center propose to amend Appendix A (Technical Specifications) to said license by deleting a certain current page and replacing it with the attached, new page. The Affected Page is given below.
t AFFECTED PAGE i
3.7-15 i
i SUMM ARY OF CIIANGES_;
The following list of proposed changes is in the order that the changes appear in the Technical -
Specifications (TS).
hgg Description of Changes 3.7-15 Delete Sections 3.7/4.7.11.3, redundant Limiting Conditions for Operation and Surveillance Requirements.
i These changes are consistent with the BWR/4 Dran improved Technical Specifications, NUREG-1433.
i i
C t
9503200087 950310 PDR ADOCK 05000331 P
PDR i
DAEC-1 LIMITING CONDITIONS "P OPERATION SURVEILLANCE PEOUIREMENTS H.
Containment Atreschere Dilutien H.
Containment Atmosehere Dilution 1.
Whenever the reactor is in power 1.
The post-LOCA containment operation and the primary atmosphere dilution syst,em shall containment is required to be be functionally tested annually, inerted per TS section 3.7.I.1, the Post-LOCA Containment Atmosphere Diiution System m2st l
be OPERABLE and capable of supplying nitrogen to the containment for atmosphere dilution if required by post-LOCA conditions.
If this specification cannot be met, the system must be restored to an operable condition within 7 days or be in at least HOT SHUTDOWN i
within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2.
Whenever the reactor is in power 2.
The volume in the N storage bank l
operation, the post-LOCA shall be recorded weekly.
Containment Atmosphere Dilution System shall contain a minimum of 50,000 scf of N as determined by pressure and temperature measurements.
If this specification cannot be met, the minimum volume will be restored within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
e ng e d io e or ur ei a e re i nt r h l
o a
fr h a at s t d's a yz rs a ad a z rs se i e
a ci le i
.2 T
e d
-h su r as n o ph e an ly in se m h 1 ch r r a ci le i T c1 e
n i a ly e e a u 1 1
32 co un ti n i ef at o 4.
.H 1.
AMENDMENT NO.'Jf),//),Jpp,201 3.7-15 ars. m a/9s
RTS-279 to NG-95-0286 Page1of 1 SAFETY ASSESSMENT Intlos!.uction By letter dated March 10,1995, IES Utilities Inc. submitted a request for s ofthe Technical Specifications (TS) for the Duane Arnold Energy Center (DAEC). I he proposed changes will remove redundant requirements for containment hydrogen and oxygen analyzers.
Surveillance Requirements cited in TS Section 4.7.11.3 are redundant to the requirements e/ Table 4.2-11. Table 4.2-11 requires a semi-annual test of the containment hydrogen and oxygen analyzers This duplicates and exceeds the requirement for an annual functional test required in TS Section 4.7.11.3. TS Section 3.7.11.3 refers directly to Table 3.2-11 for Limiting Conditions for Operation. Therefore, deleting TS Sections 3.7/4.7.11.3 will eliminate redundant requirements without reducing the frequency of equipment testing or changing the applicable Limiting Conditions for Operation. These changes are consistent with the BWIU4 Draft Improved Technical Specifications, NUREG 1433.
Assessng!1t The proposed change to the DAEC TS will remove redundant Limiting Conditions for Operation and Surveillance Requirements for the containment hydrogen and oxygen analyzers. This change will not reduce the amount or frequency of testing of equipment. Based on the above information, we have concluded that the proposed changes to the DAEC TS are acceptable.
RTS-279 to NG-95-0286 Page1 of 1
. ENVIRONMENTAL CONSIDERATION 10 CFR Section 51.22(c)(9) identifies certain licensing and regulatory actions which are eligible for categorical exclusion from the requirement to perform an environrnental assessment. A proposed amendment to an operating license for a facility requires no environmental assessment if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant hazards consideration; (2) result in a significant change in the types or significant increase in the amounts of any efiluents that may be released offsite; and (3) result in a significant increase in individual or cumulative occupational radiation exposure. IES Utilities Inc. has reviewed this request and determined that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR Section 51.22(c)(9). Pursuant to 10 CFR Section Sl.22(b), no environmental impact statement or environmental assessment needs to be prepared in l
connection with the issuance of the amendment. The basis for this determination follows:
!! asis The change meets the eligibility criteria for categorical exclusion set forth in 10 CFR Section 51.22(c)(9) for the following reases:
1.
As demonstrated in Attachment I to this letter, the proposed Amendment does not involve a significant hazards consideration.
2.
The proposed Amendment includes changes which delete redundant Limiting Conditions for Operation and Surveillance Requirements for containment hydrogen and oxygen analyzers. No changes in plant design or operational strategies will be made as a result of this change; thus, there will be no signifcant change in the types or significant increase in the amounts of any efiluents that may be released ofTsite.
3.
The proposed Amendment includes changes which delete redundant Limiting Conditions for Operation and Surveillance Requirements for containment hydrogen and oxygen analyzers. No changes in plant design or operational strategies will be made as a result of this change; thus, there will be no significant increase in either individual or cumulative occupational exposure.
i 1