NG-98-0720, Proposed Improved Tech Specs Page 5.0-21 for Reporting Requirements

From kanterella
Jump to navigation Jump to search
Proposed Improved Tech Specs Page 5.0-21 for Reporting Requirements
ML20217F930
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 04/17/1998
From:
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
Shared Package
ML20217F927 List:
References
NG-98-0720, NG-98-720, NUDOCS 9804280307
Download: ML20217F930 (3)


Text

1 Attachment to NG-98-0720 l

l Corrected Page to the DAEC ITS 9004200307 900417 PDR ADOCK 05000331 p

PDR l

l

~

Reporting Requirements 5.6 5.6 Reporting Requirements L

5.6.5 CORE OPERATING LIMITS REPORT (COLR)

(. continued) c.

'The core operating limits shall be determined such that all l

applicable limits (e.g.. fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM. transient analysis limits, and. accident analysis limits) of the safety l

analysis are met.

d.

The COLR. including any midcycle revisions or supplements, i

shall be provided upon issuance for each reload cycle to the NRC.

5.6.6 PAM Reoort p

When a report is required by Condition B or of LC0 3.3.3.1.

" Post Accident Monitoring (PAM) Instrumentation." a report shall be submitted within the following 14 days.

The report shall l

outline the prealanned alternate method (s) of monitoring, describe i

the degree to w1ich the alternate method (s) are equivalent to the l

installed PAM channels. justify the areas in which they are not equivalent, the ceuse of the inoperability, and the plans and schedule for restoring the instrumentation channels of the j

i Function to OPERABLE status.

L l

I l

DAEC 5.0-21 Amendment 223 l

Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR)

(continued) c.

The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits. Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM. transient analysis limits, and accident analysis limits) of the safety analysis are met, d.

The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.

5.6.6 PAM Reoort When a report is required by Condition B or F of LCO 3.3.3.1,

" Post Accident Monitoring (PAM) Instrumentation." a report shall be submitted within the following 14 days.

The report shall outline the prealanned alternate method (s) of monitoring, describe the degree to w11ch the alternate method (s) are equivalent to the installed PAM channels, justify the areas in which they are not I

equivalent, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.

~ ~ = = = = = = = = = = = = = = = = = = = = =. = = = = = = = = = = = = =

DAEC 5.0-21 Amendment 223